Message ID: 41     Entry time: Tuesday, February 19, 2013, 16:46
Author: Keith C Ng 
Category: M9 
Type: Maintenance 
Subject: M9 Q1 Q2 removal, preparation 

Determined M9 Q2 service stand supply connector was slowly leaking.

- Ball valve to the supply was leaking through allowing trace amounts of water through.

- System was bled again and pressure relieved, leak appears to have stopped.

 

20130219_m9q1q2remove_IMG_0206.JPG

 

 

Inspected M9 Q1 joint bottom bellows bolt lug and spring eye gaps.

- Bottom bolt is in tension, tried to move with tool and did not move.

- Observed spring eye gaps: 1/32" or less on West spring eye, 0.200" on East spring eye.

 

Cleaned up RH setup in preparation for moving bridge setup tomorrow.