ID |
Date |
Author |
Category |
Type |
Specific |
Subject |
Text |
|
100
|
Monday, January 20, 2014, 11:51 |
Isaac Earle | Repair | Target 2 | Water Leak | Water Leak from Meson Hall Mezzanine Near T2 | A water leak developed this morning
from a city water supply line at a hose connection
near the T2 expansion tank. Water was |
|
101
|
Wednesday, January 22, 2014, 15:41 |
Isaac Earle | Standard Operation | Target 2 | Water Leak | Water Drained From Suck Tube Released | After approval from RPG, the water
drained from the suck tube, which was stored
in a bucket in the RH lab active sink area, |
|
103
|
Thursday, February 13, 2014, 14:27 |
Isaac Earle | Standard Operation | Target 2 | Target | T2 Target Moves | The T2-MK1 target was moved from the beam
line to the target storage pit in position
4. The target was measured to be 30mSv/hr |
|
104
|
Monday, March 03, 2014, 11:55 |
Isaac Earle | Repair | Target 2 | Target | T2 Protect Monitor Moved to HC | The T2 Protect Monitor was transported
from the beam line to the hot cell this morning
using the transport flask. The move |
|
105
|
Tuesday, March 11, 2014, 13:50 |
Isaac Earle | Repair | Target 2 | Target | T2 Protect Monitor Returned to Beam Line | After the monitor assembly was moved to
the hot cell, electrical checks were performed
by Bill Rawnsley which showed the same results |
|
106
|
Monday, March 24, 2014, 18:14 |
Isaac Earle | Standard Operation | Target 2 | Cooling | T2 Cooling Package & Air Amplifier Started | Bill Rawnsley completed an electrical check
of the T2 profile monitor today from the
Meson Hall mezzanine - All OK. |
|
107
|
Tuesday, March 25, 2014, 18:24 |
Isaac Earle | Development | Target 2 | Water Leak | Water Detecting Sensor Install at T1 & T2 | Water detecting strips were installed around
the T1 and T2 areas today with Doug Preddy
and contractors from SMT Research. Four |
9x |
108
|
Friday, March 28, 2014, 13:59 |
Isaac Earle | Maintenance | Target 2 | Cooling | T2 P1 Transducer and T2 Q1 Flow Meter Replaced | The T2 P1 pressure transducer (Omega PX315-100GI)
and T2 Q1 Proteus flow meter (0150SSTF3)
have been replaced with new units to address |
|
109
|
Tuesday, April 01, 2014, 10:17 |
Isaac Earle | Repair | Target 2 | Target | T2 Profile Monitor Actuation - Fault Report | The T2 profile monitor cannot be actuated
from the control room. When the solenoid
valve that supplies air to the air cylinders |
|
110
|
Thursday, April 03, 2014, 10:19 |
Isaac Earle | Standard Operation | Target 2 | Cooling | T2 Cooling Package Resin Can Replaced | The resin can was removed from the T2 cooling
package and transported to the warm cell.
A replacement can with fresh resin |
|
111
|
Thursday, April 03, 2014, 13:43 |
Isaac Earle | Standard Operation | Target 2 | Target | T2 Profile Monitor OK | T2 Profile Monitor actuation was tested
today from the control room and all is working
properly. The position (IN / OUT) also |
|
113
|
Monday, April 14, 2014, 15:30 |
Isaac Earle | Standard Operation | Target 2 | Target | T2 Target Moved to Position 4 | The T2-MK2 target (currently installed
in the beamline) was moved from position
0 to position 4 (10cm Be) using the portable |
|
114
|
Friday, May 02, 2014, 15:49 |
Isaac Earle | Repair | Target 2 | Target | T2 Protect Monitor Elevation Correction | When beam was started in mid-April, it
was observed by Operations Group that with
the beam centered vertically within the protect |
|
115
|
Monday, May 05, 2014, 15:46 |
Isaac Earle | Repair | Target 2 | Target | T2 Protect Returned to B/L | The T2 protect monitor was returned to
the beam line using the shielded flask. The
alignment pin did not align with the hole |
|
116
|
Wednesday, May 14, 2014, 20:36 |
Grant Minor | Development | Target 2 | Target | Target exercised to position 0, then back to 2.0 mm above position 4 | The T2 target was exercised to position
0 around 6:15pm so that the T2 profile monitor
could be used by operations. The T2 |
|
117
|
Tuesday, June 03, 2014, 22:56 |
Isaac Earle | Standard Operation | Target 2 | Target | T2 Target Position Moves (Development Shift) | The T2 target was moved from Position 4
to Position 0 at 11:15am so the profile monitor
could be used during the development shift. |
|
119
|
Monday, August 11, 2014, 16:57 |
Isaac Earle | Repair | Target 2 | Other | Air Amplifier Increased Cycle Rate | On Friday August 8th Ron Kuramoto observed
that the Meson Hall air amplifier cycle speed
had increased. Cycle time measurements |
|
121
|
Thursday, September 11, 2014, 15:36 |
Ron Kuramoto | Repair | Target 2 | Water Leak | 1A Tunnel T2 Cu-ALCW water leak | On Sep. 3rd
during the 6 hr maintenance day, Doug Preddy |
|
122
|
Thursday, October 16, 2014, 17:44 |
Ron Kuramoto | Repair | Target 2 | Water Leak | 1A Tunnel T2 Cu-ALCW water leak repair |
|
6x |
123
|
Thursday, November 06, 2014, 17:18 |
Ron Kuramoto | Repair | Target 2 | Cooling | 1AT2 Collimator B, faulty Thermister water out temperature | On 14Oct2014, the 1AT2 Collimator B water
outlet temperature rose to 100o
C. |
|