Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2697     Entry time: Tuesday, October 01, 2024, 12:40
Author: Aaron Tam 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: Ta#67 
Subject: Target Ta#67 Removed from TM2  

 October 1, 2024 - Aaron Tam 

Ta#67 LP-SIS removed from TM2

Ta#67 is sitting in SHC awaiting PIE 

TM2 Containment Box Cover has not been reinstalled 

Photos of target removal and module attached 

Attachment 1: Containment_Box.jfif  206 kB
Attachment 2: Containment_Box_Cover_Internal.jfif  187 kB
Attachment 3: Target_Fasteners_on.jfif  241 kB
Attachment 4: Target_Fasteners_off.jfif  235 kB
Attachment 5: Service_Tray_no_Target.jfif  234 kB
Attachment 6: Ta#67_Left.jfif  203 kB
Attachment 7: Ta#67_Right.jfif  194 kB
Attachment 8: Ta#67_Top.jfif  196 kB
Attachment 9: Ta#67_Bottom.jfif  191 kB
ELOG V2.9.2-2455