Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2685     Entry time: Wednesday, September 18, 2024, 13:40
Author: Aaron Tam 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM3 
Target/Number: TiC#8 
Subject: Target removal  

 TiC#8 HP FEBIAD removed from TM3

Target sitting in SHC

1 Coil Conductor bolt fell under source tray 

Photo Dump uploaded

Attachment 1: Cover_Outside.jfif  206 kB
Attachment 2: Cover_Inside.jfif  188 kB
Attachment 3: Arc_Sign_(as_seen_before).jfif  77 kB
Attachment 4: Arc_Sign_2_(as_seen_before).jfif  81 kB
Attachment 5: View_High.jfif  151 kB
Attachment 6: Bolts_Removed.jfif  194 kB
Attachment 7: Source_Tray_no_target.jfif  192 kB
Attachment 8: Taget_Bottom.jfif  157 kB
Attachment 9: Target_Left.jfif  157 kB
Attachment 10: Target_Top.jfif  161 kB
Attachment 11: Target_right.jfif  183 kB
Attachment 12: Camera_Angle_2.jfif  140 kB
Attachment 13: Bolt_location_2.jfif  119 kB
ELOG V2.9.2-2455