  284   Wednesday, April 03, 2013, 12:26 David WangITEMaintenanceTM4Sic LIS/RFQLeak check on ITE TM4.TM 4 had been leak check in ITE due to
  relatively high PNG1 and IG1 readings.All
TM4 primary and secondary  vessel air
  
  283   Wednesday, April 03, 2013, 10:59 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule moveTM#1 has been moved from the south west
silo to the south hot cell, move went well.
  
  282   Tuesday, April 02, 2013, 10:07 chad fisherSouth Hot-CellStandard OperationTM1Ta#39Ta#39 inserted into hot cellTa#39 has been inserted into the hot cell
in preparation for TM1 target change.
  
  281   Wednesday, March 27, 2013, 12:08 David WangSouth Hot-CellStandard OperationTM4Sic LIS-RFQTM4 heat shield circuit leak check with SiC LIS-RFQ targetChad and I did the TM4 heat shield leak
check yesterday at SHC. The leak detector
was pumped to 4.6 xE-9atm.cc/sec, and 0.0xE-4
  
  280   Wednesday, March 27, 2013, 11:49 David WangITEStandard OperationTM4Sic LIS-RFQ Connected TM4 in ITETM4 has been reconnected to ITE after the
module moving. The roughing is started .
The water will be supplied to ITE after 
  
  279   Wednesday, March 27, 2013, 10:44 Travis CaveITEStandard OperationTM4SiC#28 (RFQ Target)module moveTM#4 with SiC#28 has been moved from the
south hot cell to the east target station
move went well.
  
  278   Tuesday, March 26, 2013, 14:17 Travis CaveSouth Hot-CellStandard OperationTM4SiC#28 (RFQ Target)Electrical checkElectrical check of TM#4 SiC#28 (RFQ Target)
has been completed. It passed the standard
electrical checks for the target part, but
 TM4_SiC28_RFQ_SHC_ELEC_CHK.PDF 
  277   Monday, March 25, 2013, 14:19 Travis CaveConditioning StationStandard OperationTM4CS Test Target #1module moveTM#4 with the CS Test target has been moved
from the conditioning station to the south
hot cell. Move went well.
  
  276   Monday, March 25, 2013, 10:59 Bevan MossConditioning StationDevelopmentTM4FEBIAD HP with Dummy TargetCommissioning TCS - Part 2 Completed

    

       
            
 IRH1511.pdfISK4574D-rev7.pdf 
  275   Monday, March 25, 2013, 09:35 Bevan MossConditioning StationStandard OperationTM4CS Test Target #1Cooling Package and Vacuum Stopped The cooling package and vacuum was
stopped today at 9:26 so the module can be
move.
  
  274   Saturday, March 23, 2013, 18:14 Aurelia LaxdalConditioning StationDevelopmentTM4FEBIAD HP with Dummy TargetCommissioning TCS - Part 2 CompletedAfter few hickups the TCS was successfuly
commissioned.
In the morning, in the middle of
  
  273   Friday, March 22, 2013, 18:49 Aurelia LaxdalConditioning StationDevelopmentTM4FEBIAD HP with Dummy TargetCommissioning TCS - Part 1Today, the commissioning of the TCS went
well. The water/vacuum interlocks were checked
OK. Then, the TCS was HV conditioned up to
  
  272   Wednesday, March 20, 2013, 08:19 David WangConditioning StationRepairTM4 Leak check new installed TM4 TP1 at conditioning station.I leak checked new installed TM4 TP1 at
conditioning station. The CS vacuum gauges
reading were at 1.0-1.5xE-6 torr . Leak detector
  
  271   Tuesday, March 19, 2013, 13:49 Bevan MossConditioning StationStandard OperationTM4CS Test Target #1Tubros Started Turbo Pumps have been started and
are in normal operation. TP1 which has recently
been replaced was started in soft start and
  
  270   Tuesday, March 19, 2013, 09:55 Bevan MossConditioning StationStandard OperationTM4CS Test Target #1Turbo pump 1 replaced roughing started David replaced the broken turbo pump
this morning and I have started roughing
at 9:54.
  
  269   Monday, March 18, 2013, 15:28 Bevan MossConditioning StationStandard OperationTM4CS Test Target #1Vented With Argon The conditioning station has been
vented with argon. Time taken is not known
but it is less than 3 hours. See attached
 Vented_with_Argon.JPG 
  268   Monday, March 18, 2013, 12:39 Bevan MossConditioning StationRepairTM4CS Test Target #1TGHT PS FailureThe Model of the Power
Supply (PS) is TSQLG 480-20/1500 and serial
number is 2755.02.01.01.09. 
 IMG_0529.JPG 
  267   Monday, March 18, 2013, 12:03 Bevan MossConditioning StationRepairTM4CS Test Target #1Turbo Pump 1 Failure and Venting Over the weekend Turbo pump one failed.
It was attempted to restart the turbo in
soft start but that also failed. Although
  
  266   Thursday, March 14, 2013, 11:56 Bevan MossConditioning StationStandard OperationTM4CS Test Target 1Cooling Package Started

    

       
            
 Cooling_package_1155.JPG 
  265   Thursday, March 14, 2013, 11:25 Bevan MossConditioning StationStandard OperationTM4CS Test Target #1Turbos Started Turbos started at 11:14. TP1S achieved
full speed in less than 2 minutes. TP1 and
2 tripped at 9 minutes. Restarted and reached
 turbo_started_1115.JPGvacuum_running_1124.JPG 