Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2690     Entry time: Monday, September 23, 2024, 16:06
Author: Aaron Tam 
Category: South Hot-Cell 
Type: Repair 
Module: TM3 
Target/Number:  
Subject: Insulator Addition to Water block 

 September 23, 2024 - C. Fisher 

  • Containment box removed
  • Insulator installed
  • New window line VCR seals installed
  • Dropped bolt from TiC#8 removed
  • Containment box reinstalled

September 23, 2024 - A. Tam

  • Containment box cover reinstalled 

Photos attached 

Attachment 1: c02c089c-d2f0-4ddb-9f06-3dd8b8d05afa.jfif  76 kB
Attachment 2: 0fd6eb03-7d82-48af-8ef7-99fd481bf1aa.jfif  154 kB
Attachment 3: 14247104-53dc-4b00-852d-3a860c4baeb8.jfif  219 kB
ELOG V2.9.2-2455