  268   Thursday, July 09, 2020, 06:44 Isaac EarleDevelopmentOtherM9Alignment of M9 Q1Q2 magnets complete Mike Vogel reported that alignment
of the Q1Q2 assembly w.r.t. the T2 and B1
flanges was completed on July 7.  This
  
  272   Wednesday, February 17, 2021, 10:39 Isaac EarleDevelopmentOtherUCNUCN Target Cask TestingA trial run of remote removal of the UCN
target was performed using the shielded target
cask (TTA0335) developed in 2020.  The
 8x 
  275   Wednesday, April 14, 2021, 14:30 Isaac EarleStandard OperationOtherActive SumpRH Lab Active Sump pumped out The RH Lab Active Sump reached the
high level sensor at some point overnight
before the April 8th work day.  Maico
  
  285   Wednesday, March 16, 2022, 14:16 Matthew GareauStandard OperationOtherCoolingT1/T2 water packages drained to B1A AWHT, tested, and released. Also solenoid valve SV1 broken The T1/T2 water packages were drained
into the B1AAWHT (280L), the water was sampled
and tested by RPG, results included in elog.
 11_Mar_2022_Tritium_Records_T1_T2_from_RPG.pdfsolenoid_valve_SV1.jpg 
  295   Wednesday, July 06, 2022, 12:49 Matthew GareauRepairOtherOtherHelium line damage, and hotcell window oil leakingToday myself and Adam Newsome started the
leak detection steps for a target exchange
and notice that the Helium line was not connected/broken
  
  296   Wednesday, July 06, 2022, 12:49 Adam NewsomeRepairOtherHot CellHot Cell - Helium wand tubing brokenThe tubing for the helium wand inside the
hot cell is broken and needs to be replaced.
More tubing has been ordered and the job
  
  297   Wednesday, July 06, 2022, 12:52 Adam NewsomeOtherOtherHot CellPotential hot cell window oil leakSome oil was noticed around the hot cell
window, on the control panel, and on the
ground below the control panel. A leak is
  
  298   Thursday, July 28, 2022, 12:51 Adam NewsomeRepairOtherHot CellMeson Hall Hot Cell - Nuclear Ventilation IssueIt was reported today by Peter Bratt that
the nuclear ventilation system for the hot
cell is not functioning. At this time, the
  
  299   Monday, August 22, 2022, 09:01 Adam NewsomeStandard OperationOtherActive SumpActive Sump DrainingOn Aug. 18, 2022, Operations informed RH
group that an alarm activated for the full
status of the MHESA B1 RCR1 Lab holding tank.
  
  300   Tuesday, August 23, 2022, 14:36 Adam NewsomeStandard OperationOtherOtherBL1A Holding Tank - Level CheckThe water level inside the BL1A active
water holding tank was checked today (Aug.
23, 2022). The tank is essentially empty
  
  301   Tuesday, August 30, 2022, 14:24 Adam NewsomeMaintenanceOtherHot CellNuclear Ventilation - Filter ChangeMechanical Services Group changed the pre-filter
in the ventilation system on Aug. 29, 2022
as per work permit C2022-08-29-2.
  
  306   Tuesday, January 03, 2023, 07:42 Adam NewsomeOtherOtherActive SumpActive Sump - Level CheckThe sump level was checked by Robin Swanson
on Dec. 31, 2022. It was essentially empty
- see attached photo.
 2022-12-31.jpg 
  309   Monday, January 16, 2023, 09:54 Adam NewsomeStandard OperationOtherCoolingT1 and T2 - Cooling Package DrainedOn Jan. 13, the T1 and T2 cooling package
water reservoirs were drained to the BL1A
holding tank. Water samples were obtained
  
  312   Monday, January 16, 2023, 15:06 Adam NewsomeRepairOtherActive SumpRH Active Sump - draining flow rate sensor repairThe flow rate sensor used to monitor the
drain rate from BL1A holding tank to active
sump, located in the active sump area, was
  
  313   Tuesday, January 17, 2023, 13:46 Adam NewsomeMaintenanceOtherActive SumpFilter Change: RH Active Sump and BL1A Holding Tank Drain OutputThe CUNO filters were changed 2023-01-17
for:

    BL1A Holding Tank drain
 PXL_20230117_195113855.MP.jpgPXL_20230117_195649596.jpg 
  314   Tuesday, January 17, 2023, 13:49 Adam NewsomeRepairOtherActive SumpActive Sump - Valve V6 LeakingIt was noticed today (2023-01-17) that
the valve V6, used in draining the BL1A Holding
Tank to the Active Sump, was leaky. This
  
  318   Friday, February 17, 2023, 14:36 Albert KongRepairOtherWater LeakT1/T2 Water Cooling Package Ball Valve Replacement5 and 3 Swagelok ball valves were replaced
from the T1 and T2 cooling packages respectively.
These are compression fit valves,
 fdb0d111-3348-483d-a78f-98eabbc45507.jpg 
  320   Wednesday, March 01, 2023, 13:10 Albert KongMaintenanceOtherCoolingT1/T2 Water Cooling Package Heat Exchanger Ball Valve Replacement3x 3/4" swagelok ball valves (2x at
T2 and 1x at T1) were replaced after the
water cooling line was shut off at the BL1A
 IMG_1452.JPEGIMG_1431.JPEGIMG_1438.JPEGIMG_1455.JPEG 
  326   Thursday, March 30, 2023, 13:17 Albert KongMaintenanceOtherTargetAir Amplifier Testing: M9 BB (AKA T2 blocker), M20 BB, T2 MK1 prof. monitor, T1 MK1 prof. monitor actuationWe tested the air amplifiers by actuating
the beam blockers and profile monitors on
the T1 and T2 target stations. 
 T1_Mar30_2023_Vacuum.pngT2_Mar30_2023_Vacuum.pngIMG_1907.JPEG 
  328   Wednesday, May 03, 2023, 10:06 Adam NewsomeMaintenanceOtherHot CellMeson Hall Hot Cell - Nuclear Ventilation HEPA Filter Changed, OperationalThe HEPA filter in the nuclear ventilation