Entry  Wednesday, September 18, 2024, 13:40, Aaron Tam, South Hot-Cell, Standard Operation, TM3, TiC#8, Target removal  13x

 TiC#8 HP FEBIAD removed from TM3

Target sitting in SHC

1 Coil Conductor bolt fell under source tray 

Photo Dump uploaded

Entry  Wednesday, September 18, 2024, 13:47, David Wang, South Hot-Cell, Standard Operation, TM3, TiC#8, Tm3 has been moved from silo to SHC. 

Tm3 has been moved  from silo to SHC. The move is smooth.

Entry  Monday, September 23, 2024, 11:26, David Wang, South Hot-Cell, Standard Operation, TM3, , TM3 window line has been leak checked.  

TM3 window line has been leak checked after containment box removal and installation for insulator installation on water cup C.   No leak.

Entry  Monday, September 23, 2024, 11:31, David Wang, South Hot-Cell, Development, TM3, , 10 pins lectrical check result after insulator is installed on water cap C.  

10 pins lectrical check result after insulator is installed on water cap C.

pin 14 to 60kv bias has 20 Kohm @250V Megga check. The rest check on ohmmeter and megga @250 are either OLor over 25Mohm which are good.

Entry  Monday, September 23, 2024, 16:06, Aaron Tam, South Hot-Cell, Repair, TM3, , Insulator Addition to Water block c02c089c-d2f0-4ddb-9f06-3dd8b8d05afa.jfif0fd6eb03-7d82-48af-8ef7-99fd481bf1aa.jfif14247104-53dc-4b00-852d-3a860c4baeb8.jfif

 September 23, 2024 - C. Fisher 

  • Containment box removed
  • Insulator installed
  • New window line VCR seals installed
  • Dropped bolt from TiC#8 removed
  • Containment box reinstalled

September 23, 2024 - A. Tam

  • Containment box cover reinstalled 

Photos attached 

Entry  Wednesday, September 25, 2024, 09:12, David Wang, South Hot-Cell, Maintenance, TM3, , Tm3 has been moved from SHC to silo. 

Tm3 has been moved  from SHC to silo. the move is smooth.

Entry  Tuesday, October 01, 2024, 10:55, David Wang, South Hot-Cell, Standard Operation, TM2, , TM2 has been moved from ITE to SHC. 

TM2 has been moved from ITE to SHC. Peter did the move with Travis on help.  The move is smooth.

Entry  Tuesday, October 01, 2024, 12:40, Aaron Tam, South Hot-Cell, Standard Operation, TM2, Ta#67, Target Ta#67 Removed from TM2  9x

 October 1, 2024 - Aaron Tam 

Ta#67 LP-SIS removed from TM2

Ta#67 is sitting in SHC awaiting PIE 

TM2 Containment Box Cover has not been reinstalled 

Photos of target removal and module attached 

Entry  Tuesday, October 08, 2024, 11:20, Aaron Tam, South Hot-Cell, Standard Operation, TM2, Ta#68, Ta#68 install onto TM2, w/ Troubleshooting  17x

October 7, 2024 - Aaron Tam 

Ta#68 HP-SIS checks performed at B1 lab, moved to anteroom, and inserted into SHC via tool port w/ Aaron Schmidt. 

Ta#68 fixed to source tray with 4 mounting bolts in order of: Right manip. holding, Top left, Right manip. removed, Bottom right, Top right, bottom left. w/ Aaron Schmidt and Brady Borrmann

  • Motion was smooth, no resistance when positioning onto pins

VCR fittings done up with ample force, leak check passed

Conductor bolts installed in order of: 2 Target electrode conductors (Checked washers), 3 target Inner and outer conductors.

All bolts checked for full contact with mirror and binos. 

Electrical check failed: Dead short (look for David's ELOG for more detail when available) 

Troubleshooting while David is checking resistance: w/ Ferran

  • Intermittent success with heavy manipulation of water lines
    • Loosening off Waterline bracket-to-source-tray 
    • Loosening off Bracket to water line bolts 5/32 hex's 
    • Rotating bracket towards operator (effectively raising waterlines in the back upwards) seems to yield more intermittent success, but never passing megger @ 250V 
    • Tube was inadvertently dented when handling the tube in a wrenching motion with manip tong. counterclockwise
  • Target removed while David is still on the multimeter (calling for any sign of success)
    • Starting to remove Target in order of: Tightening back waterline-to-bracket 5/32 hex screws, loosening off waterline bracket, loosening off VCR nuts, 2 Target electrode conductor bolts, 3 Target inner and outer conductor bolts, Fixing bolts Top left (dropped below source tray), Bottom right...
      • (At this time David called with some success with electrical check)
    • Reversing course to verify fault has passed, target was reassembled, only finger loose on the VCR nuts.
    • Faults no longer present
    • Target removed
      •  As target was being pulled off source tray locating pins, a piece of ceramic fell onto the source tray just behind window waterlines.

Target taken out of Hotcell by Ferran. New VCR gaskets installed. Target reinserted 

Target installed no issues. Used fixing bolt used to replace dropped one. 

Leak check passed, Electrical check passed

  • Notably don't have a photo of reinstalled target or source tray before 2nd install attempt. 

Containment cover reinstalled 

Ceramic piece moved into Pail #285 (suspect this is a very hot piece)

TM2 ready for move to ITE

Entry  Tuesday, October 08, 2024, 11:45, David Wang, South Hot-Cell, Standard Operation, TM2, , Tm2 electrical check with Ta#68 installed at SHC.  TM2_Ta#68_electrical_check.pdf

ABCD was dead shorted to 60kv bias during the first time measurement after target installation. Target was removed and reinstalled again with new VCR seals by Ferran.  during target removal process, short disappeared when Aaron remove bolts on CD tube heaters terminal.  leak check and electrical check result are good after second time target installation. 

Entry  Thursday, October 10, 2024, 10:24, Aaron Tam, South Hot-Cell, Standard Operation, TM2, Ta#67, Ta#67 PIE  35x

 Post Irradiation Examination

October 9, 2024 - Aaron Tam w/ Chad Fisher, Aurelia Laxdal, and Lucas Backes 

PIE conducted by Chad with direction from Aurelia. Aaron and Lucas observing/documenting 

Goal: Thin foil target material is somewhat novel, and we should characterize the differences if there are any. 

Photos of the pre-examined target can be seen on ELOG 2697  on Tuesday October 1, 2024, when the target was removed from TM2

Notes:

  • Right most inner/outer target conductor bolts was sitting proud and had threads showing, photo attached
  • Some Black deposit was found on the inside of the heatshield directly below the extraction tube, and loose in powder form inside the heatshield. 
  • Target tube seems to have more of a crystalline texture than previous examinations.
  • When Target tube was being removed, one of the target electrode conductors broke off
  • some dimple texture was found on the target tube windows and this was further explored by prying a channel through the length of one side of the tube to get a better look

Target pieces were placed loosely back within the heatshield, and the lid loosely placed back on.

Awaiting pail loading, and move to storage vault

 

Entry  Thursday, October 10, 2024, 10:54, Aaron Tam, South Hot-Cell, Standard Operation, , TiC#9, TiC#9 PIE  32x

 Post Irradiation Examination

October 9, 2024 - Aaron Tam 

Goal: Training (First PIE by Aaron), Characterize any anomalies 

Notes:

  • Overall the target looks exceedingly clean with only some discolouration on the copper behind the target tube, and multipin cable insulation. 
Target loosely reassembled
Awaiting pail loading, and move to vault 
Entry  Tuesday, November 05, 2024, 11:04, Frank Song, South Hot-Cell, Standard Operation, , TiC#9 , electrical check with the spent target Electric_Check_of_TM4_with_spent_TiC#9.pdf

 David made electrical check right after TM4 is moved from ITW to SHC. see attachment pls.

Entry  Wednesday, November 06, 2024, 08:29, Aaron Tam, South Hot-Cell, Standard Operation, TM4, TiC#9, Target and Parasitic assemblies removal from TiC#9 17x

November 5, 2024 - Aaron Tam

TiC#9 HP-SIS removed from TM4

  • Top left fixing bolt shows signs of heating on it (Comparison photos attached Bolt_profile.jfif  & Bolt_Tops.jfif)
  • Location and orientation of darker bolt (Darker_bolt.jfif)

Parasitic Targets Removed

  • Left target has residue left from ablation 

See photos attached for detail 

Entry  Wednesday, November 06, 2024, 16:33, David Wang, South Hot-Cell, Standard Operation, TM4, UCX46, TM4 with UCx46 electrical and leak check at SHC TM4_UCx46_electrical_check.pdf

TM4 with UCx46 electrical and leak check at SHC is done. Everything is good.

Entry  Friday, November 08, 2024, 10:44, Aaron Tam, South Hot-Cell, Standard Operation, TM4, UCx#46, UCx#46 Install and Parasitic Target Status  Left_side_Array_Parasitic_with_floppy_spacer.jfifRight_side_Window_Parasitic.jfifLid_Parasitics_order.jfif

November 6, 2024 - Aaron Tam 

UCx#46 Target handover from TPO 

Target insertion: successful 

Parasitic Install: All Parasitic targets left off target

  • Left side In-beam array type parasitic install attempt #1 
    • Parasitic assembly is too thin/studs too tall for the socket nut to fasten onto target. Stud protrudes through the length of socket section, not allowing tool to insert 
    • previously a 3/4 spacer was used to give space for thermal couple to enter 
    • Install of 3/4 spacer was difficult because it does not hold its shape when handled (pivots around 1/2 ad 1/4 portions) 
    • With spacer installed, parasitic assembly is too thick for socket nuts to fasten onto studs. 
      • It may have been possible to back out studs to use, but left off in the interest of time UCx is exposed. 
  • Right side In-beam window type parasitic install
    • Similarly to Left side, studs were too short for install, studs could be backed out, but was left off in the interest of time UCx exposed
  • PEEK seal parasitic targets were left off as per schedule, and will be leak checked at another date (after tong cable has been repaired) 
    • Order of PEEK seal locations preserved and follows order as seen with target installed (Photo attached)

Target install: successful 

Leak Check: Successful 

Electrical Check: Successful 

  • Initially failed due to wiring diagram being different between production wiring diagram and electrical test sheet

Containment box panel closed 

 

 

Entry  Friday, November 08, 2024, 10:54, Aaron Tam, South Hot-Cell, Standard Operation, , TiC#9, TiC#9 Pail Loading into Pail#299 

 Nov. 8, 2024 - Aaron Tam 

Tong cable snapped when attempting to remove multipin connector bracket 

Assistance from Chad required for the rest of procedure 

Tic#9 was loaded into Pail#299 

  • Along with fixing and conductor bolts (no other material was loaded)

 

Entry  Monday, November 18, 2024, 12:18, Aaron Tam, South Hot-Cell, Repair, , , SHC West Manipulator Repair  

 November 14, 2024 - Aaron Tam w/ Chad Fisher 

Following ID: 2716   
"Nov. 8, 2024 - Aaron Tam 
Tong cable snapped when attempting to remove multipin connector bracket"

Repair went as follows:

  • weighted clip attached to tong return side to tension/keep tapes on pulleys
  • Manipulator was pinned from both sides (Pinning from master side first makes it easier to position slave side)
  • clamps were used to suspend all tapes and cables near the relay bracket 
  • extension tube limit clamps were moved to the top to stop it from dropping when Z motion tapes disconnected
  • Z motion tapes/tension adjusting screws taken off master carriage and suspended with equalizing weight ~10+ lbs)
  • Extension tube limit clamps and extension tube lowered give space to expose multiplier later 
  • Wrist joint and handle removed as a unit 
  • extension tube to multiplier screws taken out
  • Extension tube raised to expose multiplier - using extension tube to wrist joint positioning clamp to keep it in place 
  • Old cable removed
  • new cable installed

installation in reverse with spare master handle 

Notes:

Spare master wrist joint was missing gears that connect wrist drums 

  • this had to be disassembled and installed with gears from old wrist joint

Handle ratcheting pawl spring was not oriented properly, so this had to be disassembled and reinstalled properly (in the process one spring was lost Part#: A-5800)
 

 

 

 

Entry  Monday, November 25, 2024, 09:56, Adam Newsome, South Hot-Cell, Standard Operation, TM3, , TM3 move - silo to SHC 

TM3 was moved from silo to SHC with no target. Move successful.

Entry  Tuesday, November 26, 2024, 13:03, Frank Song, South Hot-Cell, Standard Operation, TM3, UCx#47, electrical check/leak check TM3_with_new_target_UCx#47_electrical_check_on_SHC_2024-11-26.pdf

An electrical check and leak check had been done after new target UCx47 was installed on TM3 in SHC. see attachment pls.