October 7, 2024 - Aaron Tam
Ta#68 HP-SIS checks performed at B1 lab, moved to anteroom, and inserted into SHC via tool port w/ Aaron Schmidt.
Ta#68 fixed to source tray with 4 mounting bolts in order of: Right manip. holding, Top left, Right manip. removed, Bottom right, Top right, bottom left. w/ Aaron Schmidt and Brady Borrmann
- Motion was smooth, no resistance when positioning onto pins
VCR fittings done up with ample force, leak check passed
Conductor bolts installed in order of: 2 Target electrode conductors (Checked washers), 3 target Inner and outer conductors.
All bolts checked for full contact with mirror and binos.
Electrical check failed: Dead short (look for David's ELOG for more detail when available)
Troubleshooting while David is checking resistance: w/ Ferran
- Intermittent success with heavy manipulation of water lines
- Loosening off Waterline bracket-to-source-tray
- Loosening off Bracket to water line bolts 5/32 hex's
- Rotating bracket towards operator (effectively raising waterlines in the back upwards) seems to yield more intermittent success, but never passing megger @ 250V
- Tube was inadvertently dented when handling the tube in a wrenching motion with manip tong. counterclockwise
- Target removed while David is still on the multimeter (calling for any sign of success)
- Starting to remove Target in order of: Tightening back waterline-to-bracket 5/32 hex screws, loosening off waterline bracket, loosening off VCR nuts, 2 Target electrode conductor bolts, 3 Target inner and outer conductor bolts, Fixing bolts Top left (dropped below source tray), Bottom right...
- (At this time David called with some success with electrical check)
- Reversing course to verify fault has passed, target was reassembled, only finger loose on the VCR nuts.
- Faults no longer present
- Target removed
- As target was being pulled off source tray locating pins, a piece of ceramic fell onto the source tray just behind window waterlines.
Target taken out of Hotcell by Ferran. New VCR gaskets installed. Target reinserted
Target installed no issues. Used fixing bolt used to replace dropped one.
Leak check passed, Electrical check passed
- Notably don't have a photo of reinstalled target or source tray before 2nd install attempt.
Containment cover reinstalled
Ceramic piece moved into Pail #285 (suspect this is a very hot piece)
TM2 ready for move to ITE |