  49   Thursday, March 07, 2013, 08:35 Keith C NgM9RepairM9 T2 flange blank offWork on blank off of M9 T2 started: Cleared
away blocks making up bagging bunker. R.
Kuramoto took some initial photos of the
  
  48   Tuesday, March 05, 2013, 14:15 Keith C NgM9MaintenanceM9 Q1, 2 removalRemoved M9 Q1 Q2 from beam line 1A via
crane and transferred from beam line to radiation
waste storage.
 7x 
  47   Monday, March 04, 2013, 16:48 Keith C NgM9MaintenanceM9 Q1 Q2 removal, preparationPreparing for M9 Q1,2 move:
1. Re-arranged/organized cables on
top of magnet.
 6x 
  46   Friday, March 01, 2013, 15:28 Keith C NgM9MaintenanceRadadioactive Waste Pit OrganizingSuccessfully stacked old m20 q2 q2 magnet
assembly on top of old M9 Q1 Q2 magnet and
M11 septum magnet. See photos.
 20130301_radwastepit_P1020865.JPG20130301_radwastepit_P1020869.JPG20130301_radwastepit_P1020873.JPG 
  45   Wednesday, February 27, 2013, 16:15 Keith C NgM9MaintenanceM9 Q1 Q2 removal, rad waste pit prepRadioactive waste pit uncovered, red barrel
with unknown contents taken out for assessment.
R. Ralea from RPG determined barrel was too
  
  44   Monday, February 25, 2013, 16:37 Keith C NgM9MaintenanceM9 Q1 Q2 removal, Q2 seal disassemblyRemoved Q2 15" indium seal ring, discovered
seal contained rubber on both sides instead
of indium.
 7x 
  43   Friday, February 22, 2013, 17:27 Keith C NgM9RepairM9 Q1 Q2 removal, Q2 joint dissassemblyM9 Q2 15" pin drive was removed and
disconnected.
- Pin drive retention screw had to
 20130222_m9q1q2remove_P1020840.JPG20130222_m9q1q2remove_P1020832.JPG20130222_m9q1q2remove_P1020831.JPG 
  42   Thursday, February 21, 2013, 17:02 Keith C NgM9MaintenanceM9 Q1 Q2 removal, joint dissassemblyCUALCW system water loss was not from 1A
triplet. Q15 Q16 held static  pressure at
90 psi since 9 am until 17:00. Holding with
  
  41   Tuesday, February 19, 2013, 16:46 Keith C NgM9MaintenanceM9 Q1 Q2 removal, preparationDetermined M9 Q2 service stand supply connector
was slowly leaking.
- Ball valve to the supply was leaking
 20130219_m9q1q2remove_IMG_0206.JPG 
  40   Monday, February 18, 2013, 16:24 Keith C NgM9RepairM9 Q1 Q2 removal, electrical and water disconnectedToday, re-arranged electrical wiring on
Q1 Q2 magnet away from Q2 indium joint. Cable
bundles were bundled as neatly as possible.
 20130218_m9q1q2remove_P1020787.JPG20130218_m9q1q2remove_P1020786.JPG20130218_m9q1q2remove_P1020788.JPG 
  39   Friday, February 15, 2013, 14:29 Keith C NgM9MaintenanceM9 Q1 Q2 removal, preparationBeam lines group purged M9 Q1 Q2 magnets
and water lines in preparation of disconnecting
water services to those magnets, done in
 20130215_m9q1q2remove_P1020780.JPG20130215_m9q1q2remove_P1020778.JPG20130215_m9q1q2remove_P1020781.JPG 
  38   Thursday, February 14, 2013, 15:43 Keith C NgM9MaintenanceM9 Q1 Q2 removal, preparationRemoved 8" rubber test rings from
M9 T2 joint. Rings moved to RH warm cell.
Radiation levels were 70 µSv on contact
 20130214_m9q1q2remove_IMG_0179.JPG20130214_m9q1q2remove_IMG_0177.JPG20130214_m9q1q2remove_IMG_0187.JPG20130214_m9q1q2remove_IMG_0181.JPG20130214_m9q1q2remove_IMG_0185.JPG 
  37   Wednesday, February 13, 2013, 15:49 Keith C NgM9MaintenanceM9 Q1 Q2 removal, preparationLocal and remote leak checks on M9 T2 area
were done today to confirm leak; Leak was
still present at T2 M9 joint. M9 Q1 and Q2
  
  36   Friday, February 08, 2013, 15:31 Keith C NgM9RepairM9 Q1 Q2 removal, site preprationCompleted remote handling/shielding setup
over T2 M9, see photos for setup.
- Rad levels at 16' above Q2 were
 20130208_m9q1q2remove_IMG_0172.JPG20130208_m9q1q2remove_IMG_0174.JPG20130208_m9q1q2remove_IMG_0175.JPG 
  35   Thursday, February 07, 2013, 16:02 Keith C NgM9RepairM9 Q1 Q2 removal, site preprationStarted work on removing M9 Q1 Q2 magnets;
area clean up and preparation, removing shielding
above Q1 and Q2 and remote handling setup
 20130207_m9q1q2remove_IMG_0155.JPG20130207_m9q1q2remove_IMG_0162.JPG20130207_m9q1q2remove_IMG_0165.JPG20130207_m9q1q2remove_IMG_0154.JPG20130207_m9q1q2remove_IMG_0157.JPG 
  34   Wednesday, February 06, 2013, 16:33 Keith C NgPrimary BeamlinesMaintenancet2 monolith measurementsBeam lines took measurements of top of
T2 using Leica Total Station. Required no
crane activities over 1A blocks.
 20130206_t2alignmeas_IMG_0140.JPG20130206_t2alignmeas_IMG_0139.JPG 
  33   Tuesday, February 05, 2013, 16:12 Keith C NgPrimary BeamlinesMaintenance1A triplet repair (ground fault) (Completed)Today: D. Preddy completed another power
test on 1A Q14, 15, 16 after all iron/steel
shielding was restored. Magnet power and
  
  32   Monday, February 04, 2013, 16:04 Keith C NgPrimary BeamlinesRepair1A triplet repair (ground fault)Restored 1A triplet shielding and removed
RH shielding.
 
 20130204_tripletrepair_IMG_0129.JPG20130204_tripletrepair_IMG_0130.JPG20130204_tripletrepair_IMG_0132.JPG20130204_tripletrepair_IMG_0134.JPG20130204_tripletrepair_IMG_0133.JPG 
  31   Friday, February 01, 2013, 14:15 Keith C NgPrimary BeamlinesMaintenanceM9 Q1 Q2; storage pit assessmentUncovered radioactive waste storage pit
to see contents. Assessing viability of moving
contents inside to facilitate storage of
 20130201_radwastepit_P1020704.JPG20130201_radwastepit_P1020720.JPG20130201_radwastepit_P1020736.JPG20130201_radwastepit_RHB_5449.JPG 
  30   Wednesday, January 30, 2013, 16:46 Keith C NgPrimary BeamlinesRepair1A triplet repair (ground fault)Cut and removed asymmetric steering cables
from Q14 and 16, cables are no longer resting
on magnet power bus bars.
 20130130_tripletrepair_P1020683.JPG20130130_tripletrepair_IMG_0123.JPG20130130_tripletrepair_P1020686.JPG20130130_tripletrepair_IMG_0118.JPG20130130_tripletrepair_P1020697.JPG 