Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2693     Entry time: Wednesday, September 25, 2024, 09:12
Author: David Wang 
Category: South Hot-Cell 
Type: Maintenance 
Module: TM3 
Target/Number:  
Subject: Tm3 has been moved from SHC to silo. 

Tm3 has been moved  from SHC to silo. the move is smooth.

ELOG V2.9.2-2455