ID Date Author Target/No.#down Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  676   Friday, July 27, 2018, 14:44 Aaron SchmidtUC#24LP-SISITETM441177-342752-6In progressConditioning Heat Shield for UC#24 & voltage test prep4 Kapton wire routed into the 9-pin connector.
Unused pins are grounded on the bracket.
Friday, July 27, 2018, 14:25: Roughing
  
  675   Monday, July 23, 2018, 14:25 Aaron SchmidtUC#23LP-FEBIAD-CTLITETM2  In progressConditioning Heat Shield for UC#23Monday, July 23, 2018, 14:20: Roughing.
Monday, July 23, 2018, 14:54: Turbo
pumps on. 
 UC#23_emit.dat_error.docxTS-2018-07-2-08-07.rgaTS-2018-07-24-07-20.rgaUC#23.docx 
  648   Tuesday, March 13, 2018, 06:00 Aaron SchmidtUC#22LP-SISITETM4  In progressConditioning Heat Shield for UC#22Tuesday, March 13, 2018, 08:50: Roughing.
Tuesday, March 13, 2018, 09:10: Turbo
Pumps started.
  
  581   Thursday, May 04, 2017, 13:49 Aaron SchmidtUC#20LP-IG-LIS     Conditioning Heat shield for UC#20 (1)Thursday, May 04, 2017, 13:48: Roughing.
Thursday, May 04, 2017, 14:09: Turbos
on.
 UC#20_Heat_shield_conditioning-1.docxTS-2017-05-05-07-35.rga 
  582   Friday, May 05, 2017, 14:28 Aaron SchmidtUC#20LP-IG-LIS     Conditioning Heat shield for UC#20 (2) New O-rings installed on FS#3.
Friday, May 05, 2017, 14:24: Roughing.
Friday, May 05, 2017, 14:34: Waterlines
 UC#20_Heat_shield_conditioning-2.docxTS-2017-05-05-17-11.rgaTS-2017-05-11-07-50.rga 
  572   Friday, March 10, 2017, 15:42 Aaron SchmidtUC#19   41882-441751-2In progressConditioning Heat shield for UC#19Friday, March 10, 2017, 15:40: Roughing.
Friday, March 10, 2017, 15:58: Turbo
pumps started.
 TS-2017-03-10-16-20.rgaOMEGA_OM-DAQPRO-5300_22-Mar-17_09.05.23.dlp 
  549   Thursday, October 27, 2016, 13:37 Aaron SchmidtUC#18LP-SISITWTM2 41751-3In progressConditioning Heat shield for UC#18Thursday, October 27, 2016, 13:36: Roughing.
Thursday, October 27, 2016, 14:27:
Turbo pumps started.
 UC#18_Heat_shield_conditioning.docxTS-2016-10-27-16-00.rga 
  510   Wednesday, June 01, 2016, 10:02 Aaron SchmidtUC#16LP-IG-LISITETM439814-V2-1  Conditioning Heat shield for UC#16Wednesday, June 01, 2016, 10:02: Begin
roughing.
Wednesday, June 01, 2016, 10:44:
 OMEGA_OM-DAQPRO-5300_03-Jun-16_08.14.47.dlpTS-2016-06-02_UC#16.rgaTS-2016-06-02-13-46_UC#16.rgaUC#16.docx 
  403   Monday, September 08, 2014, 16:23 Anders MjosUC#11  TM440282-5 DoneUC#11 Heat Shield ConditioningT/C installed
CH 1: Attached to TGHT outside middle
CH 2: Through HS outside TGHT right
 Thermocouples.xlsx 
  394   Friday, July 18, 2014, 11:30 Anders MjosUC#10LP-SISITETM440282-540316-1DoneUC#10 Heat Shield ConditioningFriday, July 18, 2014, 11:30: Roughing
Friday, July 18, 2014, 11:51: Starting
turbos
  
  1029   Wednesday, November 13, 2024, 14:36 Aaron SchmidtUC#(47) - Not includedLP-SISITETM344691-845235-24In progressConditioning UC#47 (Assembly only)Gas line is attached. 
Wednesday, November 13, 2024, 14:18:
Roughing.
 UC#47_empty_conditioning_test_1_-_Failed.docxUC#47_empty_conditioning_test_2.docx 
  1009   Friday, May 17, 2024, 17:24 Brady BorrmannUC#LP-FEBIADITE 44692-445235-18In progressConditioning Spare Development TargetFriday, May 17, 2024, Spare FEBIAD Development
target installed
Friday, May 17, 2024, 17:00: Roughing
  
  1028   Tuesday, November 05, 2024, 16:40 Brady BorrmannUC #24D (Assembly only)LP-IG-LIS   44972-5 / 42972-9In progressConditioning UC#24D Assembly42972-5 Base / 42972-9 Lid
  
  22   Thursday, October 13, 2011, 12:33 Rick MaharajTraining       Test stand ventedtest stand vented   
  23   Thursday, October 13, 2011, 15:42 Anders MjosTraining HP-FEBIAD    Problems/SolutionsTarget ready to be heated

    

       
            
  
  1011   Wednesday, June 19, 2024, 15:50 Brady BorrmannTiC#9HP-SIS  45447-2945235-19In progressConditioning TiC#9Wednesday, June19, 2024, Spare TiC HP-SIS
target installed. TiC#24C
Wednesday, June19, 2024, 15:00: Roughing
 2024-06-21_HPTiC-24C_target_characterization.docx 
  1007   Friday, April 26, 2024, 13:49 Aaron SchmidtTiC#7HP-FEBIADITWTM445447-545235-15In progressConditioning TiC#7FM-SW calibrated leak installed.
Friday, April 26, 2024, 13:48: Roughing.
Friday, April 26, 2024, 14:20: TP1B
  
  962   Monday, April 17, 2023, 14:08 Aaron SchmidtTiC#6HP-FEBIADITWTM244692-1045235-12In progressConditioning TiC#6Monday, April 17, 2023, 14:03: Roughing.
Monday, April 17, 2023, 14:08: BV1A
open.
  
  965   Friday, May 05, 2023, 06:49 Aaron SchmidtTiC#6HP-FEBIADITWTM244692-1045235-12In progressConditioning TiC#6Ceramic elbow installed on the anode.
Friday, May 05, 2023, 06:47: Roughing.
Friday, May 05, 2023, 07:24: TP1B
 TiC#6_Anode_&_Coil_checks.docx 
  960   Wednesday, March 29, 2023, 12:22 Aaron SchmidtTiC#5LP-FEBIADITETM444692-745235-20FailedConditioning TiC#5Wednesday, March 29, 2023, 09:15: Roughing.
Wednesday, March 29, 2023, 12:22:
TP1B on.
 TiC#5_conditioning.docx 