  RH-Meson Hall, Page 4 of 18  Not logged in ELOG logo
ID Date Author Categorydown Type Specific Subject Text Attachments
  232   Wednesday, January 10, 2018, 17:45 Isaac EarleStandard OperationTarget 2TargetT2-MK2 beam spot photos, M20BB moved to storage pit The T2-MK2 target was moved from
the beamline to the hot cell on January 8th. 
The field at 0.5m was 130mSv/hr.  Photographs
 T2-MK2_Position_4_beam_spot_photo_-_12mm_Be_-_Jan_10_2018.jpgT2-MK2_Position_4_beam_spot_photo_-_12mm_Be_-_Jan_10_2018_s.jpg 
  233   Thursday, March 22, 2018, 17:24 Isaac EarleStandard OperationOtherActive SumpRH Lab active sump released The RH Lab active sump level reached
the high limit yesterday due to an overflow
of the ultrasonic cleaner in the Rad Waste
  
  234   Wednesday, March 28, 2018, 10:12 Isaac EarleStandard OperationOtherOtherFive waste pails moved to East Vault Tunnel for storage Five 5 gallon metal pails with active
waste were moved from the Warm Cell to the
Cyclotron East Vault Tunnel today for long
  
  235   Friday, April 06, 2018, 15:05 Isaac EarleStandard OperationTarget 2TargetT2-MK2 target MROThe following is a summary of MRO work
done on the T2-MK2 target during the 2018
shutdown:
  
  243   Tuesday, August 28, 2018, 11:16 Isaac EarleStandard OperationOtherOtherSouth TNF Holding Tank water released The water in the South TNF Holding
Tank was released today under work permit
#C2018-08-28-3.  The tank contained
  
  253   Tuesday, December 17, 2019, 12:39 Isaac EarleStandard OperationOtherOther55 gallon drum and old M9 service stand moved to Rad Waste PitThe following items were moved today from
the Warm Cell to the Rad Waste Pit for long
term storage:
 RWC-55-01-2019.pdfpit_-_before_move.jpgdrum_being_lifted.jpgpit_-_after_move_-_showing_drum.jpgpit_-_after_move_-_showing_service_stand_(bottom_right_with_green_sling).jpg 
  262   Monday, April 06, 2020, 15:02 Isaac EarleStandard OperationTarget 2M9M9 beam blocker returned to beamlineThe M9 beam blocker was returned to the
beamline today using the RH shielded transport
flask.  The top flange o-ring was replaced
  
  271   Tuesday, November 24, 2020, 15:10 Isaac EarleStandard OperationTarget 2TargetAdditional targets added to T2-MK1 ladder The following work on the T2-MK1
target was completed sporadically over the
last few months:
  
  273   Wednesday, March 31, 2021, 16:15 Matthew GareauStandard OperationTarget 1TargetT1-MK1 target exchange March 29 Monday
- moved T1-MK1 target from beamline
to hotcell  (field from target 15mSv/hr
 IMG_20210330_140744.jpgIMG_20210330_141059.jpgIMG_20210330_141455.jpgT1-MK1_-_2021.pdf 
  275   Wednesday, April 14, 2021, 14:30 Isaac EarleStandard OperationOtherActive SumpRH Lab Active Sump pumped out The RH Lab Active Sump reached the
high level sensor at some point overnight
before the April 8th work day.  Maico
  
  285   Wednesday, March 16, 2022, 14:16 Matthew GareauStandard OperationOtherCoolingT1/T2 water packages drained to B1A AWHT, tested, and released. Also solenoid valve SV1 broken The T1/T2 water packages were drained
into the B1AAWHT (280L), the water was sampled
and tested by RPG, results included in elog.
 11_Mar_2022_Tritium_Records_T1_T2_from_RPG.pdfsolenoid_valve_SV1.jpg 
  286   Wednesday, April 13, 2022, 12:31 Adam NewsomeStandard OperationTarget 2TargetT2-MK2 moved: from target station to storageThe T2-MK2 target was moved from the target
station to the storage area (position 3).
Upon removal, it was measured with a pole
  
  287   Wednesday, April 13, 2022, 12:33 Adam NewsomeStandard OperationTarget 2TargetT2-MK1 moved: from storage area to target stationThe T2-MK1 target was moved from the storage
area (formerly position 4) to the target
station. Services were reconnected in order
  
  289   Wednesday, May 04, 2022, 11:27 Adam NewsomeStandard OperationTarget 2M9M9 and M20 Beam Blocker Actuation TestThe beam blockers for M9 and M20 were actuated,
and vacuum was monitored to ensure no disruptions.
Both actuation tests were successful. Motion
  
  291   Thursday, May 05, 2022, 14:39 Adam NewsomeStandard OperationTarget 1TargetT1-MK1 and T2-MK1 profile monitor actuation testThe profile monitor actuation tests were
completed for T1 and T2. No abnormalities
were noticed in vacuum during either test.
  
  292   Wednesday, May 25, 2022, 10:15 Adam NewsomeStandard OperationTarget 1TargetT1-MK2 moved from hot cell to storage areaThe T1-MK2 target was moved from the hot
cell to the storage area, in position 5.
Note: manual nudging of the flask was required
  
  293   Wednesday, May 25, 2022, 10:16 Adam NewsomeStandard OperationTarget 2TargetT2-MK2 moved: from storage location to hot cellTarget T2-MK2 was moved from the storage
location (formerly position 3) to the hot
cell in preparation for replacement of end
  
  299   Monday, August 22, 2022, 09:01 Adam NewsomeStandard OperationOtherActive SumpActive Sump DrainingOn Aug. 18, 2022, Operations informed RH
group that an alarm activated for the full
status of the MHESA B1 RCR1 Lab holding tank.
  
  300   Tuesday, August 23, 2022, 14:36 Adam NewsomeStandard OperationOtherOtherBL1A Holding Tank - Level CheckThe water level inside the BL1A active
water holding tank was checked today (Aug.
23, 2022). The tank is essentially empty
  
  302   Thursday, September 15, 2022, 14:34 Adam NewsomeStandard OperationTarget 2TargetT2-MK2 target elevations measurementThe target elevations measurement and beam
spot checks were completed on Sept. 15, 2022.
This was done after a July 2022 target exchange
 T2-MK2_-_Sept_2022.pdf 