ID Date Author Category Typedown Specific Subject Text Attachments
  333   Tuesday, October 17, 2023, 10:16 Eric LaheMaintenanceOtherActive SumpTesting the Remote Handling Lab Active Sump Level SensorThe level sensor for the active sump in
the RH lab was tested.
The level sensor is working properly
  
  334   Tuesday, October 17, 2023, 14:25 Albert KongMaintenanceOtherOtherT1/T2 Air Amplifier Spool O-Ring ServicingToday we re-lubricated the o-rings on the
top air amplifier for T1/T2, and replaced
the o-rings on the bottom air amplifier with
 IMG_2576.JPEGIMG_2575.JPEG 
  336   Wednesday, January 10, 2024, 12:25 Albert KongStandard OperationOtherCoolingT1/T2 cooling packages drainedJan 10, 2024:
The cooling packages for T1/T2 was
drained this morning. ~150 L from each of
 T1T2EPICSPages.PNGIMG_3943.JPEGIMG_4231.JPEG 
  338   Thursday, January 11, 2024, 15:10 Albert KongMaintenanceOtherCoolingT1/T2 Cooling Pkg. Proteus Paddle Wheel Maintenance, CUNO Filter Replacement, and Fitting Inspection The following tasks were performed:

    All electrical, water,
and pneumatic connections to the T1 target
  
  340   Monday, January 15, 2024, 16:47 Albert KongStandard OperationOtherCoolingT1/T2 Cooling Pkg. Prep for Refill + Leak Check At Pressure The following tasks were completed
in preparation of re-filling the T1 and T2
cooling packages:
 7x 
  341   Friday, January 19, 2024, 17:07 Albert KongStandard OperationOtherTargetT1/T2 Profile Monitor, TGT Ladder, CUNO filter leak, Motor Coupling Inspection, + M9/M20 Blocker Actuation The following tasks were completed:

    Yesterday (Jan 18), the
T1/T2 cooling packages were inspected for
 7x 
  343   Thursday, February 01, 2024, 11:16 Albert KongStandard OperationOtherCoolingSpent resin can rinse, purge, and drying The recently removed resin can from
the T2 target station was rinsed with city
water and flushed with compressed air for
  
  344   Thursday, February 15, 2024, 12:38 Riley SykesRepairOtherHot CellIndium Extruder Hand PumpFeb 1 2024
Hand Pump observed to be losing pressure
at full extension of cylinder, seals likely
  
  346   Wednesday, April 03, 2024, 10:48 Adam NewsomeOtherOtherBL1A Holding TankBL1A Holding Tank - water level checkAs of 2024-04-03, the BL1A Holding Tank
water level is approximately 580L. It is
recommended to drain the tank prior to the
  
  349   Friday, June 28, 2024, 15:44 Albert KongOtherOtherTransfer FlaskInspection of Primary Target Transfer Flask





Normal
0
 Flask_Inspection_Images_(26_June_2024).pdf 
  350   Wednesday, July 17, 2024, 15:05 Adam NewsomeStandard OperationOtherOtherSafety Walkaround Complete - Meson Hall HC/WC AreaA safety walkaround for July 2024 was completed
by A. Kong.
Results can be found in the master
  
  351   Tuesday, August 06, 2024, 11:35 Albert KongStandard OperationOtherBL1A Holding TankBL1A and RH Active Sump DrainingThe RH active sump was drained (over Jul
31-Aug 01), in total approximately 5500 L
of water was sent to city sewage.
 IMG_0173.JPEGIMG_0170.JPEGIMG_0185.JPEG 
  352   Thursday, August 22, 2024, 15:16 Adam NewsomeStandard OperationOtherActive SumpActive sump filled ~600L with grey water from RCR1 sump replacementDuring a replacement  of the RCR1 active
sump (mechanical services group), approximately
600L of non-active grey water was released
  
  354   Monday, September 09, 2024, 16:31 Albert KongStandard OperationOtherActive SumpActive Sump High Level Sensor TestingThe active sump high level sensor was tested
and correctly alarmed locally. However the
alarm in the MHESA RCR lab did not make any
  
  355   Thursday, October 10, 2024, 12:24 Adam NewsomeOtherOtherHot CellSafety Walkaround Complete - Meson Hall HC/WC AreaA safety walkaround was completed for the
Meson Hall Hot/Warm Cells. 
The resulting spreadsheet can be
  
  357   Friday, November 29, 2024, 11:57 Adam NewsomeMaintenanceOtherHot CellHot cell and warm cell maintenance tasksThe following maintenance tasks were completed
on 2024-11-29 by A. Newsome, A. Kong, A.
Tam, M. Dalla Valle:
 Operator_left_oil_level_before_refill.jpgOperator_Left_oil_level_after_refill.JPGOperator_right_oil_level.jpgRight_window_water_level_before_refill.jpgWarm_cell_water_window_after_refill.jpg 
  358   Friday, January 10, 2025, 18:36 Albert KongStandard OperationOtherCoolingT1/T2 cooling packages drainedThe T1 and T2 cooling packages were drained
starting at 14:36, by 14:48 both expansion
tanks had dried, meaning the draining rate
 CALCS_T1_T2_cooling_system_drain_speed.htmlTritium_Sample_and_Analysis_Form_-_T1_Cooling_Package_-_2025-01-10.pdfTritium_Sample_and_Analysis_Form_-_T2_Cooling_Package_-_2025-01-10.pdf 