  Test-Stand, Page 26 of 53  Not logged in ELOG logo
  ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Statusdown Subject Text Attachments
  774   Monday, December 02, 2019, 16:01 Fernando Maldonado      In progressFerran irradiation copper end plate tests (aka MIST)Friday: Test to validate Ferran's assembly.
The plan is to ramp up to operating current,
apply high voltage, and possibly extract
  
  777   Tuesday, January 21, 2020, 09:38 Aaron SchmidtSiC#40LP-SIS  43044-843515-8In progressConditioning SiC#40 HSWas intended for UC#31 - Now used for SiC#40*
PEEK SEAL Test piece attached.
Tuesday, January 21, 2020, 09:34:
 SiC#40.docxSiC#40_-_HS_Out_gassing.docxTS-2020-01-21-11-10.rga 
  781   Thursday, January 30, 2020, 15:25 Aaron SchmidtC(#1)LP-SIS  43044-843515-3In progressConditioning C(#1) HSWas for UC# 32* - Schedule change, now
for C#1
Thursday, January 30, 2020, 15:13:
 C#1_-_Short.docx 
  782   Friday, February 07, 2020, 14:02 Aaron SchmidtC#(1)LP-SIS  43044-843515-3In progressConditioning C#(1) HSWas for UC# 32* - Schedule change, now
for C#1* - Last HS conditioning revealed
a TGHT to HS lid short. Milled the lid back
 C#1_-_2.docx 
  784   Wednesday, February 12, 2020, 11:04 Aaron Schmidt LP-SIS  41790-943515-1In progressConditioning HSUsing a broken LP-FEBIAD oven for out gassing.
Tentative UC#31*
Wednesday, February 12, 2020, 10:57:
 UC#31.docx 
  785   Thursday, February 20, 2020, 11:41 Aaron SchmidtTa#60LP-SIS  44139-1343515-5In progressTa#60 w/ EE testing Ta#60 (Unconditioned) - Salts in.
Thursday, February 20, 2020, 14:04:
Roughing.
 20200221_134828.jpg20200221_134939.jpgTa#60_-_TS_Pre-condition_-_EE_test_-_1.docx 
  787   Monday, March 02, 2020, 14:42 Aaron SchmidtTa#60LP-SIS  44139-1343515-5In progressFull TS testing w/ HV using Ta#60Monday, March 02, 2020, 14:36: Roughing.
Monday, March 02, 2020, 15:08: Turbo
pumps on.
  
  789   Wednesday, March 11, 2020, 13:31 Aaron SchmidtTa#60LP-SIS  44139-1343515-5In progressTa#60 w/ EE testing - 2Thermocouples installed on EE. Double checked
continuity & used a heat gun.
Wednesday, March 11, 2020, 13:30:
 Ta#60_-_TS_Pre-condition_-_EE_Test_-_2.docx 
  790   Tuesday, March 17, 2020, 11:40 Aaron SchmidtSiC#40HP-SISITWTM242218-843515-8In progressConditioning SiC#40Tuesday, March 17, 2020, 11:37: Roughing.
FS# 3 re-connected. All waterlines
re-opened except FS#5 (HS cooling).
 SiC#40_-_Conditioning.docxER-580-230-30kV-m7.txtER-580-230-30kV-m23.txtER-580-230-30kV-m38.txtITW-TM2-SiC#40-HP-SIS_Test_Stand.docx 
  794   Wednesday, June 10, 2020, 08:23 Aaron SchmidtC#1LP-SISITWTM243044-843515-3In progressConditioning C#1Salts: 
Li - 10 uL
Na - 10 uL
 7x 
  795   Tuesday, June 16, 2020, 11:03 Aaron SchmidtTa#60LP-SISITWTM244139-1343515-5In progressConditioning Ta#60 Tuesday, June 16, 2020, 11:01: Turbo pumps
on.

Wednesday, June 17, 2020,
 Ta#60_Conditioning.docxITW-TM2-Ta#60-LP-SIS_Test_Stand.docxER-580-230-30kV-m8.txtER-580-230-30kV-m40.txt 
  796   Monday, June 22, 2020, 07:07 Aaron SchmidtTest FEBIADHP-FEBIAD  38295-842752-5In progressTest FEBIAD (Fernando)Reminder. Mini pump still linked to SV1.
DO NOT OPEN SV2!!!
Monday, June 22, 2020, 08:45: Roughing.
 FEBIAD_Testing_-_June_22_-_23.docxER-580-280-30kV-m28.txt 
  801   Monday, July 20, 2020, 11:40 Aaron Schmidt(Empty-Test)   44160-143822-2In progressConditioning Test P2NSalts added: 
Cs - 15 uL
Li - 10 uL
 P2N_-_1_-_July-20-22-2020.docx 
  802   Wednesday, July 22, 2020, 08:56 Luca Egoriti P2N testHP-SISITETM4  In progressp2n heating test - electrical feedthrough configuration The electrical feedthroughs at the
top of the test stand module were reconfigured
to deliver up to 1200A to the p2n target.
 ISACteststand_TMwiring.pptxP2N-TestStand_20200722.pngP2N-TestStand_1200A.png 
  804   Tuesday, August 04, 2020, 15:07 Aaron SchmidtUCxLP-SIS  44139-1043515-4In progressUCx HS conditioning with PEEK assembly Tuesday, August 04, 2020, 15:04:
Roughing.

Wednesday, August 05, 2020,
 UCx_-_HS_w-PEEK_Assy_-_43515-4.docx 
  806   Tuesday, August 11, 2020, 12:04 Aaron SchmidtUCxLP-SIS  44139-1043515-4In progressUCx HS conditioning with PEEK assemblyHS target leg openings were milled. Short
from previous test by the look of it. TBHT
insulator on source side is cracked.
  
  808   Tuesday, August 18, 2020, 12:07 Aaron SchmidtTest FEBIADHP-FEBIAD  38295-842752-5In progressRP check & Mass magnet check.Tuesday, August 18, 2020, 12:05: RP1 on
Tuesday, August 18, 2020, 12:10:
RP1 off
  
  812   Thursday, September 03, 2020, 11:28 Aaron Schmidt-HP-FEBIAD  38295-842752-5In progressLeak check 2.0Out Gas & MB1 check (Or leak check
2.0)
Ref: https://elog.triumf.ca/TIS/Test-Stand/809
  
  814   Wednesday, September 30, 2020, 06:23 Aaron SchmidtC#2LP-SISITWTM244139-943515-2In progressConditioning C#2Wednesday, September 30, 2020, 06:14: Power
/ sources on.
Wednesday, September 30, 2020, 06:17:
 C#2_-_Short_-_EZL.docxC#2_Conditioning.docxITW-TM2-C#2-LP-SIS_Test_Stand.docx 
  815   Tuesday, October 13, 2020, 12:34 Aaron Schmidt HP-FEBIAD  38295-842752-5In progressMB1 Check.He & Ar calibrated leak bottles in.
Tuesday, October 13, 2020, 12:33:
Roughing.
 MB1_Check_Oct_-_2020.docx 