ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
|
774
|
Monday, December 02, 2019, 16:01 |
Fernando Maldonado | | | | | | | In progress | Ferran irradiation copper end plate tests (aka MIST) | Friday: Test to validate Ferran's assembly.
The plan is to ramp up to operating current,
apply high voltage, and possibly extract |
|
|
777
|
Tuesday, January 21, 2020, 09:38 |
Aaron Schmidt | SiC#40 | LP-SIS | | | 43044-8 | 43515-8 | In progress | Conditioning SiC#40 HS | Was intended for UC#31 - Now used for SiC#40*
PEEK SEAL Test piece attached.
Tuesday, January 21, 2020, 09:34: |
|
|
781
|
Thursday, January 30, 2020, 15:25 |
Aaron Schmidt | C(#1) | LP-SIS | | | 43044-8 | 43515-3 | In progress | Conditioning C(#1) HS | Was for UC# 32* - Schedule change, now
for C#1
Thursday, January 30, 2020, 15:13: |
|
|
782
|
Friday, February 07, 2020, 14:02 |
Aaron Schmidt | C#(1) | LP-SIS | | | 43044-8 | 43515-3 | In progress | Conditioning C#(1) HS | Was for UC# 32* - Schedule change, now
for C#1* - Last HS conditioning revealed
a TGHT to HS lid short. Milled the lid back |
|
|
784
|
Wednesday, February 12, 2020, 11:04 |
Aaron Schmidt | | LP-SIS | | | 41790-9 | 43515-1 | In progress | Conditioning HS | Using a broken LP-FEBIAD oven for out gassing.
Tentative UC#31*
Wednesday, February 12, 2020, 10:57: |
|
|
785
|
Thursday, February 20, 2020, 11:41 |
Aaron Schmidt | Ta#60 | LP-SIS | | | 44139-13 | 43515-5 | In progress | Ta#60 w/ EE testing | Ta#60 (Unconditioned) - Salts in.
Thursday, February 20, 2020, 14:04:
Roughing. |
|
|
787
|
Monday, March 02, 2020, 14:42 |
Aaron Schmidt | Ta#60 | LP-SIS | | | 44139-13 | 43515-5 | In progress | Full TS testing w/ HV using Ta#60 | Monday, March 02, 2020, 14:36: Roughing.
Monday, March 02, 2020, 15:08: Turbo
pumps on. |
|
|
789
|
Wednesday, March 11, 2020, 13:31 |
Aaron Schmidt | Ta#60 | LP-SIS | | | 44139-13 | 43515-5 | In progress | Ta#60 w/ EE testing - 2 | Thermocouples installed on EE. Double checked
continuity & used a heat gun.
Wednesday, March 11, 2020, 13:30: |
|
|
790
|
Tuesday, March 17, 2020, 11:40 |
Aaron Schmidt | SiC#40 | HP-SIS | ITW | TM2 | 42218-8 | 43515-8 | In progress | Conditioning SiC#40 | Tuesday, March 17, 2020, 11:37: Roughing.
FS# 3 re-connected. All waterlines
re-opened except FS#5 (HS cooling). |
|
|
794
|
Wednesday, June 10, 2020, 08:23 |
Aaron Schmidt | C#1 | LP-SIS | ITW | TM2 | 43044-8 | 43515-3 | In progress | Conditioning C#1 | Salts:
Li - 10 uL
Na - 10 uL |
7x |
|
795
|
Tuesday, June 16, 2020, 11:03 |
Aaron Schmidt | Ta#60 | LP-SIS | ITW | TM2 | 44139-13 | 43515-5 | In progress | Conditioning Ta#60 | Tuesday, June 16, 2020, 11:01: Turbo pumps
on.
Wednesday, June 17, 2020, |
|
|
796
|
Monday, June 22, 2020, 07:07 |
Aaron Schmidt | Test FEBIAD | HP-FEBIAD | | | 38295-8 | 42752-5 | In progress | Test FEBIAD (Fernando) | Reminder. Mini pump still linked to SV1.
DO NOT OPEN SV2!!!
Monday, June 22, 2020, 08:45: Roughing. |
|
|
801
|
Monday, July 20, 2020, 11:40 |
Aaron Schmidt | (Empty-Test) | | | | 44160-1 | 43822-2 | In progress | Conditioning Test P2N | Salts added:
Cs - 15 uL
Li - 10 uL |
|
|
802
|
Wednesday, July 22, 2020, 08:56 |
Luca Egoriti | P2N test | HP-SIS | ITE | TM4 | | | In progress | p2n heating test - electrical feedthrough configuration | The electrical feedthroughs at the
top of the test stand module were reconfigured
to deliver up to 1200A to the p2n target. |
|
|
804
|
Tuesday, August 04, 2020, 15:07 |
Aaron Schmidt | UCx | LP-SIS | | | 44139-10 | 43515-4 | In progress | UCx HS conditioning with PEEK assembly | Tuesday, August 04, 2020, 15:04:
Roughing.
Wednesday, August 05, 2020, |
|
|
806
|
Tuesday, August 11, 2020, 12:04 |
Aaron Schmidt | UCx | LP-SIS | | | 44139-10 | 43515-4 | In progress | UCx HS conditioning with PEEK assembly | HS target leg openings were milled. Short
from previous test by the look of it. TBHT
insulator on source side is cracked. |
|
|
808
|
Tuesday, August 18, 2020, 12:07 |
Aaron Schmidt | Test FEBIAD | HP-FEBIAD | | | 38295-8 | 42752-5 | In progress | RP check & Mass magnet check. | Tuesday, August 18, 2020, 12:05: RP1 on
Tuesday, August 18, 2020, 12:10:
RP1 off |
|
|
812
|
Thursday, September 03, 2020, 11:28 |
Aaron Schmidt | - | HP-FEBIAD | | | 38295-8 | 42752-5 | In progress | Leak check 2.0 | Out Gas & MB1 check (Or leak check
2.0)
Ref: https://elog.triumf.ca/TIS/Test-Stand/809 |
|
|
814
|
Wednesday, September 30, 2020, 06:23 |
Aaron Schmidt | C#2 | LP-SIS | ITW | TM2 | 44139-9 | 43515-2 | In progress | Conditioning C#2 | Wednesday, September 30, 2020, 06:14: Power
/ sources on.
Wednesday, September 30, 2020, 06:17: |
|
|
815
|
Tuesday, October 13, 2020, 12:34 |
Aaron Schmidt | | HP-FEBIAD | | | 38295-8 | 42752-5 | In progress | MB1 Check. | He & Ar calibrated leak bottles in.
Tuesday, October 13, 2020, 12:33:
Roughing. |
|
|