Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
|
RH-ISAC |
Not logged in |
|
|
Message ID: 2702
Entry time: Thursday, October 10, 2024, 10:24
|
Author: |
Aaron Tam |
Category: |
South Hot-Cell |
Type: |
Standard Operation |
Module: |
TM2 |
Target/Number: |
Ta#67 |
Subject: |
Ta#67 PIE |
|
|
Post Irradiation Examination
October 9, 2024 - Aaron Tam w/ Chad Fisher, Aurelia Laxdal, and Lucas Backes
PIE conducted by Chad with direction from Aurelia. Aaron and Lucas observing/documenting
Goal: Thin foil target material is somewhat novel, and we should characterize the differences if there are any.
Photos of the pre-examined target can be seen on ELOG 2697 on Tuesday October 1, 2024, when the target was removed from TM2
Notes:
- Right most inner/outer target conductor bolts was sitting proud and had threads showing, photo attached
- Some Black deposit was found on the inside of the heatshield directly below the extraction tube, and loose in powder form inside the heatshield.
- Target tube seems to have more of a crystalline texture than previous examinations.
- When Target tube was being removed, one of the target electrode conductors broke off
- some dimple texture was found on the target tube windows and this was further explored by prying a channel through the length of one side of the tube to get a better look
Target pieces were placed loosely back within the heatshield, and the lid loosely placed back on.
Awaiting pail loading, and move to storage vault
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|