Message ID: 36     Entry time: Friday, February 08, 2013, 15:31
Author: Keith C Ng 
Category: M9 
Type: Repair 
Subject: M9 Q1 Q2 removal, site prepration 

Completed remote handling/shielding setup over T2 M9, see photos for setup.

- Rad levels at 16' above Q2 were 1.2 mSv/h. Shielding was built up to 20' level, same as the opposite side to minimize exposure.

20130208_m9q1q2remove_IMG_0172.JPG

20130208_m9q1q2remove_IMG_0174.JPG20130208_m9q1q2remove_IMG_0175.JPG