  360   Thursday, January 23, 2025, 17:09 Albert KongMaintenanceOtherCoolingT1 T2 water solenoid valves rubber gasket and o-ring exchangeAll rubber components on the T1 T2 water
solenoid valves were exchanged on Jan 22,
2025.
 T1T2WaterSolenoidRubberComponentServicing.pdf 
  361   Monday, January 27, 2025, 12:53 Albert KongStandard OperationOtherTargetT1-MK1 Moved to Storage Pit #4, M9BB Servicing in Hot Cell, T2-MK1 Servicing in Hot Cell, T2-MK2 from Storage Pit #3 to StationDRAWINGS UPLOADED IN PDF, DOWNLOAD TO VIEW
ALL DRAWINGS, PREVI
---------------------------------------------
 13x 
  362   Monday, February 10, 2025, 16:46 Albert KongMaintenanceOtherOtherT1 T2 ASCO Air Solenoid Valve RebuildThe compressed air ASCO valves for the
M9BB, M20BB, T1 Profile Monitor (2x 8342C1
[rebuild kit 306-191] + 1x 8320G216 [rebuild
 Screenshot_2025-02-10_163346.png 
  365   Wednesday, April 23, 2025, 15:58 Adam NewsomeOtherOtherHot Cell Safety Walkaround Complete - Meson Hall HC/WC Area A safety walkaround was completed for the
Meson Hall Hot/Warm Cells.
The resulting spreadsheet can be
  
  366   Thursday, May 01, 2025, 13:25 Riley SykesRepairOtherIndium pumpIndium Extruder Indium extruder Double acting cylinder
repairs and service complete. Adjustments
were made to relief valve setting on pump
  
  367   Tuesday, June 03, 2025, 11:39 Aaron TamStandard OperationOtherBL1A Holding TankBL1A Active Water Holding Tank June 3, 2025 - Albert Kong,
Aaron Tam 
RPG finished analysis of
 Sight_Glass_1.jpgSight_Glass_2.jpgTank_conditions_to_start.jpgTritium_Sample_and_Analysis_Form_-_T2_Cooling_Package_-_2025-01-10_-_Completed_2025-05-27.pdf 