September 9, 2024 - Aaron Tam
- Water from waterline found puddled on source-tray and containment box.
- Water was wiped up as much as possible, but likely still in containment box
- leaving to dry overnight
- Target inserted into Hotcell with nuts for the parasitic target. 4/4 socket nuts installed on upstream flange, and 3/4 installed on downstream flange
September 10, 2024 - Aaron Tam
- TiC#9 HP-SIS installed onto TM4
- Leak check passed after retightening VCR joint
- Target Electrode Conductor screws torqued to 130 inch-lbs
- Electrical test passed
- Containment box cover reinstalled
Photos attached |