Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines  Not logged in ELOG logo
Message ID: 42     Entry time: Thursday, February 21, 2013, 17:02
Author: Keith C Ng 
Category: M9 
Type: Maintenance 
Subject: M9 Q1 Q2 removal, joint dissassembly 

CUALCW system water loss was not from 1A triplet. Q15 Q16 held static pressure at 90 psi since 9 am until 17:00. Holding with very minimal change in pressure. Q14 reading 64 psi as of 17:00. D. Preddy informs all other systems leak tight.

 

M9 Q1 joint disassembled, blank off and pins removed.

- M9 Q2 joint pin drive retracted but was not removed. Pin drive did not contain the roll pin that aids extraction of the drive.

 

 

ELOG V2.9.2-2455