  RH-Meson Hall, Page 3 of 18  Not logged in ELOG logo
ID Date Author Categorydown Type Specific Subject Text Attachments
  164   Tuesday, June 23, 2015, 10:24 Isaac EarleStandard OperationOtherOtherBL1A Holding Tank Water Released The water in the BL1A holding tank
was released to the city sewer.  This
water was sampled, tested, and approved for
  
  167   Wednesday, July 15, 2015, 10:33 Isaac EarleStandard OperationTarget 1CoolingT1 & T2 Cooling System Check- All T1 and T2 values on XTPAGE were stripped
back to April 1, 2015:  All systems
appear to be functioning normally, nothing
  
  172   Monday, September 28, 2015, 10:29 Isaac EarleStandard OperationOtherActive SumpRH Hot Cell Lab Active Sump High Level Sensor Tested The RH hot cell lab active sump high
level sensor was tested as part of the yearly
scheduled inspection.  High water level
  
  174   Wednesday, September 30, 2015, 17:07 Isaac EarleStandard OperationTarget 2TargetTarget Moves for Profile Check - Possible Motor or Control Box FailureThe T1 and T2 targets were moved to position
zero, then back to the target position today
so that beam profile could be checked using
  
  176   Friday, October 02, 2015, 17:25 Ron KuramotoStandard OperationTarget 1TargetRaise Target to lower Rad levels for 1AM7 repairToday the T1MK2 target was moved from Position
4 to Position 0 to lower the Rad fields for
the 1AM7 repair in the 1A Tunnel. The Rad
  
  177   Monday, October 05, 2015, 15:25 Isaac EarleStandard OperationOtherOtherOld T2 Protect Monitor Cassette Update The T2 protect monitor cassette removed
in April 2015 (see E-log #154) was surveyed
today.  It was approximately 3mSv/hr
  
  182   Tuesday, October 13, 2015, 10:52 Isaac EarleStandard OperationTarget 1TargetT1 & T2 Target Ladder Moves The T1 and T2 targets were both moved
from Position 0 to Position 4 at approximately
2:30am on Saturday October 10th using the
  
  185   Monday, January 18, 2016, 17:19 Isaac EarleStandard OperationTarget 1CoolingT1 & T2 Packages Drained; BL1A Holding Tank Released The T1 and T2 cooling packages were
drained to the BL1A holding tank on Jan 8
2016.  The volumes were 100L and 80L
  
  187   Wednesday, February 03, 2016, 17:35 Isaac EarleStandard OperationTarget 2CoolingT2 MRO WorkThe following work was performed at the
T2 cooling package and target between Jan
25 - Feb 3, 2016:
  
  193   Thursday, March 31, 2016, 11:48 Isaac EarleStandard OperationTarget 1TargetT1 & T2 Beryllium Target Manufacturing CompleteManufacturing of a new batch of T1 and
T2 beryllium targets has been completed.
The job was completed under Machine
 T1_T2_Be_Target_Documentation_(2016_Batch).xlsx 
  196   Monday, April 11, 2016, 13:54 Isaac EarleStandard OperationTarget 2TargetT2-MK2 Target Transported from BL to HCThe T2-MK2 target was transported from
the beam line to the hot cell using the transfer
flask.  The target was measured to be
  
  197   Friday, April 15, 2016, 14:54 Isaac EarleStandard OperationTarget 2TargetT2-MK2 Target Changes & Return to BeamlineOn April 11th the T2-MK2 target was flushed
with water, then overnight with air at 5psi
supply pressure.  The target ladder
 T2-MK2_Position_4_Entrance_Side_-_April_14_2016.JPGT2-MK2_Position_4_Exit_Side_-_April_14_2016.JPGIMG_7024.JPGIMG_7026.JPG 
  198   Wednesday, April 20, 2016, 10:01 Isaac EarleStandard OperationTarget 1TargetT1/T2 Monitor Electrical Check CompleteMike Russell from Diagnostics Group has
completed an electrical check on the T1 and
T2 profile and protect monitors.  He
  
  200   Friday, May 13, 2016, 15:04 Isaac EarleStandard OperationTarget 2TargetT2-MK2 Position 4 Adjusted to +1.5mm OffsetThe T2-MK2 target at Position 4 has been
adjust to approximately +1.5mm offset.  This
causes the ladder to be moved downwards,
  
  201   Wednesday, June 15, 2016, 11:00 Isaac EarleStandard OperationTarget 2TargetT2-MK2 Target Moved to Position #1 Position #4 on the T2-MK2 target
has now reached the maximum beam time.  The
target was moved to Position #1 at the nominal
  
  212   Monday, January 09, 2017, 15:07 Isaac EarleStandard OperationTarget 2TargetT2-MK2 Target Moved from BL to HC The T2-MK2 target assembly was moved
from the beam line to the hot cell today.
 A maximum field of 203mSv/hr was measured
  
  213   Thursday, January 12, 2017, 09:21 Isaac EarleStandard OperationTarget 2TargetT2-MK2 Position 1 Beam Spot The beam spot on the 10cm beryllium
target in Position 1 on T2-MK2 (Target ID:
"OCT.06#3") was measured and photographed
 T2-MK2_Posn_1_Beam_Spot_-_Jan_11_2017.jpgT2-MK2_Position_1_Beam_Spot_Measurements_-_Jan_11_2017.pdf 
  214   Thursday, January 19, 2017, 08:55 Isaac EarleStandard OperationTarget 1CoolingT1 MRO work completeThe following work was completed on
the T1 cooling package:
- water drained to BL1A holding
  
  215   Wednesday, March 15, 2017, 16:13 Isaac EarleStandard OperationOtherActive SumpMeson Hall Hot Cell Lab Active Sump Water Released On March 13th in the morning the
Meson Hall Hot Cell Lab active sump reached
the high level sensor.  The system responded
  
  229   Tuesday, October 10, 2017, 12:09 Isaac EarleStandard OperationTarget 2TargetT2-MK2 position 4 target changedThe following work was performed on
the T2-MK2 target assembly during the 2017
fall shutdown:
 20171005_t2target_0010.jpg20171005_t2target_0015.jpg20171005_t2target_0016.jpg 