Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall, Page 19 of 19  Not logged in ELOG logo
ID Date Author Category Typedown Specific Subject Text Attachments
  360   Thursday, January 23, 2025, 17:09 Albert KongMaintenanceOtherCoolingT1 T2 water solenoid valves rubber gasket and o-ring exchangeAll rubber components on the T1 T2 water
solenoid valves were exchanged on Jan 22,
2025.
 T1T2WaterSolenoidRubberComponentServicing.pdf 
  361   Monday, January 27, 2025, 12:53 Albert KongStandard OperationOtherTargetT1-MK1 Moved to Storage Pit #4, M9BB Servicing in Hot Cell, T2-MK1 Servicing in Hot Cell, T2-MK2 from Storage Pit #3 to StationDRAWINGS UPLOADED IN PDF, DOWNLOAD TO VIEW
ALL DRAWINGS, PREVI
---------------------------------------------
 13x 
  362   Monday, February 10, 2025, 16:46 Albert KongMaintenanceOtherOtherT1 T2 ASCO Air Solenoid Valve RebuildThe compressed air ASCO valves for the
M9BB, M20BB, T1 Profile Monitor (2x 8342C1
[rebuild kit 306-191] + 1x 8320G216 [rebuild
 Screenshot_2025-02-10_163346.png 
  1   Wednesday, June 29, 2011, 15:27 John Wong   testblah blah blah....   
ELOG V2.9.2-2455