Successfully stacked old m20 q2 q2 magnet assembly on top of old M9 Q1 Q2 magnet and M11 septum magnet. See photos.
- Done to create room for current m9 Q1,2 magnet.
- Used 6' remote handling bridge on north end of open pit for shielding.
- Fields around railing/pit were around 460 µSv/h.
  
Old blank off, taper pins and dust cap were placed into lead flask.
- Radiation levels of pins not measured at this time. |