  229   Monday, November 05, 2012, 09:47 Aurelia Laxdal LP-SISITWTM1  DoneTPS optics cannot be turned off. All TPS optics, with the exception of TPS:Q4
cannot be turned off. E-Fault#6395 for Controls.
Same for the TSG optics: CB1, VCB1
  
  230   Monday, November 05, 2012, 13:26 Aurelia Laxdal LP-SISITWTM1  DoneVenting the Test StandVenting the Test Stand.
TiC#3 will be ready to be removed
in few minutes. 
  
  231   Monday, November 05, 2012, 14:41 Anders MjosTiC#3LP-SISITWTM1  DoneTarget RemovedTarget looks OK. The right leg was a bit
much out of center and will be adjusted in
the lab.
  
  287   Monday, March 25, 2013, 11:39 Anders MjosTa#39LP-SISITWTM1  DoneTa#39 commissioningTarget installed with 130 in lbs torque
on all bolts.
Monday, March 25, 2013, 11:36: Roughing
  
  337   Friday, September 27, 2013, 11:41 Anders MjosTa#41HP-SISITWTM439069-538817-10DoneTa#41 ConditioningFriday, September 27, 2013, 11:41: Roughing
Friday, September 27, 2013, 12:08:
Turbos started
 Ta#41_EE_After_Test_Stand.pdf 
  364   Monday, March 17, 2014, 19:10 Anders MjosTa#42LP-SISITWTM440282-139956-1 / 39956-9 (base / lid)In progressConditioningNOTE:
TBHT
Power Supply is 600A. EPICS thinks it is
 Ta#42_Test_Stand.docxOMEGA_OM-DAQPRO-5300_21-Mar-14_13.56.35.dlp 
  371   Friday, April 04, 2014, 17:01 Rick MaharajUC#9LP-SISITWTM1 39230-3DoneConditioning Heatshield for UCx#9Friday, April 04, 2014, 16:26: Heatshield/Ionsource
assembly for UC LP SIS  installed in
test stand with Ta tube as heat load.
  
  390   Thursday, June 26, 2014, 16:32 Anders MjosTa#43LP-SISITWTM140282-239230-6In progressConditioning Ta#43Thursday, June 26, 2014, 16:31: Roughing.
Thursday, June 26, 2014, 16:51: Starting
turbos. 
 Ta#43_Conditioning.docx 
  397   Friday, August 08, 2014, 12:45 Anders MjosZrC#6LP-SISITWTM140282-339230-5DoneCondictioning ZrC#6Friday, August 08, 2014, 12:44: Stopped
turbos
Friday, August 08, 2014, 14:42: Venting 
  
  404   Thursday, September 25, 2014, 15:44 Anders MjosThO#1 ITWTM140282-5 DoneThO#1 Heat Shield ConditioningThursday, September 25, 2014, 15:44: Roughing
Thursday, September 25, 2014, 16:06:
Starting turbos
  
  446   Monday, May 25, 2015, 14:40 Anders MjosSiC#31HP-SISITWTM438817-7 In progressSiC#31 ConditioningMonday, May 25, 2015, 14:35: Rouging
Monday, May 25, 2015, 15:05: Turbos
started.
 SiC#31.docxER30kV580-200.txtER30kV580-230.txt 
  468   Wednesday, October 07, 2015, 11:16 Anders MjosSiC#32HP-FEBIADITWTM2  In progressConditioning SiC#32Wednesday, October 07, 2015, 11:15: roughing
Wednesday, October 07, 2015, 12:09
Turbos started
 SiC#32.docx 
  469   Tuesday, October 13, 2015, 07:47 Anders MjosSiC#32HP-FEBIADITWTM2  In progressConditioning SiC#32Target was pumped down on Friday.

Tuesday, October 13, 2015,
07:47: Opened water for HS. No response on
 SiC#32-2.docx 
  471   Tuesday, October 13, 2015, 17:23 Anders MjosSiC#32HP-FEBIADITWTM2  In progressConditioning SiC#32Tuesday, October 13, 2015, 17:22: Roughing
Tuesday, October 13, 2015, 18:07:
Started turbos.
 SiC#32-3.docxEmittance.zipNeEfficiecy.xlsx 
  497   Friday, March 04, 2016, 14:23 Anders MjosTarget tube onlyLP-SISITWTM239459-241120-10In progressConditiong Heat Shield for UC#15Friday, March 04, 2016, 14:20: Roughing
Friday, March 04, 2016, 15:05: Turbos
started
  
  506   Thursday, April 21, 2016, 14:26 Aaron SchmidtTa#48HP-SISITWTM241369-541120-5In progressConditioning Ta#48Thursday, April 21, 2016, 14:25: Begin
pumping down.
Thursday, April 21, 2016, 15:02:
 TS-2016-04-21_Ta#48.rga 
  518   Monday, June 27, 2016, 13:11 Aaron SchmidtSiC#33HP-SISITWTM2 41120-7 Conditioning SiC#33Monday, June 27, 2016, 12:05: Roughing.
Monday, June 27, 2016, 13:08: Turbo
pumps on.
 8x 
  528   Wednesday, August 03, 2016, 13:47 Aaron SchmidtTa#49HP-SISITWTM2 41751-10 Conditioning Ta#49Wednesday, August 03, 2016, 13:47: Roughing
Wednesday, August 03, 2016, 14:17:
Turbo pumps started.
 7x 
  543   Friday, September 30, 2016, 11:11 Aaron SchmidtSiC#35HP-FEBIADITWTM239530-941120-8DoneConditioning SiC#35Friday, September 30, 2016, 10:00: Roughing.
Friday, September 30, 2016, 10:01:
Roughing stopped. RP1 failure. Breaker tripped.
 6x 
  549   Thursday, October 27, 2016, 13:37 Aaron SchmidtUC#18LP-SISITWTM2 41751-3In progressConditioning Heat shield for UC#18Thursday, October 27, 2016, 13:36: Roughing.
Thursday, October 27, 2016, 14:27:
Turbo pumps started.
 UC#18_Heat_shield_conditioning.docxTS-2016-10-27-16-00.rga 