Entry  Wednesday, September 18, 2024, 13:40, Aaron Tam, South Hot-Cell, Standard Operation, TM3, TiC#8, Target removal  13x
 TiC#8 HP FEBIAD removed from TM3
Target sitting in SHC
1 Coil Conductor bolt fell under source tray 
Entry  Wednesday, September 18, 2024, 13:47, David Wang, South Hot-Cell, Standard Operation, TM3, TiC#8, Tm3 has been moved from silo to SHC. 
Tm3 has been moved  from silo to SHC. The move is smooth. 
Entry  Monday, September 23, 2024, 11:26, David Wang, South Hot-Cell, Standard Operation, TM3, , TM3 window line has been leak checked.  
TM3 window line has been leak checked after containment box removal and installation for insulator installation on water cup C.   No leak.
Entry  Monday, September 23, 2024, 11:31, David Wang, South Hot-Cell, Development, TM3, , 10 pins lectrical check result after insulator is installed on water cap C.  
10 pins lectrical check result after insulator is installed on water cap C. 
pin 14 to 60kv bias has 20 Kohm @250V Megga check. The rest check on ohmmeter and megga @250 are either OLor over 25Mohm which are good. 
Entry  Monday, September 23, 2024, 16:06, Aaron Tam, South Hot-Cell, Repair, TM3, , Insulator Addition to Water block c02c089c-d2f0-4ddb-9f06-3dd8b8d05afa.jfif0fd6eb03-7d82-48af-8ef7-99fd481bf1aa.jfif14247104-53dc-4b00-852d-3a860c4baeb8.jfif
 September 23, 2024 - C. Fisher 

    Containment box removed
    Insulator installed
    New window line VCR seals installed
    Dropped bolt
from TiC#8 removed
    Containment box reinstalled

September 23, 2024 - A. Tam
Entry  Wednesday, September 25, 2024, 09:12, David Wang, South Hot-Cell, Maintenance, TM3, , Tm3 has been moved from SHC to silo. 
Tm3 has been moved  from SHC to silo. the move is smooth.
Entry  Tuesday, October 01, 2024, 10:55, David Wang, South Hot-Cell, Standard Operation, TM2, , TM2 has been moved from ITE to SHC. 
TM2 has been moved from ITE to SHC. Peter did the move with Travis on help.  The move is smooth. 
Entry  Tuesday, October 01, 2024, 12:40, Aaron Tam, South Hot-Cell, Standard Operation, TM2, Ta#67, Target Ta#67 Removed from TM2  9x
 October 1, 2024 - Aaron Tam 
Ta#67 LP-SIS removed from TM2
Ta#67 is sitting in SHC awaiting PIE 
Entry  Tuesday, October 08, 2024, 11:20, Aaron Tam, South Hot-Cell, Standard Operation, TM2, Ta#68, Ta#68 install onto TM2, w/ Troubleshooting  17x
October 7, 2024 - Aaron Tam 
Ta#68 HP-SIS checks performed at B1 lab, moved to anteroom, and inserted into SHC via tool port w/ Aaron Schmidt. 
Ta#68 fixed to source tray with 4 mounting bolts in order of: Right manip. holding, Top left, Right manip. removed, Bottom right, Top right, bottom
Entry  Tuesday, October 08, 2024, 11:45, David Wang, South Hot-Cell, Standard Operation, TM2, , Tm2 electrical check with Ta#68 installed at SHC.  TM2_Ta#68_electrical_check.pdf
ABCD was dead shorted to 60kv bias during the first time measurement after target installation. Target was removed and reinstalled again with new VCR
seals by Ferran.  during target removal process, short disappeared when Aaron remove bolts on CD tube heaters terminal.  leak check and electrical
check result are good after second time target installation. 
Entry  Thursday, October 10, 2024, 10:24, Aaron Tam, South Hot-Cell, Standard Operation, TM2, Ta#67, Ta#67 PIE  35x
 Post Irradiation Examination
October 9, 2024 - Aaron Tam w/ Chad Fisher, Aurelia Laxdal, and Lucas Backes 
PIE conducted by Chad with direction from Aurelia. Aaron and Lucas observing/documenting 
Entry  Thursday, October 10, 2024, 10:54, Aaron Tam, South Hot-Cell, Standard Operation, , TiC#9, TiC#9 PIE  32x
 Post Irradiation Examination
October 9, 2024 - Aaron Tam 
Goal: Training (First PIE by Aaron), Characterize any anomalies 
Entry  Tuesday, November 05, 2024, 11:04, Frank Song, South Hot-Cell, Standard Operation, , TiC#9 , electrical check with the spent target Electric_Check_of_TM4_with_spent_TiC#9.pdf
 David made electrical check right after TM4 is moved from ITW to SHC. see attachment pls.
Entry  Wednesday, November 06, 2024, 08:29, Aaron Tam, South Hot-Cell, Standard Operation, TM4, TiC#9, Target and Parasitic assemblies removal from TiC#9 17x
November 5, 2024 - Aaron Tam
TiC#9 HP-SIS removed from TM4

    Top left fixing bolt shows signs of heating on it (Comparison photos attached Bolt_profile.jfif  & Bolt_Tops.jfif)
Entry  Wednesday, November 06, 2024, 16:33, David Wang, South Hot-Cell, Standard Operation, TM4, UCX46, TM4 with UCx46 electrical and leak check at SHC TM4_UCx46_electrical_check.pdf
TM4 with UCx46 electrical and leak check at SHC is done. Everything is good.
Entry  Friday, November 08, 2024, 10:44, Aaron Tam, South Hot-Cell, Standard Operation, TM4, UCx#46, UCx#46 Install and Parasitic Target Status  Left_side_Array_Parasitic_with_floppy_spacer.jfifRight_side_Window_Parasitic.jfifLid_Parasitics_order.jfif
November 6, 2024 - Aaron Tam 
UCx#46 Target handover from TPO 
Target insertion: successful 
Entry  Friday, November 08, 2024, 10:54, Aaron Tam, South Hot-Cell, Standard Operation, , TiC#9, TiC#9 Pail Loading into Pail#299 
 Nov. 8, 2024 - Aaron Tam 
Tong cable snapped when attempting to remove multipin connector bracket 
Assistance from Chad required for the rest of procedure 
Entry  Monday, November 18, 2024, 12:18, Aaron Tam, South Hot-Cell, Repair, , , SHC West Manipulator Repair  
 November 14, 2024 - Aaron Tam w/ Chad Fisher 
Following ID: 2716   
"Nov. 8, 2024 - Aaron Tam 
Entry  Monday, November 25, 2024, 09:56, Adam Newsome, South Hot-Cell, Standard Operation, TM3, , TM3 move - silo to SHC 
TM3 was moved from silo to SHC with no target. Move successful. 
Entry  Tuesday, November 26, 2024, 13:03, Frank Song, South Hot-Cell, Standard Operation, TM3, UCx#47, electrical check/leak check TM3_with_new_target_UCx#47_electrical_check_on_SHC_2024-11-26.pdf
An electrical check and leak check had been done after new target UCx47 was installed on TM3 in SHC. see attachment pls.