|
ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
|
2685
|
Wednesday, September 18, 2024, 13:40 |
Aaron Tam | South Hot-Cell | Standard Operation | TM3 | TiC#8 | Target removal |
TiC#8 HP FEBIAD removed from TM3
Target sitting in SHC
1 Coil Conductor bolt fell under source tray
Photo Dump uploaded |
Attachment 1: Cover_Outside.jfif
|
Attachment 2: Cover_Inside.jfif
|
Attachment 3: Arc_Sign_(as_seen_before).jfif
|
Attachment 4: Arc_Sign_2_(as_seen_before).jfif
|
Attachment 5: View_High.jfif
|
Attachment 6: Bolts_Removed.jfif
|
Attachment 7: Source_Tray_no_target.jfif
|
Attachment 8: Taget_Bottom.jfif
|
Attachment 9: Target_Left.jfif
|
Attachment 10: Target_Top.jfif
|
Attachment 11: Target_right.jfif
|
Attachment 12: Camera_Angle_2.jfif
|
Attachment 13: Bolt_location_2.jfif
|
|
2686
|
Wednesday, September 18, 2024, 13:47 |
David Wang | South Hot-Cell | Standard Operation | TM3 | TiC#8 | Tm3 has been moved from silo to SHC. |
Tm3 has been moved from silo to SHC. The move is smooth. |
|
2687
|
Monday, September 23, 2024, 11:26 |
David Wang | South Hot-Cell | Standard Operation | TM3 | | TM3 window line has been leak checked. |
TM3 window line has been leak checked after containment box removal and installation for insulator installation on water cup C. No leak. |
|
2688
|
Monday, September 23, 2024, 11:31 |
David Wang | South Hot-Cell | Development | TM3 | | 10 pins lectrical check result after insulator is installed on water cap C. |
10 pins lectrical check result after insulator is installed on water cap C.
pin 14 to 60kv bias has 20 Kohm @250V Megga check. The rest check on ohmmeter and megga @250 are either OLor over 25Mohm which are good. |
|
2690
|
Monday, September 23, 2024, 16:06 |
Aaron Tam | South Hot-Cell | Repair | TM3 | | Insulator Addition to Water block |
September 23, 2024 - C. Fisher
- Containment box removed
- Insulator installed
- New window line VCR seals installed
- Dropped bolt from TiC#8 removed
- Containment box reinstalled
September 23, 2024 - A. Tam
- Containment box cover reinstalled
Photos attached |
Attachment 1: c02c089c-d2f0-4ddb-9f06-3dd8b8d05afa.jfif
|
Attachment 2: 0fd6eb03-7d82-48af-8ef7-99fd481bf1aa.jfif
|
Attachment 3: 14247104-53dc-4b00-852d-3a860c4baeb8.jfif
|
|
2693
|
Wednesday, September 25, 2024, 09:12 |
David Wang | South Hot-Cell | Maintenance | TM3 | | Tm3 has been moved from SHC to silo. |
Tm3 has been moved from SHC to silo. the move is smooth. |
|
2696
|
Tuesday, October 01, 2024, 10:55 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | TM2 has been moved from ITE to SHC. |
TM2 has been moved from ITE to SHC. Peter did the move with Travis on help. The move is smooth. |
|
2697
|
Tuesday, October 01, 2024, 12:40 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#67 | Target Ta#67 Removed from TM2 |
October 1, 2024 - Aaron Tam
Ta#67 LP-SIS removed from TM2
Ta#67 is sitting in SHC awaiting PIE
TM2 Containment Box Cover has not been reinstalled
Photos of target removal and module attached |
Attachment 1: Containment_Box.jfif
|
Attachment 2: Containment_Box_Cover_Internal.jfif
|
Attachment 3: Target_Fasteners_on.jfif
|
Attachment 4: Target_Fasteners_off.jfif
|
Attachment 5: Service_Tray_no_Target.jfif
|
Attachment 6: Ta#67_Left.jfif
|
Attachment 7: Ta#67_Right.jfif
|
Attachment 8: Ta#67_Top.jfif
|
Attachment 9: Ta#67_Bottom.jfif
|
|
2698
|
Tuesday, October 08, 2024, 11:20 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#68 | Ta#68 install onto TM2, w/ Troubleshooting |
October 7, 2024 - Aaron Tam
Ta#68 HP-SIS checks performed at B1 lab, moved to anteroom, and inserted into SHC via tool port w/ Aaron Schmidt.
Ta#68 fixed to source tray with 4 mounting bolts in order of: Right manip. holding, Top left, Right manip. removed, Bottom right, Top right, bottom left. w/ Aaron Schmidt and Brady Borrmann
- Motion was smooth, no resistance when positioning onto pins
VCR fittings done up with ample force, leak check passed
Conductor bolts installed in order of: 2 Target electrode conductors (Checked washers), 3 target Inner and outer conductors.
All bolts checked for full contact with mirror and binos.
Electrical check failed: Dead short (look for David's ELOG for more detail when available)
Troubleshooting while David is checking resistance: w/ Ferran
- Intermittent success with heavy manipulation of water lines
- Loosening off Waterline bracket-to-source-tray
- Loosening off Bracket to water line bolts 5/32 hex's
- Rotating bracket towards operator (effectively raising waterlines in the back upwards) seems to yield more intermittent success, but never passing megger @ 250V
- Tube was inadvertently dented when handling the tube in a wrenching motion with manip tong. counterclockwise
- Target removed while David is still on the multimeter (calling for any sign of success)
- Starting to remove Target in order of: Tightening back waterline-to-bracket 5/32 hex screws, loosening off waterline bracket, loosening off VCR nuts, 2 Target electrode conductor bolts, 3 Target inner and outer conductor bolts, Fixing bolts Top left (dropped below source tray), Bottom right...
- (At this time David called with some success with electrical check)
- Reversing course to verify fault has passed, target was reassembled, only finger loose on the VCR nuts.
- Faults no longer present
- Target removed
- As target was being pulled off source tray locating pins, a piece of ceramic fell onto the source tray just behind window waterlines.
Target taken out of Hotcell by Ferran. New VCR gaskets installed. Target reinserted
Target installed no issues. Used fixing bolt used to replace dropped one.
Leak check passed, Electrical check passed
- Notably don't have a photo of reinstalled target or source tray before 2nd install attempt.
Containment cover reinstalled
Ceramic piece moved into Pail #285 (suspect this is a very hot piece)
TM2 ready for move to ITE |
Attachment 1: 1st_Install_Leak_check_passed.jfif
|
Attachment 2: 1st_Install_Complete_waiting_for_electrical_check.jfif
|
Attachment 3: Troubleshooting_1st_install_(dent_in_tube_visible).jfif
|
Attachment 4: Water_Line_Dent_Face.jfif
|
Attachment 5: Water_Line_Dent_profile.jfif
|
Attachment 6: Waterline_alignment_after_removing_VCR_connection.jfif
|
Attachment 7: Ceramic_piece_fell_untouched_position.jfif
|
Attachment 8: Ceramic_Piece.jfif
|
Attachment 9: 285_Pail_location.jfif
|
Attachment 10: Closer_look_Below_Target_between_electrodes.jfif
|
Attachment 11: Closer_Look_Taget_Electrode_Conductor_LEFT_(2).jfif
|
Attachment 12: Closer_Look_Taget_Electrode_Conductor_LEFT.jfif
|
Attachment 13: Closer_Look_Taget_Electrode_Conductor_RIGHT_(2).jfif
|
Attachment 14: Closer_Look_Taget_Electrode_Conductor_RIGHT.jfif
|
Attachment 15: Closer_Look_Target_Inner_and_Outer_conductors.jfif
|
Attachment 16: Closer_Look_waterline_bracket_after_manipulation.jfif
|
Attachment 17: TM2_Cover_Closed_completed_ready_for_move.jfif
|
|
2699
|
Tuesday, October 08, 2024, 11:45 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | Tm2 electrical check with Ta#68 installed at SHC. |
ABCD was dead shorted to 60kv bias during the first time measurement after target installation. Target was removed and reinstalled again with new VCR seals by Ferran. during target removal process, short disappeared when Aaron remove bolts on CD tube heaters terminal. leak check and electrical check result are good after second time target installation. |
Attachment 1: TM2_Ta#68_electrical_check.pdf
|
|
|
2702
|
Thursday, October 10, 2024, 10:24 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#67 | Ta#67 PIE |
Post Irradiation Examination
October 9, 2024 - Aaron Tam w/ Chad Fisher, Aurelia Laxdal, and Lucas Backes
PIE conducted by Chad with direction from Aurelia. Aaron and Lucas observing/documenting
Goal: Thin foil target material is somewhat novel, and we should characterize the differences if there are any.
Photos of the pre-examined target can be seen on ELOG 2697 on Tuesday October 1, 2024, when the target was removed from TM2
Notes:
- Right most inner/outer target conductor bolts was sitting proud and had threads showing, photo attached
- Some Black deposit was found on the inside of the heatshield directly below the extraction tube, and loose in powder form inside the heatshield.
- Target tube seems to have more of a crystalline texture than previous examinations.
- When Target tube was being removed, one of the target electrode conductors broke off
- some dimple texture was found on the target tube windows and this was further explored by prying a channel through the length of one side of the tube to get a better look
Target pieces were placed loosely back within the heatshield, and the lid loosely placed back on.
Awaiting pail loading, and move to storage vault
|
Attachment 1: Black_deposit_loose_inside_heatshield_(2).jfif
|
Attachment 2: Black_deposit_loose_inside_heatshield.jfif
|
Attachment 3: Black_Deposit_on_heatshield_(2).jfif
|
Attachment 4: Black_Deposit_on_heatshield.jfif
|
Attachment 5: Closer_Look_at_Broken_off_Conductor_piece.jfif
|
Attachment 6: Closer_look_Dimple_texture_on_target_tube_window_ENTRANCE_(2).jfif
|
Attachment 7: Closer_look_Dimple_texture_on_target_tube_window_ENTRANCE_(4).jfif
|
Attachment 8: Closer_look_Dimple_texture_on_target_tube_window_ENTRANCE.jfif
|
Attachment 9: Closer_look_Dimple_texture_on_target_tube_window_EXIT_(2).jfif
|
Attachment 10: Closer_look_Dimple_texture_on_target_tube_window_EXIT.jfif
|
Attachment 11: Conductor_Screw_sitting_proud_(1).jfif
|
Attachment 12: Conductor_Screw_sitting_proud.jfif
|
Attachment 13: Copper_Colour_Pattern_(2).jfif
|
Attachment 14: Copper_Colour_pattern.jfif
|
Attachment 15: Crystalline_Texture_on_target_tube_(1).jfif
|
Attachment 16: Crystalline_Texture_on_target_tube.jfif
|
Attachment 17: Entrance_Window_inside_heatshield.jfif
|
Attachment 18: Entrance_Window_outside_Heatshield.jfif
|
Attachment 19: Exit_Window_inside_Heatshield.jfif
|
Attachment 20: Exit_window_outside_heatshield.jfif
|
Attachment 21: f8ccf123-0d03-47b8-86c9-27ae5b29c70d.jfif
|
Attachment 22: f5747a26-1431-4506-8127-e30b1e829339.jfif
|
Attachment 23: fbcb86a1-2d48-46a9-a64f-f5bcb01959fa.jfif
|
Attachment 24: Open_Target_tube_dimple_feature.jfif
|
Attachment 25: Operation_Target_Tube_removal_(2).jfif
|
Attachment 26: Operation_Target_Tube_removal.jfif
|
Attachment 27: Procedure_Ripping_into_target_tube_(2).jfif
|
Attachment 28: Procedure_Ripping_into_target_tube_(4).jfif
|
Attachment 29: Procedure_Ripping_into_target_tube_(5).jfif
|
Attachment 30: Procedure_Ripping_into_target_tube_(6).jfif
|
Attachment 31: Procedure_Ripping_into_target_tube.jfif
|
Attachment 32: Target_Electrode_Conductor_removed.jfif
|
Attachment 33: Target_Tube_Window_ENTRANCE.jfif
|
Attachment 34: Target_window_ENTRANCE.jfif
|
Attachment 35: Target_window_EXIT.jfif
|
|
2703
|
Thursday, October 10, 2024, 10:54 |
Aaron Tam | South Hot-Cell | Standard Operation | | TiC#9 | TiC#9 PIE |
Post Irradiation Examination
October 9, 2024 - Aaron Tam
Goal: Training (First PIE by Aaron), Characterize any anomalies
Notes:
- Overall the target looks exceedingly clean with only some discolouration on the copper behind the target tube, and multipin cable insulation.
Target loosely reassembled
Awaiting pail loading, and move to vault |
Attachment 1: c04ead1c-fd4e-4416-9999-f6af1950d50f.jfif
|
Attachment 2: ca843d0f-1927-4b57-852c-4937259d8a58.jfif
|
Attachment 3: a9c1b163-cea6-432f-bdbd-c7e5b92d60c0.jfif
|
Attachment 4: 4be2ae79-3fd9-4138-a1ca-624fbe071a78.jfif
|
Attachment 5: 01c73c16-2482-415a-8a12-a0752f844fd3.jfif
|
Attachment 6: f9611dd8-f8b0-410a-86fa-2d3ab4f50e41.jfif
|
Attachment 7: 4ebc456a-1839-4b92-b73b-7cc1fcb1cc71.jfif
|
Attachment 8: 14008918-9bf3-4626-8f77-c0107d01e168.jfif
|
Attachment 9: 79be1e68-ac54-4841-b0c2-eb917b18574b.jfif
|
Attachment 10: 1393f383-bdaf-4867-bf74-8ba88eb5dbc3.jfif
|
Attachment 11: 6128aba4-6c03-4806-8013-5ed1500f97f5.jfif
|
Attachment 12: 8c83a044-6369-4eea-bcb3-286320fb771b.jfif
|
Attachment 13: 04558649-7f45-49df-bbd1-a6655033d34f.jfif
|
Attachment 14: 99e656c9-c211-4a78-b3fd-7fb4775e90d7.jfif
|
Attachment 15: fd624472-762f-48e2-8951-dff22f4108c1.jfif
|
Attachment 16: d2115c29-874c-4dd7-a52e-85ff8423df42.jfif
|
Attachment 17: 9310b964-4db3-4f76-a651-38097c722875.jfif
|
Attachment 18: 2917fee7-b2db-4575-84b5-b227c895d0f1.jfif
|
Attachment 19: 55c34370-3ac2-4679-beff-21a36f2a378c.jfif
|
Attachment 20: 8591d4e7-269f-4641-af7e-afe07915cae6.jfif
|
Attachment 21: df475908-8b36-4a5d-916e-9ce608d34acc.jfif
|
Attachment 22: 95ce159e-480a-4231-83f6-1e8270c0cbdc.jfif
|
Attachment 23: 7e22b28a-30b4-42e2-8568-c80d5cfb209e.jfif
|
Attachment 24: d47b48ca-320e-43a5-a41c-20af82a38ebd.jfif
|
Attachment 25: c3eef85f-ee87-47a1-a230-609d5dd9764d.jfif
|
Attachment 26: d7769940-f939-4686-af3c-21fc49ced03f.jfif
|
Attachment 27: 2899fd3f-93f4-4a33-8d08-9b9bea6e2ca9.jfif
|
Attachment 28: 1abe798c-1058-4b80-b4b2-9dae1e94799e.jfif
|
Attachment 29: 1f780424-0776-400d-b11a-a0e1b3e4c862.jfif
|
Attachment 30: a983a1bb-5223-4757-88b2-9fb6ae46b5cc.jfif
|
Attachment 31: fdfa8fec-f1d8-4c29-8df5-03d9c2ac10f6.jfif
|
Attachment 32: 4cb53268-4ce1-48ab-ab71-7d9d4d908229.jfif
|
|
2711
|
Tuesday, November 05, 2024, 11:04 |
Frank Song | South Hot-Cell | Standard Operation | | TiC#9 | electrical check with the spent target |
David made electrical check right after TM4 is moved from ITW to SHC. see attachment pls. |
Attachment 1: Electric_Check_of_TM4_with_spent_TiC#9.pdf
|
|
|
2712
|
Wednesday, November 06, 2024, 08:29 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | TiC#9 | Target and Parasitic assemblies removal from TiC#9 |
November 5, 2024 - Aaron Tam
TiC#9 HP-SIS removed from TM4
- Top left fixing bolt shows signs of heating on it (Comparison photos attached Bolt_profile.jfif & Bolt_Tops.jfif)
- Location and orientation of darker bolt (Darker_bolt.jfif)
Parasitic Targets Removed
- Left target has residue left from ablation
See photos attached for detail |
Attachment 1: Target_first_look.jfif
|
Attachment 2: Target_first_look_ETTR.jfif
|
Attachment 3: Inside_Panel.jfif
|
Attachment 4: Darker_bolt.jfif
|
Attachment 5: VCR_and_conductor_bolts_removed.jfif
|
Attachment 6: Top.jfif
|
Attachment 7: target_left.jfif
|
Attachment 8: Right.jfif
|
Attachment 9: Bottom.jfif
|
Attachment 10: Parasitic_Target_right.jfif
|
Attachment 11: Parasitic_Target_right_(2).jfif
|
Attachment 12: Left_side_without_parasitic.jfif
|
Attachment 13: Back_of_target_left.jfif
|
Attachment 14: Back_of_target_right.jfif
|
Attachment 15: Extraction_electrode.jfif
|
Attachment 16: Bolt_profile.jfif
|
Attachment 17: Bolt_Tops.jfif
|
|
2713
|
Wednesday, November 06, 2024, 16:33 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCX46 | TM4 with UCx46 electrical and leak check at SHC |
TM4 with UCx46 electrical and leak check at SHC is done. Everything is good. |
Attachment 1: TM4_UCx46_electrical_check.pdf
|
|
|
2715
|
Friday, November 08, 2024, 10:44 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | UCx#46 | UCx#46 Install and Parasitic Target Status |
November 6, 2024 - Aaron Tam
UCx#46 Target handover from TPO
Target insertion: successful
Parasitic Install: All Parasitic targets left off target
- Left side In-beam array type parasitic install attempt #1
- Parasitic assembly is too thin/studs too tall for the socket nut to fasten onto target. Stud protrudes through the length of socket section, not allowing tool to insert
- previously a 3/4 spacer was used to give space for thermal couple to enter
- Install of 3/4 spacer was difficult because it does not hold its shape when handled (pivots around 1/2 ad 1/4 portions)
- With spacer installed, parasitic assembly is too thick for socket nuts to fasten onto studs.
- It may have been possible to back out studs to use, but left off in the interest of time UCx is exposed.
- Right side In-beam window type parasitic install
- Similarly to Left side, studs were too short for install, studs could be backed out, but was left off in the interest of time UCx exposed
- PEEK seal parasitic targets were left off as per schedule, and will be leak checked at another date (after tong cable has been repaired)
- Order of PEEK seal locations preserved and follows order as seen with target installed (Photo attached)
Target install: successful
Leak Check: Successful
Electrical Check: Successful
- Initially failed due to wiring diagram being different between production wiring diagram and electrical test sheet
Containment box panel closed
|
Attachment 1: Left_side_Array_Parasitic_with_floppy_spacer.jfif
|
Attachment 2: Right_side_Window_Parasitic.jfif
|
Attachment 3: Lid_Parasitics_order.jfif
|
|
2716
|
Friday, November 08, 2024, 10:54 |
Aaron Tam | South Hot-Cell | Standard Operation | | TiC#9 | TiC#9 Pail Loading into Pail#299 |
Nov. 8, 2024 - Aaron Tam
Tong cable snapped when attempting to remove multipin connector bracket
Assistance from Chad required for the rest of procedure
Tic#9 was loaded into Pail#299
- Along with fixing and conductor bolts (no other material was loaded)
|
|
2718
|
Monday, November 18, 2024, 12:18 |
Aaron Tam | South Hot-Cell | Repair | | | SHC West Manipulator Repair |
November 14, 2024 - Aaron Tam w/ Chad Fisher
Following ID: 2716
"Nov. 8, 2024 - Aaron Tam
Tong cable snapped when attempting to remove multipin connector bracket"
Repair went as follows:
- weighted clip attached to tong return side to tension/keep tapes on pulleys
- Manipulator was pinned from both sides (Pinning from master side first makes it easier to position slave side)
- clamps were used to suspend all tapes and cables near the relay bracket
- extension tube limit clamps were moved to the top to stop it from dropping when Z motion tapes disconnected
- Z motion tapes/tension adjusting screws taken off master carriage and suspended with equalizing weight ~10+ lbs)
- Extension tube limit clamps and extension tube lowered give space to expose multiplier later
- Wrist joint and handle removed as a unit
- extension tube to multiplier screws taken out
- Extension tube raised to expose multiplier - using extension tube to wrist joint positioning clamp to keep it in place
- Old cable removed
- new cable installed
installation in reverse with spare master handle
Notes:
Spare master wrist joint was missing gears that connect wrist drums
- this had to be disassembled and installed with gears from old wrist joint
Handle ratcheting pawl spring was not oriented properly, so this had to be disassembled and reinstalled properly (in the process one spring was lost Part#: A-5800)
|
|
2720
|
Monday, November 25, 2024, 09:56 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | TM3 move - silo to SHC |
TM3 was moved from silo to SHC with no target. Move successful. |
|
2721
|
Tuesday, November 26, 2024, 13:03 |
Frank Song | South Hot-Cell | Standard Operation | TM3 | UCx#47 | electrical check/leak check |
An electrical check and leak check had been done after new target UCx47 was installed on TM3 in SHC. see attachment pls. |
Attachment 1: TM3_with_new_target_UCx#47_electrical_check_on_SHC_2024-11-26.pdf
|
|