Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2711     Entry time: Tuesday, November 05, 2024, 11:04
Author: Frank Song 
Category: South Hot-Cell 
Type: Standard Operation 
Module:  
Target/Number: TiC#9  
Subject: electrical check with the spent target 

 David made electrical check right after TM4 is moved from ITW to SHC. see attachment pls.

Attachment 1: Electric_Check_of_TM4_with_spent_TiC#9.pdf  44 kB  | Show | Hide all
ELOG V2.9.2-2455