ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
1023
|
Thursday, October 03, 2024, 16:26 |
Aaron Schmidt | Ta#68 | HP-SIS | ITE | TM2 | 45447-26 | 45235-16 * | | Conditioning Ta#68 | HS note:
Base# 45235-16
Lid# 39956-8 |
|
1002
|
Tuesday, April 09, 2024, 16:01 |
Aaron Schmidt | Empty (Online) | LP-FEBIAD | ITW | TM4 | 45447-24 | 42972-8 | In progress | Conditioning empty FEBIAD for online use | Tuesday, April 09, 2024, 15:25: Roughing.
Wednesday, April 10, 2024,
05:41: TP1B on. |
|
1004
|
Wednesday, April 17, 2024, 14:16 |
Aaron Schmidt | Empty (Online) | LP-FEBIAD | ITW | TM4 | 45447-24 | 42972-8 | In progress | Conditioning empty FEBIAD for online use - Run 2 | https://elog.triumf.ca/TIS/Test-Stand/1003
EE Issue resolved. TS closed up.
Wednesday, April 17, 2024, 14:08: |
|
1016
|
Wednesday, July 31, 2024, 18:50 |
Aaron Schmidt | TiC Spare | HP-FEBIAD | ITW | TM4 | 45447-2 | 42752-7 | In progress | Conditioning Spare for TiC#7 | Wednesday, July 31, 2024, 18:47: Roughing.
Wednesday, July 31, 2024, 19:24:
TP1B on. |
|
992
|
Monday, January 22, 2024, 13:55 |
Aaron Schmidt | | LP-SIS | | | 45447-19 | 45235-22 | In progress | Conditioning UCx HS - 2 | Conditioning HS for UCx. LP-SIS oven /
end caps installed
Monday, January 22, 2024, 13:53: |
|
1022
|
Friday, September 20, 2024, 14:22 |
Aaron Schmidt | Ta# | LP-SIS | ITE | TM2 | 45447-18 | 45235-13 | | Conditioning Ta# | https://elog.triumf.ca/TIS/Target+Production/146
Has not run through EVAP2.
Friday, September 20, 2024, 14:04: |
|
1018
|
Friday, August 09, 2024, 21:08 |
Ferran Boix Pamies | Ta#67 Thin foils | LP-SIS | ITE | TM4 | 45447-14 | 45235-10 | In progress | Ta#67 thin foil retesting | Friday, August 09, 2024, 21:07 Insulators,
retainer and Re foil have been replaced,
source cup machined so the ion source does |
|
1014
|
Thursday, July 25, 2024, 14:26 |
Dave Neilson | Ta#67 Thin foil | LP-SIS | ITE | TM3 | 45447-14 | 45235-10 | | Conditioning Ta#67 Thin foil | Thursday, July 25, 2024, 14:25 -
competing electrical checks prior to test
stand installation |
|
1015
|
Monday, July 29, 2024, 23:02 |
Aurelia Laxdal | Ta#67 Thin foils | LP-SIS | ITE | TM3 | 45447-14 | 45235-10 | | Cooldown for removing the V wires | 22:55 Cooldown completed to remove
the voltage wires from inside the vacuum
box. |
|
983
|
Wednesday, October 18, 2023, 15:43 |
Aaron Schmidt | | LP-SIS | | | 45447-12 | 45235-17 | In progress | Conditioning UC#43 (empty) w/ gas line | Thermocouples attached on end plate
Indium salt @ 10 µl
3 wraps of Ta HS on oven. Gas line |
|
923
|
Thursday, May 05, 2022, 14:43 |
Aaron Schmidt | | P2N-SIS | | | 45241-1 | 45240-1 | In progress | P2N assembly conditioning. | Thursday, May 05, 2022, 14:43: Roughing.
Open BV1B
Thursday, May 05, 2022, 14:46: Upper |
|
925
|
Tuesday, May 10, 2022, 10:09 |
Aaron Schmidt | | P2N-SIS | ITE | TM4 | 45241-1 | 45240-1 | In progress | P2N assembly conditioning - 2 | Ref: https://elog.triumf.ca/TIS/Test-Stand/924.
During testing, it was noted one leg was
glowing vs the other. P2N assembly was removed |
|
942
|
Tuesday, October 18, 2022, 13:25 |
Aaron Schmidt | C#5 | LP-SIS | | | 45235-5 | 44691-13 | In progress | Conditioning C#5 | Tuesday, October 18, 2022, 13:25: Roughing.
Tuesday, October 18, 2022, 13:28:
BV1A open |
|
944
|
Tuesday, November 15, 2022, 11:24 |
Aaron Schmidt | UC#41 assembly | LP-SIS | ITE | TM4 | 45220-8 | 45235-4 | In progress | Conditioning UC#41 assembly | LP-SIS 45220-8 is empty & for
testing only.
Tuesday, November 15, 2022, 11:00: |
|
967
|
Tuesday, May 16, 2023, 14:00 |
Aaron Schmidt | Ta#65 | LP-SIS | ITE | TM4 | 45220-7 | 45235-2 | In progress | Conditioning Ta#65 | Calibrated window installed on the beam
line.
Tuesday, May 16, 2023, 13:45: Roughing |
|
975
|
Wednesday, August 09, 2023, 14:29 |
Aaron Schmidt | | LP-SIS | | | 45220-6 | 45235-3 | In progress | Graphite target test 1 (C2023A) | Graphite
experiment 2: ID Gr-230601, WO#45220-6 (
|
|
980
|
Monday, September 25, 2023, 16:31 |
Aaron Schmidt | Ta#66 | LP-SIS | ITW | TM2 | 45220-5 | 45235-9 | Done | Conditioning Ta#66 & HV Tests. | Thermocouples installed on the left end
plate x 2.
Monday, September 25, 2023, 16:23: |
|
982
|
Tuesday, October 10, 2023, 15:46 |
Aaron Schmidt | Ta#68 (Spare) | LP-SIS | | | 45220-3 | 45235-11 | In progress | Conditioning Ta#68 (Spare) | Tuesday, October 10, 2023, 15:18: Roughing.
Tuesday, October 10, 2023, 15:46:
TP1B on. |
|
984
|
Monday, October 30, 2023, 16:01 |
Aaron Schmidt | | LP-SIS | | | 45220-2 | 45235-13 | In progress | HV power surge test plus mass scans | Monday, October 30, 2023, 16:00
Roughing
Tuesday, October 31, 2023, |
|
986
|
Monday, November 27, 2023, 16:09 |
Ferran Boix Pamies | | LP-SIS | | | 45220-2 | 45235-13 | In progress | HV power surge test plus mass scans | Monday, November 27, 2023, 16:09
Roughing
Monday, November 27, 2023, 17:22 |
|
|