Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines  Not logged in ELOG logo
Message ID: 34     Entry time: Wednesday, February 06, 2013, 16:33
Author: Keith C Ng 
Category: Primary Beamlines 
Type: Maintenance 
Subject: t2 monolith measurements 

Beam lines took measurements of top of T2 using Leica Total Station. Required no crane activities over 1A blocks.

20130206_t2alignmeas_IMG_0139.JPG

Attachment 1: 20130206_t2alignmeas_IMG_0140.JPG  3.495 MB  | Show | Hide all
ELOG V2.9.2-2455