Entry  Thursday, June 16, 2016, 14:34, Aaron Schmidt, , LP-SIS, , , , , , TUBE ONLY (3) Tube_only-full-fernando_test-160617-PE-RPE.zipTube_only-full-fernando_test-160617-WPE.zip

Thursday, June 16, 2016, 14:33: Roughing. Plasma Electrode re-attached. Salts replaced.

Thursday, June 16, 2016, 15:12: Turbo pumps started.

Thursday, June 16, 2016, 15:22: Ion gauge on.


Friday, June 17, 2016, 08:32: Water opened. RGA ok. Vacuum stable @ 2.4E-7T. Power/sources on.


Saturday, June 18, 2016, 09:31: Cool down started.


Monday, June 20, 2016, 09:48: Sources/power/voltages off.

Monday, June 20, 2016, 10:06: IV4 reset. Water lines purged.

 Monday, June 20, 2016, 10:11: RGA off. Ion gauge off. Turbos off.

Monday, June 20, 2016, 11:50: Venting

Entry  Tuesday, June 14, 2016, 10:46, Aaron Schmidt, , LP-SIS, , , , , , TUBE ONLY - NO PLASMA ELECTRODE Tube_only_SIS_test-all-160615.zip2016-06-13.zip2016-06-15.zipre-em-plots.zip

Tuesday, June 14, 2016, 10:46: Begin roughing.

Tuesday, June 14, 2016, 11:16: Turbo pumps started.

Tuesday, June 14, 2016, 11:23: Ion gauge on.


Wednesday, June 15, 2016, 07:45: Water opened. RGA ok. Vacuum stable @ 1.9E-7T. Power/sources on.

Wednesday, June 15, 2016, 08:24: BIAS / EZL / EE to 30 / 13 / 1.5 kV

Wednesday, June 15, 2016, 08:24: Ramping TBHT to 120 A at 1 A/min

Wednesday, June 15, 2016, 10:23: EZL P/S was not on. Switched on and set to 13 kV

Wednesday, June 15, 2016, 15:05: Ramping down.


Thursday, June 16, 2016, 08:57: IV4 reset. RGA off. Ion gauge off. Turbo pumps off.

Thursday, June 16, 2016, 13:22: Water lines purged. Power/sources off. Venting.

Entry  Friday, June 10, 2016, 12:42, Anders Mjos, , , , , , , Problems/Solutions, FC0 BIAS probelm 

 Graham Waters is looking into this problem. The IOC has been rebooted a couple of times.

Entry  Thursday, June 09, 2016, 14:56, Aaron Schmidt, , LP-SIS, , , , , , TUBE ONLY Tube_only_SIS_test.zip

Thursday, June 09, 2016, 14:50: Begin roughing.

Thursday, June 09, 2016, 15:34: Turbo pumps started.

Thursday, June 09, 2016, 15:42: Ion gauge on.


Friday, June 10, 2016, 08:27: RGA on.

Friday, June 10, 2016, 08:35: Water opened. RGA ok. Vacuum stable @ 1.9E-7T

Friday, June 10, 2016, 08:50: BIAS/EZL/EE to 30/13/1.5kV.

Friday, June 10, 2016, 08:52: Auto ramping TBHT only @ 2A min to 50A.

Friday, June 10, 2016, 10:02: Auto ramping TBHT only @ 1A min to 100A.

Friday, June 10, 2016, 11:14: Continue ramping to 150 A -AM

Friday, June 10, 2016, 11:28: Stopped ramping ag 110 A -AM


Monday, June 13, 2016, 08:12: Auto ramping TBHT only @ 1A min to 150A.

Monday, June 13, 2016, 09:59: Ramping to 150 A - AM


Monday, June 13, 2016, 15:51: Ramping down.


Tuesday, June 14, 2016, 07:47: IV4 Reset. Ion gauge off. Turbos off.

Tuesday, June 14, 2016, 07:52: Power/sources off. Water purged.

Tuesday, June 14, 2016, 09:20: Venting.

Entry  Friday, June 03, 2016, 14:50, Aaron Schmidt, , , , , , , , Pumping down empty chamber. 

Friday, June 03, 2016, 14:50: Turbo pumps started.

Friday, June 03, 2016, 15:22:  RGA on.


Monday, June 06, 2016, 15:40: RGA still connected. OK. Screen shot saved. Vacuum @ 8.5E-07T


Wednesday, June 08, 2016, 15:26: RGA off

Wednesday, June 08, 2016, 15:29: Ion gauge off. Turbo pumps off.


Thursday, June 09, 2016, 12:44: Venting -AM

Entry  Wednesday, June 01, 2016, 10:02, Aaron Schmidt, UC#16, LP-IG-LIS, ITE, TM4, 39814-V2-1, , , Conditioning Heat shield for UC#16 OMEGA_OM-DAQPRO-5300_03-Jun-16_08.14.47.dlpTS-2016-06-02_UC#16.rgaTS-2016-06-02-13-46_UC#16.rgaUC#16.docx

Wednesday, June 01, 2016, 10:02: Begin roughing.

Wednesday, June 01, 2016, 10:44: Turbo pumps started.

Wednesday, June 01, 2016, 10:47: Ion Gauge IG1 ON.

Wednesday, June 01, 2016, 10:50; Turbos at speed. Vacuum at 1.24-5T.


Thursday, June 02, 2016, 08:54: Sources and power supply on. RGA on. Open water. Vacuum stable at 2.1E-07T. Heat shield water flow at 4.0 lpm.

Thursday, June 02, 2016, 09:05: Auto ramping TGHT/TBHT @ 2A min to 580A/250A

Thursday, June 02, 2016, 09:10: BIAS/EZL/EE to 30/13/1.5kV. IV4 opened

Thursday, June 02, 2016, 11:54: Stopped auto ramping for lunch break. - AM

Thursday, June 02, 2016, 13:01 : Auto ramping resumed. -AM

Thursday, June 02, 2016, 15:03: TGHT/TBHT @ 580A/250A

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  36.1 3.99
 TBHT 27.2 3.14
 COIL + EE  27.1 5.18
 TGHT  29.2 5.78

 

Thursday, June 02, 2016, 20:43: ramping down TGHT/TBHT at 2 / 1 A/min - AM


Friday, June 03, 2016, 08:06: Source off. Turbo pumps off. Ion gauge off. IV4 closed.

Friday, June 03, 2016, 08:21: Supply water pressure: 103 PSI. Return pressure: 10 PSI.

Friday, June 03, 2016, 09:27: Venting.

Entry  Thursday, May 12, 2016, 13:32, Aaron Schmidt, SiC, LP-SIS, , , 41077-3, , , EE new insulator Test, No PE , Dirty EE. 

Thursday, May 12, 2016, 13:00: Begin Roughing.

Thursday, May 12, 2016, 13:40: Turbo Pumps started

Thursday, May 12, 2016, 13:46: Ion gauge switched on.


Friday, May 13, 2016, 08:33: Opened water  supply for heat shield. Vacuum stable at 3.70E-7 T.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  28.9 4.06
 TBHT 29.0 3.20
 COIL + EE  28.5 5.24
 TGHT  28.5 5.72

Friday, May 13, 2016, 10:01: Auto ramping TGHT/TBHT to 420A/220A @ 2A/min.

Friday, May 13, 2016, 13:55

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.7 3.95
 TBHT 29.8 3.16
 COIL + EE  29.0 5.17
 TGHT  30.0 5.72

 


Monday, May 16, 2016, 11:29:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.7 4.06
 TBHT 29.4 3.18
 COIL + EE  28.7 5.18
 TGHT  29.8 5.77

Monday, May 16, 2016, 15:59:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.8 4.02
 TBHT 29.9 3.20
 COIL + EE  29.1 5.21
 TGHT  30.1 5.77

Note: RGA misread.


Tuesday, May 17, 2016, 15:15:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.8 4.02
 TBHT 30.6 3.29
 COIL + EE  29.0 5.16
 TGHT  30.1 5.74

Note: RGA Misread.


Wednesday, May 18, 2016, 14:30: IV4 open. FC0 open

Wednesday, May 18, 2016, 14:58: FC0 closed.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.8 4.02
 TBHT 29.3 3.15
 COIL + EE  29.0 5.14
 TGHT  30.0 5.72

 


Thursday, May 19, 2016, 16:26:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.8 4.06
 TBHT 29.3 3.15
 COIL + EE  28.8 5.17
 TGHT  30.0 5.77

 


Friday, May 20, 2016, 14:59:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.8 4.02
 TBHT 29.6 3.20
 COIL + EE  28.8 5.14
 TGHT  30.0 5.79

 


Tuesday, May 24, 2016, 15:31:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.8 4.02
 TBHT 29.9 3.18
 COIL + EE  29.0 5.15
 TGHT  30.1 5.72

 


Thursday, May 26, 2016, 15:18:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  34.0 4.02
 TBHT 30.6 3.28
 COIL + EE  29.0 5.14
 TGHT  30.0 5.75

 


Friday, May 27, 2016, 15:27: IV4 Closed

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.8 4.02
 TBHT 32.2 3.42
 COIL + EE  28.7 5.22
 TGHT  29.7 5.77

 


Monday, May 30, 2016, 08:35:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.8 4.05
 TBHT 29.9 3.25
 COIL + EE  28.7 5.18
 TGHT  29.7 5.78

Monday, May 30, 2016, 08:54: Auto ramp down TGHT/TBHT @ 2A/1A per min to 0A.


Tuesday, May 31, 2016, 08:25: Ion gauge off. Turbo pumps off.


Wednesday, June 01, 2016, 09:10: Venting

Wednesday, June 01, 2016, 9:45: Water lines purged, power off.

Entry  Friday, May 06, 2016, 10:18, Aaron Schmidt, SiC, LP-SIS, , , 41077-3, , , EE new insulator Test (2) No PE 

Friday, May 06, 2016, 10:18: Begin roughing

Venting: VCR on HS not closed

Friday, May 06, 2016, 12:58: Roughing

Friday, May 06, 2016, 13:22: Started turbos

Friday, May 06, 2016, 15:32: Vacuum at 1.2E-5 T


Monday, May 09, 2016, 09:07: Opened water  supply for heat shield. Vacuum stable at 2.78E-7 T.

Monday, May 09, 2016, 09:16:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  28.9 4.06
 TBHT 30.8 3.33
 COIL + EE  28.5 5.24
 TGHT  28.7 5.80

Monday, May 09, 2016, 09:35: Auto ramping TGHT/TBHT to 420A/220A @ 2A/min.

Monday, May 09, 2016, 13:26:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.7 4.06
 TBHT 31.8

3.40

 COIL + EE  28.8 5.19
 TGHT  30.0 5.82

 


Tuesday, May 10, 2016, 08:18:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.7 4.06
 TBHT 30.3

3.27

 COIL + EE  28.8 5.19
 TGHT  29.8 5.77

Tuesday, May 10, 2016, 12:36:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.5 4.06
 TBHT 29.9

3.20

 COIL + EE  28.8 5.18
 TGHT  29.8 5.82

Tuesday, May 10, 2016, 15:21:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.7 4.02
 TBHT 29.4

3.15

 COIL + EE  28.8 5.16
 TGHT  30.0 5.73

 


Wednesday, May 11, 2016, 08:45:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.5 4.02
 TBHT 29.3

3.16

 COIL + EE  28.8 5.13
 TGHT  30.0 5.77

Wednesday, May 11, 2016, 14:13:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.8 4.06
 TBHT 29.6

3.16

 COIL + EE  29.0 5.19
 TGHT  30.0 5.78

 

Wednesday, May 11, 2016, 17:39: Ramping down TGHT/TBHT -AM


Thursday, May 12, 2016, 08:04: Ion gauge off. Turbo pumps off.

Thursday, May 12, 2016, 11:08: Water lines off/purged. Venting.

Thursday, May 12, 2016, 11:32: Source off, lock on.

Entry  Monday, May 02, 2016, 16:03, Aaron Schmidt, SiC, LP-SIS, , , 41077-3, , , EE new insulator Test TS-2016-05-02_EE_insulator_test.rga

Monday, May 02, 2016, 16:01: Roughing.

Monday, May 02, 2016, 16:35: Turbos started -AM

 Monday, May 02, 2016, 16:43: Turbos at speed. Vacuum at 1.6E-5 T - AM


Tuesday, May 03, 2016, 08:15: Opened water  supply for heat shield. Vacuum stable at 2.5E-7 T. No response on RGA.

Tuesday, May 03, 2016, 08:33: Sources on

Tuesday, May 03, 2016, 08:37: Auto ramping TGHT/TBHT to 420A/220A @ 2A/min

Tuesday, May 03, 2016, 08:44: Sources off Except TGHT/TBHT

Tuesday, May 03, 2016, 08:47:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  28.9 3.99
 TBHT  29.6 3.24
 COIL + EE  28.5 5.15
 TGHT  28.7 5.77

 Tuesday, May 03, 2016, 12:42:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.5 4.06
 TBHT  29.6 3.17
 COIL + EE  28.7 5.16
 TGHT  29.8 5.78

Tuesday, May 03, 2016, 15:29;

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.7 4.02
 TBHT  30.4 3.26
 COIL + EE  29.0 5.16
 TGHT 30.0

5.77

 


Wednesday, May 04, 2016, 08:00:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.5 3.99
 TBHT  29.5 3.22
 COIL + EE  28.7 5.16
 TGHT 29.6

5.74

Wednesday, May 04, 2016, 12:53:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.5 4.06
 TBHT  29.6

3.19

 COIL + EE  28.7 5.19
 TGHT 29.6

5.72

Wednesday, May 04, 2016, 14:56: TSHWSW-1: 8 Psi , Gauge below: 106 Psi

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.5 4.02
 TBHT  29.8

3.19

 COIL + EE  28.8 5.21
 TGHT 29.8

5.80

 Wednesday, May 04, 2016, 15:01: Begin auto-cooling @ 2A/min.


Thursday, May 05, 2016, 08:33: TBHT/TGHT off. Ion gauge off. Turbo pumps off.


Friday, May 06, 2016, 08:10: Water lines purged. Power supply off. Venting.

Entry  Thursday, April 21, 2016, 14:26, Aaron Schmidt, Ta#48, HP-SIS, ITW, TM2, 41369-5, 41120-5, In progress, Conditioning Ta#48 TS-2016-04-21_Ta#48.rga

Thursday, April 21, 2016, 14:25: Begin pumping down.

Thursday, April 21, 2016, 15:02: Turbo pumps started.

Thursday, April 21, 2016, 15:34: Ion gauge on.

Thursday, April 21, 2016, 15:43: RGA on


Friday, April 22, 2016, 08:30: Opened water  supply for heat shield. Vacuum stable at 2.4E-7 T. No response on RGA.

Friday, April 22, 2016, 08:44: Anode breaker switched on. While off, a charge was measured via TSH:ANODE:RDCUR.


Monday, April 25, 2016, 08:08: Noticed Turbo pump 1 shut down around roughly 4 pm Sunday afternoon. Will attempt restart.

Monday, April 25, 2016, 08:15: Interlocks bypassed for TP1, Pump Restarted.

Monday, April 25, 2016, 08:23: TP1 @ speed. Vacuum recovered to 1.9E-7 T

 Monday, April 25, 2016, 08:41: IV4 opened. Auto ramping TGHT/TBHT to 400A/150A @ 2A/min.

Monday, April 25, 2016, 08:42: Turned on optics. BIAS/EZL/EE to 30/13/1.5kV

Monday, April 25, 2016, 13:40: Mass scan (test)

Monday, April 25, 2016, 14:04: Ramp down TGHT to 350A @ 2A/min.


Tuesday, April 26, 2016, 08:10: Auto ramping TGHT/TBHT to 580A/220A @ 2A/min.

Tuesday, April 26, 2016, 14:10: Auto ramping TBHT to 230A @ 2A/min.

Tuesday, April 26, 2016, 14:10: Ramp Down TBHT to 220A @ 2A/min.


Wednesday, April 27, 2016, 07:55: Auto ramp down TGHT/TBHT @ 2A/min to 0A.

Wednesday, April 27, 2016, 12:56: Ramp down Complete. Sources and optics off. IV4 Closed


Thursday, April 28, 2016, 08:52

 

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  28.9 4.02
 TBHT  28.6 3.16
 COIL + EE  28.3 5.22
 TGHT  28.7 5.75

 


Monday, May 02, 2016, 13:32: Ion gauge off. Turbo pumps off.

Monday, May 02, 2016, 15:03: Water supply closed.

Monday, May 02, 2016, 15:11: Venting

Entry  Friday, April 15, 2016, 16:07, Anders Mjos, , , , , , , Problems/Solutions, ANODE polarity switched to positive 

to test the effect of extraction when biasing of the target.

    Reply  Wednesday, April 20, 2016, 08:27, Anders Mjos, , , , , , , Problems/Solutions, ANODE polarity switched to negative 

Anders Mjos wrote:

to test the effect of extraction when biasing of the target.

 Testing finished. Switched back to negative polarity.

Entry  Wednesday, April 13, 2016, 13:03, Aaron Schmidt, , LP-SIS, , , 41790-2, 39956-8, , Testing restraint insulator prototype (2) Anode_Voltage_and_EE_(neg_bias).xlsxAnode_Voltage_and_EE_(pos_bias).xlsxRP#1_(2).docx

Wednesday, April 13, 2016, 13:03: Begin roughing. (Plasma electrode in. Salts in)

Wednesday, April 13, 2016, 13:34: Turbo pumps started.

Wednesday, April 13, 2016, 13:39: Ion Gauge on.


Thursday, April 14, 2016, 08:13: Open water to heat shield. Vacuum stable at 3.3E-7T.

Thursday, April 14, 2016, 08:19: Isolation valve opened. Auto ramping TGHT/TBHT to 300A/200A @ 2A/min.

Thursday, April 14, 2016, 08:33: Turned on optics. BIAS/EZL/EE to 30/13/1.5kV.

Thursday, April 14, 2016, 15:20: Ramping down TGHT from 300A to 250A @ 2A/min.


Friday, April 15, 2016, 8:23:  Slow ramping TGHT to 300A/ @ 1/2A/min.

Friday, April 15, 2016, 10:30: Begin ramping down TGHT/TBHT. @3A/2A per min.

Friday, April 15, 2016, 12:54: Sources off.

Friday, April 15, 2016, 13:09 :Water lines purged & power down.


Monday, April 18, 2016, 08:23: Opened water. Auto ramping TGHT/TBHT to 300A/200A @ 3A/2A per min. BIAS/EZL/EE to 30/13/1.5kV

Monday, April 18, 2016, 09:58: Ramping TBHT to 230A @ 2A/min

Monday, April 18, 2016, 12:54: Sources off. Ramping down @ 2A/min.


Tuesday, April 19, 2016, 09:37 : BIAS and EE off - AM

Tuesday, April 19, 2016, 15:30: Water, Ion gauge and Turbos off. 


Thursday, April 21, 2016, 13:41: Venting - AM

Entry  Monday, April 04, 2016, 11:33, Aaron Schmidt, , LP-SIS, , , 41790-2, 39956-8, In progress, Testing restraint insulator prototype Anode_Voltage_VS_Current.xlsxTS-2016-04-05_Restraint_Test.rgaTS-2016-04-13_Restraint_Test.rgaRP#1.docx

Monday, April 04, 2016, 11:31: Begin roughing. (No plasma electrode)

Monday, April 04, 2016, 12:47: Started Turbos and Ion gauge


Tuesday, April 05, 2016, 09:09: Open water, Vacuum increased from 3.7E-07 to 2.2E-06 (roughly). Leak detected, Confirmed via RGA, Water increased from 7.0E-7T to 5.8E-6T.

Tuesday, April 05, 2016, 09:17: Turbo Pumps stopped. Ion gauge shut off. RGA off.

Tuesday, April 05, 2016, 10:28: Venting for inspection.

Tuesday, April 05, 2016, 11:31: Inspect, re-tighten with new seals.. Begin roughing.

Tuesday, April 05, 2016, 11:54: Turbo pumps started.

Tuesday, April 05, 2016, 11:59: Ion gauge turned on.

Tuesday, April 05, 2016, 15:45: Opened water for heat shield. Vacuum stable @ 6.4E-7T - 6.8E-7T.

 Tuesday, April 05, 2016, 16:07: Vacuum stable @6.4E-7T.


Wednesday, April 06, 2016, 09:09: Started auto ramping up to 500A and 200A at 2A/min BIAS/EZL/EE to 30/13/1.5 KV

Wednesday, April 06, 2016, 09:22: Opened IV4. Switched on optics.

Wednesday, April 06, 2016, 14:29: Continue auto ramp up to 580A and 230A at 2A/min.


Thursday, April 07, 2016, 13:30: Most of the salts have evaporated FC0: at 3E-10A

Thursday, April 07, 2016, 14:10: Ramp down 2A/min.


Friday, April 08, 2016, 08:57: Ramp up 2A/min to 100A and 50A. ANODE to 200V.

Friday, April 08, 2016, 13:50: Ramp up 2A/min to 500A and 200A.


Monday, April 11, 2016, 08:29: Ramp up 2A/min to 580A and 230A. Vacuum stable @ 2.9E-7T

Monday, April 11, 2016, 09:44: ANODE current increased from 0 to 16 mA during the ramp up. -AM

Monday, April 11, 2016, 11:36: Increased TGHT voltage limit to 7.35 V. ANODE current now at 18 mA -AM

Monday, April 11, 2016, 16:00: BIAS / EZL / EE to 30 / 13 / 1.5 kV -AM


Tuesday, April 12, 2016, 08:47: Ramp Down 2A/min 230A to 200A TBHT only.

Tuesday, April 12, 2016, 09:31: Ramp Down 2A/min 580A to 500A TGHT only.

Tuesday, April 12, 2016, 13:55: Ramp up 2A/min 500A to 580A TGHT only.

 Tuesday, April 12, 2016, 15:43: Ramp up 2A/min 580A to 590A, Voltage limit increased to 7.50 TGHT only.

Tuesday, April 12, 2016, 15:59: Ramp down 2A/min and 1A/min.


Wednesday, April 13, 2016, 08:04 : RGA off.

Wednesday, April 13, 2016, 08:20: Source off. IV4 closed. Turbo pumps off.

Wednesday, April 13, 2016, 09:38: Venting.

Wednesday, April 13, 2016, 10:59: Venting paused.

Wednesday, April 13, 2016, 11:03: Venting Continued.

Wednesday, April 13, 2016, 11:24: Venting complete. RP#1 removed. (No plasma electrode).

Entry  Wednesday, March 30, 2016, 16:32, Aaron Schmidt, Ta#47, LP-SIS, ITE, TM4, 41790-1, 41120-05, In progress, Conditioning Ta#47 TS-2016-03-30_Ta#47.rgaER-580-230-30kV-m23.txtER-580-230-30kV-m27.txtITE-TM4-Ta#47-LP-SIS_Test_Stand.docxTa#47.docx

Wednesday, March 30, 2016, 16:31: Roughing.

Wednesday, March 30, 2016, 17:34 : Turbos started -AM

Wednesday, March 30, 2016, 18:50: Turbos at speed. Vacuum at 1.8E-6 T -AM


Thursday, March 31, 2016, 08:39: Opened water  supply for heat shield. Vacuum stable at 3.2E-7 T. No response on RGA.

Thursday, March 31, 2016, 08:48: Started heating Target. TGHT to 500A, TBHT to 170A @ 2/1 A/min.

Thursday, March 31, 2016, 09:07: Opened IV4. BIAS/EZL/EE to 30/13/1.5 kV


Friday, April 01, 2016, 17:53: Ramping down TGHT/TBHT -AM


Monday, April 04, 2016, 08:32: Source off. Closed IV4. Stopped the Turbo pumps.

Monday, April 04, 2016, 09:49: Venting.

Entry  Tuesday, March 29, 2016, 14:44, Aaron Schmidt, , , , , , , , Pumping down empty chamber. 

Tuesday, March 29, 2016, 14:43: Roughing.


 Wednesday, March 30, 2016, 14:33: Venting   -AM

Entry  Wednesday, March 16, 2016, 09:59, Anders Mjos, Target tube only, , , TM1, 39459-2, 40898-2, In progress, Conditiong Heat Shield for UC#15 

Back up heat shield for UC#15

Wednesday, March 16, 2016, 09:58: Roughing

Wednesday, March 16, 2016, 12:54: Started Turbo pumps

Wednesday, March 16, 2016, 13:02: Turbos at speed, Vacuum at 7.16E-06T


Thursday, March 17, 2016, 08:30: Opened water on heat shield circuit. Vacuum stable at 3.0E-07T. No response on RGA.

Thursday, March 17, 2016, 08:37: Auto-Ramping started. TGHT to 500A @ 2A/min. EE to 1500V.

Thursday, March 17, 2016, 15:40 @ 500A and 6.76E-07T


Friday, March 18, 2016, 08:35: Auto-cooling. Vacuum @5.87E-07T.

Friday, March 18, 2016, 14:13: Source off. Stopped turbo pumps.


Tuesday, March 29, 2016, 13:22: venting

Entry  Friday, March 11, 2016, 15:46, Anders Mjos, , , , , , , In progress, Testing end cap leak tightness 

Two Ta-tubes sealed with 2 end caps each placed in the vacuum chamber. 

Friday, March 11, 2016, 15:03: Rouging


Monday, March 14, 2016, 09:43: Caps still on the tube. Vacuum on CG1 5 mT


Wednesday, March 16, 2016, 08:37: Venting

Entry  Friday, March 04, 2016, 14:23, Anders Mjos, Target tube only, LP-SIS, ITW, TM2, 39459-2, 41120-10, In progress, Conditiong Heat Shield for UC#15 

Friday, March 04, 2016, 14:20: Roughing

Friday, March 04, 2016, 15:05: Turbos started

Friday, March 04, 2016, 15:11: Turbos at speed. Vacuum at 3.5E-5 T.


Monday, March 07, 2016, 08:34: Opened water. Vacuum stable at 6.7E-7 T. No response on RGA

Monday, March 07, 2016, 08:46: Started auto-ramping TGHT to 420 A at 2 A/min. EE to 1500 V


Tuesday, March 08, 2016, 08:26: Continued auto-ramping TGHT to 500 A.


Wednesday, March 09, 2016, 09:25: TGHT voltage limited at 488 A. Increased voltage limit from 6 to 6.5 V. Resumed auto-ramping to 500 A


Thursday, March 10, 2016, 08:19: Begin cool down @ 2 A/min ; Vacuum @ 7.1E-7 T

Thursday, March 10, 2016, 13:20: TGHT to 0 A. Switched off RGA.

Thursday, March 10, 2016, 14:04 : Source off. Stopped Turbo pumps.


Friday, March 11, 2016, 08:15: Begin venting.

Friday, March 11, 2016, 08:28: Heat shield water circuit has been purged.

 

Entry  Wednesday, March 02, 2016, 12:08, Anders Mjos, , , , , , , Problems/Solutions, TGHT insulator broken 

 The insulator for the TGHT terminals cracked during an attempt to remove a seized bolt.The right TGHT block was removed with the target and the bolt cut to remove the target. The single stand-off insulator on the target assembly cracked in the process.


Friday, March 04, 2016

Re-installed the TGHT terminal with new Keensert.

Entry  Tuesday, February 23, 2016, 10:43, Anders Mjos, SiC, LP-SIS, , , 41077-3, , , EE coating test - no Plasma Electrode 

Cleaned up EE and around target tube. Removed PE

Tuesday, February 23, 2016, 10:40: Roughing

Tuesday, February 23, 2016, 11:09: Starting turbos

Tuesday, February 23, 2016, 11:47: Turbos at speed. Vacuum at 7.5E-6 T

Tuesday, February 23, 2016, 13:43: EE to 1500 V. 518 uA

Tuesday, February 23, 2016, 15:07: RGA on


Wednesday, February 24, 2016, 08:48: Opened cooling water supply for HS circuit. Vacuum stable at 3.6E-7 T. No response on RGA

Wednesday, February 24, 2016, 08:51: IV4 opened

Wednesday, February 24, 2016, 08:56: BIAS/EZL/EE to 30 / 13 / 1.5 kV. Started auto-ramping to 420 / 220 A at 2 A/min.


Tuesday, March 01, 2016, 06:30: EE went into current limiting.

Tuesday, March 01, 2016, 08:30: Lowered EE voltage to 200 V

Tuesday, March 01, 2016, 09:41: Started cool down of target.

Tuesday, March 01, 2016, 09:50: RGA off

Tuesday, March 01, 2016, 13:27: BIAS / EZL / EE off. Stopped turbo pumps


Wednesday, March 02, 2016, 08:20: Venting