September 9, 2024 - Aaron Tam 

  • Water from waterline found puddled on source-tray and containment box. 
  • Water was wiped up as much as possible, but likely still in containment box 
  • leaving to dry overnight
  • Target inserted into Hotcell with nuts for the parasitic target. 4/4 socket nuts installed on upstream flange, and 3/4 installed on downstream flange

September 10, 2024 - Aaron Tam

  • TiC#9 HP-SIS installed onto TM4 
  • Leak check passed after retightening VCR joint
  • Target Electrode Conductor screws torqued to 130 inch-lbs 
  • Electrical test passed 
  • Containment box cover reinstalled

Photos attached

Attachment 1: 089c5872-091d-484b-9b9c-dda8444b217b.jfif  202 kB
Attachment 2: 566cae27-5562-4934-b23a-5c99af810900.jfif  213 kB
Attachment 3: cc853ae8-5896-46f3-9f21-f6ede8c82626.jfif  204 kB
Attachment 4: ffdf443c-2656-499a-9d0a-01ddef2f954a.jfif  200 kB
ELOG V2.9.2-2455