Message ID: 46     Entry time: Friday, March 01, 2013, 15:28
Author: Keith C Ng 
Category: M9 
Type: Maintenance 
Subject: Radadioactive Waste Pit Organizing 

Successfully stacked old m20 q2 q2 magnet assembly on top of old M9 Q1 Q2 magnet and M11 septum magnet. See photos.

- Done to create room for current m9 Q1,2 magnet.

- Used 6' remote handling bridge on north end of open pit for shielding.

- Fields around railing/pit were around 460 µSv/h.

20130301_radwastepit_P1020865.JPG20130301_radwastepit_P1020869.JPG20130301_radwastepit_P1020873.JPG

Old blank off, taper pins and dust cap were placed into lead flask.

- Radiation levels of pins not measured at this time.