Removed M9 Q1 Q2 from beam line 1A via crane and transferred from beam line to radiation waste storage.
Magnet craned out of position in front of T2 monolith and then placed into bunker next to work site.
- Bunker pre-lined with plastic enough to envelope magnet.
Magnet craned over to radioactive storage and landed in south end of storage pit.
- Magnet did not sit on pit floor.
- Supported by a length of pipe on west of pit floor, Q1 leaning against south of pit wall and alignment bracket braced against a magnet on the east side of pit. See photos.
|