  79   Wednesday, January 15, 2025, 12:57 Albert KongHot Cell 1DevelopmentAPTW Front End HTV Water Connector Exchange TestingThe four water connections on the front
end plate of the APTW that will connect to
the HTV were tested for replacement with
 Screenshot_2025-01-15_121632.pngJan15_FE_Plate_Water_Lines.pdfJan23_FE_Plate_Water_Lines.pdfJan29_FE_Plate_Water_Lines.pdfFeb06_FinalHTVFEPlateWaterLineExchangeTesting.pdf 
  81   Wednesday, January 15, 2025, 13:23 Albert KongHot Cell 1DevelopmentAPTW Front End Power Busbars Stabuli Connector ExchangeWe successfully performed a removal and
replacement of a power busbar stabuli connector
on the front end plate where the HTV connects
 Jan_15_Stabuli.pdf 
  82   Wednesday, January 15, 2025, 13:52 Albert KongHot Cell 1DevelopmentAPTW Front End VCR Gasket SelectionToday RH (CF and AK) agreed upon using
the following style of gaskets for the ARIEL
front ends:
 IMG_0960.JPEG 
  83   Thursday, February 13, 2025, 18:00 Albert KongHot Cell 1DevelopmentAPTW Front End Mid-Height and Upper VCR Joint Access and Service TestingFeb 13:
The 'hanging' VCR joint on the driver
side was successfully exchanged by hand:
 Feb13_UpperVCRTesting.pdf 
  84   Thursday, February 20, 2025, 14:44 Albert KongHot Cell 1DevelopmentAPTW Front End KF Gasket Clamps Servicing Tests (By Gate Valve)Covers testing for dealing with KF joints
by the gate valve on the FE.
Photos provided in PDF, download
 Feb_20_FE_KF_Joint_Clamps.pdf 
  85   Monday, March 10, 2025, 11:35 Jason ZhangHot Cell 1DevelopmentARIEL Hot Cell PLC Update - 1000kg Crane Travel ZoneWednesday, March 05, 2025, 13:00
Implemented and tested travel zone
restrictions for the 1000kg crane to prevent
  
  86   Thursday, March 20, 2025, 16:54 Albert KongHot Cell 1DevelopmentAPTW Front End High Voltage Shielding Exchange TestingPhotos compiled in pdf, download to view
in case ELOG preview truncates.
------------------
 HV_Shield_Testing_Mar_20.pdfApril_16.pdf 
  87   Wednesday, April 09, 2025, 15:31 Adam NewsomeHot Cell 1DevelopmentTwo jib cranes installedTwo externally mounted jib cranes were
installed on the ARIEL hot cell - one on
the West side above the tool port, and one
 ACDC_CRANES_3500_Job_10098_General_Quote24_2.pdfPXL_20250409_175712902.MP.jpgPXL_20250409_175730905.MP.jpg 