Subject: M9 Q1 Q2 removal, preparation 

Beam lines group purged M9 Q1 Q2 magnets and water lines in preparation of disconnecting water services to those magnets, done in morning.

- Note: Q15 protueus paddle wheel was replaced after finding it was worn

 

Water connections at service stand partially disconnected.

- Q2 water lines disconnected, 1 Q1 water line is disconnected but stuck on hansen fitting. with continue on Monday.

20130215_m9q1q2remove_P1020780.JPG20130215_m9q1q2remove_P1020778.JPG

 

- Photo showing stuck fitting shown below (fitting on the right).