Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2699     Entry time: Tuesday, October 08, 2024, 11:45
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number:  
Subject: Tm2 electrical check with Ta#68 installed at SHC.  

ABCD was dead shorted to 60kv bias during the first time measurement after target installation. Target was removed and reinstalled again with new VCR seals by Ferran.  during target removal process, short disappeared when Aaron remove bolts on CD tube heaters terminal.  leak check and electrical check result are good after second time target installation. 

Attachment 1: TM2_Ta#68_electrical_check.pdf  111 kB  | Show | Hide all
ELOG V2.9.2-2455