ID Date Author Category Typedown Subject Text Attachments
  60   Tuesday, March 21, 2023, 10:47 Adam NewsomeHot Cell 1RepairCircuit breaker replacement - telemanipulatorsThere was an issue with a 20 A circuit
breaker used to control motor assist functions
for the telemanipulators (specifically, the
  
  63   Wednesday, August 02, 2023, 09:13 chad fisherHot Cell 1RepairLeak Rate TestingOn August 1, 2023 HC1 was pumped down to
-1200 Pa (gauge) and then valved off to test
the leak rate after turntables had been sealed
  
  65   Wednesday, April 24, 2024, 09:17 Adam NewsomeT-Hall CraneRepairTarget Hall Crane: VFD DC bus undervoltage fault [root cause: encoder board failure on 900VFD]On 2024-04-22 around 3:30 pm it was discovered
that the crane's main hoist was in a faulted
state. The operator (Adam Newsome) experienced
 DC_bus_voltage.jpegPXL_20240422_225858594.jpg 
  73   Thursday, November 28, 2024, 09:04 Adam NewsomeHot Cell 1RepairHot Cell turntables not rotating, access hatch not movingIt was reported that the hot cell turntables
would not rotate and the access hatch could
not be operated. The turntables' elevation
  
  1   Tuesday, November 04, 2014, 16:58 John Wong100KW Beam DumpMaintenanceTesting ElogTuesday, November 04, 2014, 16:58
This is a test.

 
  
  27   Monday, January 25, 2016, 13:20 Allon MessenbergT-Hall CraneMaintenancePossible oil leakTwo small (approx. 5 cm across) puddles
of green fluid were discovered on the floor,
directly below the crane trolley.  The
 20160122_161849.jpg20160122_161830.jpg20160125_100929.jpg 
  46   Wednesday, September 15, 2021, 15:10 Adam NewsomeT-Hall CraneMaintenanceHoist Broken Fault (actually: cable wrap issue)A fault occurred which presented as "114.
Main Hoist Cable Broken (3200PX)". This
occurred when a SEG block was suspended approximately
  
  47   Thursday, September 16, 2021, 09:37 Adam NewsomeT-Hall CraneMaintenanceBridge Encoder HomingThe bridge motion was slowed due to encoder
homing issue. It is likely that the problem
which occurred yesterday caused an velocity
 PXL_20210916_161245978.jpgPXL_20210916_161205277.jpg 
  51   Friday, February 18, 2022, 09:26 Adam NewsomeT-Hall CraneMaintenancePotential grease leak observedNaimat Khan noticed after using the crane
that some grease dropped onto a spreader
bar, and believes it is a leak from the main
 MicrosoftTeams-image_(9).png 
  54   Tuesday, August 23, 2022, 10:32 Adam NewsomeT-Hall CraneMaintenanceNorth Aux Hoist - reverse motion axes on E/WUpdate 2022-10-06: During routine
inspection of the crane, Tom  Kauss investigated
the direction swap issue. It was determined
  
  62   Wednesday, April 26, 2023, 16:06 Adam NewsomeT-Hall CraneMaintenanceTarget Hall Crane - Hoist Wire WrappingIt was observed recently that the main
hoist's wires seemed skewed, and there was
occasionally some noise heard when raising
 20230131_120303.jpg 
  64   Wednesday, February 14, 2024, 09:02 Adam NewsomeT-Hall CraneMaintenanceTarget Hall Crane: Trolley Encoder HomingThe main trolley's E/W motion was observed
to be slowed on 2024-02-13. 
Upon investigation, the following
 PXL_20240214_160748765.jpg 
  74   Friday, November 29, 2024, 15:23 Adam NewsomeHot Cell 1Maintenance1000 kg crane: y axis position display not functioningAfter a recent power cycle, the y-axis
referencing was lost for the 1000 kg crane.
The position readout was also incorrect,
 PXL_20241202_204356508.jpg 
  2   Wednesday, November 19, 2014, 13:49 Isaac Earle100KW Beam DumpDevelopmentDecision on Modifications to Lower Center Block (TSH0225)I received a call today from Jim Adamson
at Kaltech regarding modifications to shielding
block TSH0225.
  
  3   Friday, November 21, 2014, 13:37 Isaac Earle100KW Beam DumpDevelopmentDestructive Testing of 1" MDC Ceramic BreaksTesting was performed on the ceramic water
breaks to be used on the beam dump water
hose assemblies.  The ceramic breaks
 Ceramic_Water_Break_Test_#1.docxCeramic_Water_Break_Test_#2.docxTest_#1_Broken_Sample.JPGTest_#2_Broken_Sample.JPG 
  4   Wednesday, November 26, 2014, 17:50 Isaac Earle100KW Beam DumpDevelopmentInstallation of Lower Center Block (TSH0461)Painting and relabeling of the modified
lower center block (TSH0461) was completed
on Monday Nov 24.  
 Beam_Dump_Lower_Center_Block_Alignment_-_Nov_25_2014_(from_Darren_Blom).txtIMG_1110.JPGIMG_1125.JPGIMG_4297.JPGIMG_4303.JPG 
  5   Wednesday, December 03, 2014, 10:16 Isaac Earle100KW Beam DumpDevelopmentInstallation of Lower Lead Block and Beam Dump InsertOn November 28th the lower lead shield
was installed with 3/8" shimming at
the front end, and 11/32" shimming at
  
  6   Wednesday, December 03, 2014, 10:36 Isaac Earle100KW Beam DumpDevelopmentUpper half of BD water blocks installed; Bypass loops installedOn December 2 the upper half of the RH
water blocks were installed (4 total) using
a 0.030" thick 6061-T6 Al shim torqued
 IMG_4381.JPG 
  7   Wednesday, December 03, 2014, 10:45 Isaac Earle100KW Beam DumpDevelopmentBD Signals Traced from Service Stand to Junction BoxOn Dec 2 the cables from the BD service
stand area to the junction box were traced
to establish which sensors correspond to
  
  8   Friday, December 05, 2014, 10:43 Isaac Earle100KW Beam DumpDevelopmentLower Lead Shield Drain Line InstalledA 1/8" SS tube was routed from the
Swagelok fitting on the front of the lower
lead shield to the service stand water catch
 IMG_4383.JPGIMG_4384.JPGIMG_4385.JPG 