Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2675     Entry time: Friday, September 06, 2024, 14:28
Author: Aaron Tam 
Category: South Hot-Cell 
Type: Standard Operation 
Module:  
Target/Number: Ta#68(Spare) 
Subject: Ta#68(Spare) removed from TM4 and into Anteroom  

September 5, 2024 -AT

  • Plastic and clean target tray added to SHC 
  • TM4 moved to SHC 
  • TM4 containment box cover removed

September 6, 2024 - AT

  • Ta#68(Spare) removed from TM4 onto clean tray 
    • top left mounting bolt fell under source tray in containment box - unretrievable
  • Ta#68(Spare) moved out of SHC via toolport door 
    • SHC lift table was lower than tool port tunnel by 2". Target-on-Tray slipped back onto lift table when trying to drag it up to the tool port. Target bounced out of one locating pin, but stayed within boundaries of the tray 
    • Water also leaked out from the VCR fitting and on to the SHC lift table, and toolport. 
  • Target-on-tray slid into a clean plastic bag, and then into a plastic box. 

 September 9, 2024 - AT

  • Ta#68(Spare) taken out of plastic bag and water drained from waterlines
    • Target was rotated in every direction several times until no more water poured out from the VCR joints
  • Ta#68(Spare) put back in box without the bag (to promote evaporation) 

 

ELOG V2.9.2-2455