Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines  Not logged in ELOG logo
Message ID: 37     Entry time: Wednesday, February 13, 2013, 15:49
Author: Keith C Ng 
Category: M9 
Type: Maintenance 
Subject: M9 Q1 Q2 removal, preparation 

Local and remote leak checks on M9 T2 area were done today to confirm leak; Leak was still present at T2 M9 joint. M9 Q1 and Q2 power supply leads were disconnected (C. Yee). Next task is to find the ground fault on the Q1 magnet.

Indium one piece blank off plate (TB22267) for blanking off assembly (TB22265) was submitted into shop today.

ELOG V2.9.2-2455