Entry  Monday, December 02, 2019, 16:01, Fernando Maldonado, , , , , , , In progress, Ferran irradiation copper end plate tests (aka MIST) 

Friday: Test to validate Ferran's assembly. The plan is to ramp up to operating current, apply high voltage, and possibly extract beam.

Turbos on. IG1. Power on.


Monday, December 02, 2019, 15:59: Auto-ramp to 230/600 A for TBHT/TGHT @ 2A/min and 4A/min  (0.5A/15 s 1 A/15s.)


Tuesday, December 03, 2019, 15:30: Sources on.

Tuesday, December 03, 2019, 15:41: Bias/EZL/EE @ 30/13/1.5 kV

 Bias/EE/EZL to 40/2.0/17 kV.

Bias/EE/EZL to 50/2.5/22 kV.

Bias/EE/EZL to 50/2.6/22.5 kV.

Spark. Inaudible

Tuesday, December 03, 2019, 17:26: Bias/EZL/EE to 0kV.

Tuesday, December 03, 2019, 17:26: Auto-cooling  @ 2A/min


Wednesday, December 04, 2019, 09:37: Power/sources off

Entry  Tuesday, January 21, 2020, 09:38, Aaron Schmidt, SiC#40, LP-SIS, , , 43044-8, 43515-8, In progress, Conditioning SiC#40 HS SiC#40.docxSiC#40_-_HS_Out_gassing.docxTS-2020-01-21-11-10.rga

Was intended for UC#31 - Now used for SiC#40*

PEEK SEAL Test piece attached.

Tuesday, January 21, 2020, 09:34: BV1A open Roughing.

Tuesday, January 21, 2020, 09:38: BV1B open.

Tuesday, January 21, 2020, 10:05: Turbo pumps on.

Tuesday, January 21, 2020, 10:10: Ion gauge on.


Monday, January 27, 2020, 07:07: PS / Sources on. Waterlines already opened.

Monday, January 27, 2020, 07:10: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.


Tuesday, January 28, 2020, 14:45: Auto-Cooling @ 2 A per min.


Thursday, January 30, 2020, 11:31: PS / Source off.

Thursday, January 30, 2020, 11:33: IG1 off. Turbos off.

Thursday, January 30, 2020, 13:00: Venting.

Entry  Thursday, January 30, 2020, 15:25, Aaron Schmidt, C(#1), LP-SIS, , , 43044-8, 43515-3, In progress, Conditioning C(#1) HS C#1_-_Short.docx

Was for UC# 32* - Schedule change, now for C#1

Thursday, January 30, 2020, 15:13: Roughing.

Thursday, January 30, 2020, 15:46: Turbo pumps on.

 Thursday, January 30, 2020, 15:50: IG1 on.


Friday, January 31, 2020, 08:14: Waterlines opened. No Vacuum response. Vacuum ok @ 6.10e-07T.

Friday, January 31, 2020, 08:16: Power / sources on

Friday, January 31, 2020, 08:18: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.


Monday, February 03, 2020, 12:56: Auto-cooling @ 2 A per min. 


Wednesday, February 05, 2020, 09:07: Power / sources off. Waterlines purged. IG1 & turbo pumps off.


Friday, February 07, 2020, 11:45:

Short was found on the HS Lid from the TGHT on the left. Milled out 1/8" off both HS lid / TGHT gaps. Lots of clearance now. Reheat req'd.

Entry  Friday, February 07, 2020, 14:02, Aaron Schmidt, C#(1), LP-SIS, , , 43044-8, 43515-3, In progress, Conditioning C#(1) HS C#1_-_2.docx

Was for UC# 32* - Schedule change, now for C#1* - Last HS conditioning revealed a TGHT to HS lid short. Milled the lid back 1/8" - Aaron S.

Friday, February 07, 2020, 14:00: Roughing.

Friday, February 07, 2020, 14:33: Turbo pumps on.

Friday, February 07, 2020, 14:38: IG1 on.


Monday, February 10, 2020, 07:39: HS waterlines opened. Vacuum ok @ 4.12e-07T.

Monday, February 10, 2020, 07:41: Power / sources on.

Monday, February 10, 2020, 07:43: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

Monday, February 10, 2020, 13:01: Heating appears ok. No voltage abnormalities or short.

Monday, February 10, 2020, 13:02: Auto-Cooling @ 1 A per min.


Tuesday, February 11, 2020, 06:39: Power / Sources off.

Tuesday, February 11, 2020, 06:40: Waterlines purged. Nitrogen bottle @ 2100 PSI approx.

Tuesday, February 11, 2020, 06:42: IG1 off. Turbo pumps off.

Tuesday, February 11, 2020, 09:59: Venting.

 

Entry  Wednesday, February 12, 2020, 11:04, Aaron Schmidt, , LP-SIS, , , 41790-9, 43515-1, In progress, Conditioning HS UC#31.docx

Using a broken LP-FEBIAD oven for out gassing. Tentative UC#31*

Wednesday, February 12, 2020, 10:57: Roughing.

Wednesday, February 12, 2020, 11:30: Turbo pumps on.


Thursday, February 13, 2020, 07:19: Waterlines opened. Vacuum ok @ 6.91e-07T.

Thursday, February 13, 2020, 07:22: Power / Sources on. TGHT only.

Thursday, February 13, 2020, 07:25: Auto-ramping TGHT @ 2A per min to 580 A.


Friday, February 14, 2020, 14:03: Auto-cooling @ 1 A per min.


Thursday, February 20, 2020, 07:33: PS, sources off, locked out.

Thursday, February 20, 2020, 07:34: Turbo pumps & IG1 off.

Thursday, February 20, 2020, 07:35: Waterlines purged. Nitrogen Bottle around 2050 PSI.

Thursday, February 20, 2020, 09:22: Venting.

 

Entry  Thursday, February 20, 2020, 11:41, Aaron Schmidt, Ta#60, LP-SIS, , , 44139-13, 43515-5, In progress, Ta#60 w/ EE testing 20200221_134828.jpg20200221_134939.jpgTa#60_-_TS_Pre-condition_-_EE_test_-_1.docx

 Ta#60 (Unconditioned) - Salts in.

Thursday, February 20, 2020, 14:04: Roughing.

Thursday, February 20, 2020, 14:38: Turbo pumps on (Leak check in am).

Thursday, February 20, 2020, 14:43: IG1 on.


Friday, February 21, 2020, 06:36: Waterlines opened. No vacuum response. Vacuum ok @ 8.69e-07T.

Friday, February 21, 2020, 06:38: Turbo pumps off.

EE Thermocouples req'd.

Friday, February 21, 2020, 11:15: Vented.

9-pin removed. Thermocouples installed.

Friday, February 21, 2020, 13:52: Roughing.

Friday, February 21, 2020, 14:24: Turbo pumps on.


EE Waterline - On

Wednesday, February 26, 2020, 07:40: Waterlines re-opened. Vacuum ok. @ 3.51e-07T

Wednesday, February 26, 2020, 07:43: Power / sources on.

Wednesday, February 26, 2020, 07:45: Auto ramping TGHT / TBHT @ 2 A per min to 250 / 150 A.

 TGHT / TBHT Current (A) EE Temp (A - T1 - Upper left)
[C]
EE Temp (B - T4 - Lower right)
[C]
 250 / 150 20.8 24.0
 350 / 200 22.5

29.7

 450 / 230 20.1 30.9
 580 / 230 14.5 28.8
580 / 230 @ 2:52 pm 6.2 21.6

Wednesday, February 26, 2020, 09:52: Auto ramping TGHT / TBHT @ 2 A per min to 350 / 200 A.

Wednesday, February 26, 2020, 11:04: Auto ramping TGHT / TBHT @ 2 A per min to 450 / 230 A.

Wednesday, February 26, 2020, 11:57: Auto ramping TGHT / TBHT @ 2 A per min to 580 / 230 A.

Wednesday, February 26, 2020, 13:03: TGHT / TBHT @ 580 / 230 A.

Wednesday, February 26, 2020, 14:52: Temp check (thermocouple reversed on T1?)

Wednesday, February 26, 2020, 14:54: Auto-cooling @ 2A per min.


Thursday, February 27, 2020, 06:30: Power/sources off, locked out. FS#3 purged. Cage open.

Thursday, February 27, 2020, 07:20: Line K (EE) disconnected from FS#3. Old fitting swapped for new one. See https://elog.triumf.ca/TIS/Test-Stand/786.

No water/cooling running into EE.

Thursday, February 27, 2020, 07:26: All waterlines open. Vacuum ok.

Thursday, February 27, 2020, 07:28: Power / Sources on.

 TGHT / TBHT Current (A) EE Temp (A - T1 - Upper left)
[C]
EE Temp (B - T4 - Lower right)
[C]
0 / 0 22.8 22.9
 50 / 25 22.6 22.7
100 / 50 22.6

22.6

150 / 100 22.2 23.3
200 / 150 22.0 24.9
200 / 150 7am Day 2 21.2 23.9
250 / 200 23.3 29.3
300 / 230 22.4 30.6
350 / 230 19.2 27.7
450 / 230 18.5 29.7
580 / 230 13.4 27.3

Thursday, February 27, 2020, 07:35: Auto ramping TGHT / TBHT @ 2 A per min to 50 / 25 A.

Thursday, February 27, 2020, 08:00: Auto ramping TGHT / TBHT @ 2 A per min to 100 / 50 A.

Thursday, February 27, 2020, 08:56: Auto ramping TGHT / TBHT @ 2 A per min to 150 / 100 A.

Thursday, February 27, 2020, 10:29: Auto ramping TGHT / TBHT @ 2 A per min to 200 / 150 A.


Friday, February 28, 2020, 06:56: Auto ramping TGHT / TBHT @ 2 A per min to 250 / 200 A.

Friday, February 28, 2020, 07:38: Auto ramping TGHT / TBHT @ 2 A per min to 300 / 230 A.

Friday, February 28, 2020, 09:54: Auto ramping TGHT / TBHT @ 2 A per min to 350 / 230 A.

Friday, February 28, 2020, 13:20: Auto ramping TGHT / TBHT @ 2 A per min to 450 / 230 A.

Friday, February 28, 2020, 14:15: Auto ramping TGHT / TBHT @ 2 A per min to 580 / 230 A.

Friday, February 28, 2020, 15:42: Last temperature measurement Taken. TGHT / TBHT @ 580 / 230 A.

Friday, February 28, 2020, 15:44: Auto-cooling @ 2A per min.


Monday, March 02, 2020, 07:37: Power / Sources off. Waterlines purged (A little over 2000 PSI left in the N Bottle)

Monday, March 02, 2020, 07:38: IG1 & Turbo pumps off.

Entry  Monday, March 02, 2020, 14:42, Aaron Schmidt, Ta#60, LP-SIS, , , 44139-13, 43515-5, In progress, Full TS testing w/ HV using Ta#60 

Monday, March 02, 2020, 14:36: Roughing.

Monday, March 02, 2020, 15:08: Turbo pumps on.


Remove HV cage (top). Reroute FS#3 back to cool EE

Tuesday, March 03, 2020, 08:11: Waterlines open. Vacuum ok @ 6.52e-07T.

HV cage top on. Data Logger removed. Wiring grounded.

Tuesday, March 03, 2020, 09:00: Power / sources / HV on.

Tuesday, March 03, 2020, 09:03: Auto-ramping TGHT / TBHT to 300 / 150 A @ 4 A per min.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 25.65 4.38
 TBHT 25.50

6.97

 COIL + EE 25.39 1.06
 TGHT 25.82 5.84

Tuesday, March 03, 2020, 09:08: BIAS / EE / EZL on.

Tuesday, March 03, 2020, 09:11: BIAS / EE / EZL @ 10 / 7.5 / -1 kV.

Tuesday, March 03, 2020, 09:15: BIAS / EE / EZL @ 20 / 12.5 / -1.5 kV. Read back on PS same / ok.

Tuesday, March 03, 2020, 09:17: BIAS / EE / EZL @ 30 / 12.5 / -1.5 kV.

Tuesday, March 03, 2020, 09:18: IV4 Opened.

Tuesday, March 03, 2020, 09:24: Optics on / set.

One spark noted. Reset optics.

Tuesday, March 03, 2020, 11:32: Auto-ramping TGHT / TBHT to 500 / 200 A @ 4 A per min.

One spark noted. Reset optics.

Tuesday, March 03, 2020, 12:47: Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.

FM

Tuesday, March 03, 2020, 18:30: BIAS/EE/EZL @ 0 kV.

Tuesday, March 03, 2020, 18:31: TGHT / TBHT to 400 / 200 A @ 4 A per min.

Nothing observed on the emittance scan regardless of the tune


Wednesday, March 04, 2020, 09:09:  Auto-ramping TGHT / TBHT to 500 / 210 A @ 4 A per min. 

Wednesday, March 04, 2020, 10:47:  Auto-ramping TGHT / TBHT to 580/ 230 A @ 4 A per min. 

*Got busy in the morning, starting later than expected

Wednesday, March 04, 2020, 13:47: BIAS / EE / EZL @ 30 / 12.5 / -1.5 kV.

*Seminar at 2:30 I'll continue later

Wednesday, March 04, 2020, 16:08: Emittance rig troubleshoot (see e-log 778)

Wednesday, March 04, 2020, 19:00: BIAS/EE/EZL @ 0 kV.

Wednesday, March 04, 2020, 19:09: TBHT to 200A to try preserver some salts for tomorrow tests


Friday, March 06, 2020, 17:50: Auto-cooling 4 A/min .


Monday, March 09, 2020, 12:08: IV4 closed

Monday, March 09, 2020, 12:08: IG1 Off.

Monday, March 09, 2020, 12:09: Turbos off

Monday, March 09, 2020, 16:19: Venting

Entry  Wednesday, March 11, 2020, 13:31, Aaron Schmidt, Ta#60, LP-SIS, , , 44139-13, 43515-5, In progress, Ta#60 w/ EE testing - 2 Ta#60_-_TS_Pre-condition_-_EE_Test_-_2.docx

Thermocouples installed on EE. Double checked continuity & used a heat gun.

Wednesday, March 11, 2020, 13:30: Roughing.

Wednesday, March 11, 2020, 15:03: Turbo pumps on, interlocks by-passed (No water at the moment) 

Wednesday, March 11, 2020, 15:10: IG1 on.


Thursday, March 12, 2020, 06:08: Vacuum @ 2.33e-06T. Opening waterlines.

 Thursday, March 12, 2020, 06:11: Waterlines all open. Vacuum Stable @ 2.31e-06T

Thursday, March 12, 2020, 06:13: Bypass on TP1A & B removed.

Thursday, March 12, 2020, 06:18: Power / Sources on TGHT / TBHT @ 0 / 0 A.

Thursday, March 12, 2020, 06:20: Auto-ramping TGHT / TBHT to 250 / 150 A @ 4 A per min.

Thursday, March 12, 2020, 07:34: Auto-ramping TGHT / TBHT to 350 / 200 A @ 4 A per min.

Thursday, March 12, 2020, 08:02: Auto-ramping TGHT / TBHT to 450 / 230 A @ 4 A per min.

Thursday, March 12, 2020, 08:30: Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.

Thursday, March 12, 2020, 08:55: Ramping aborted. TGHT / TBHT @ 488 / 230 A. Vacuum limit reached at 3.30e-06T.

Thursday, March 12, 2020, 08:56: Vacuum limit increased to 5.0e-06T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.

Thursday, March 12, 2020, 09:27: TGHT / TBHT @ 580 / 230 A. Temperatures recorded.

W/ Water cooling on EE

 TGHT / TBHT Current (A) EE Temp (A - T1 - Red/Black wire - 1,2)
[C]
EE Temp (B - T2 - White/Black wire 8,9)
[C]
0 / 0 17.7 17.8
250 / 150 26.4 28.1
350 / 200 34.1

39.0

450 / 230 41.4 48.0
580 / 230 43.1 49.0

Thursday, March 12, 2020, 09:31: Auto-cooling @ 6A per min.

Thursday, March 12, 2020, 11:09: PS off. Lock up. Remove HV cage for FS#3 EE route & water purge.

Thursday, March 12, 2020, 11:27: PS on. Locks off. FS#3 re-routed (K line - EE isolated). Water on. Vacuum ok @ 2.07e-06T

W/O Water cooling on EE

 TGHT / TBHT Current (A) EE Temp (A - T1 - Red/Black wire - 1,2)
[C]
EE Temp (B - T2 - White/Black wire 8,9)
[C]
0 / 0 15.5 15.6
250 / 150 26.6 27.6
350 / 200 35.0

38.9

450 / 230 42.6 48.1
580 / 230 46.3 51.9
580 / 230 @ 2:41 pm 43.3 49.3

Thursday, March 12, 2020, 11:28: Power / Sources on TGHT / TBHT @ 0 / 0 A.

Thursday, March 12, 2020, 11:29: Auto-ramping TGHT / TBHT to 250 / 150 A @ 4 A per min.

Thursday, March 12, 2020, 12:33: Auto-ramping TGHT / TBHT to 350 / 200 A @ 4 A per min.

Thursday, March 12, 2020, 13:02: Auto-ramping TGHT / TBHT to 450 / 230 A @ 4 A per min.

Thursday, March 12, 2020, 13:28: Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.

Thursday, March 12, 2020, 14:11: TGHT / TBHT @ 580 / 230 A. Temperatures recorded.

Thursday, March 12, 2020, 14:41: Auto-cooling @ 4A per min.


Tuesday, March 17, 2020, 05:26: IG1 & turbo pumps off. Water lines closed for FS#3 & HS.

Tuesday, March 17, 2020, 05:31: Waterlines FS#5 & FS#3 purged.

Tuesday, March 17, 2020, 07:08: Venting.

Entry  Tuesday, March 17, 2020, 11:40, Aaron Schmidt, SiC#40, HP-SIS, ITW, TM2, 42218-8, 43515-8, In progress, Conditioning SiC#40 SiC#40_-_Conditioning.docxER-580-230-30kV-m7.txtER-580-230-30kV-m23.txtER-580-230-30kV-m38.txtITW-TM2-SiC#40-HP-SIS_Test_Stand.docx

Tuesday, March 17, 2020, 11:37: Roughing.

FS# 3 re-connected. All waterlines re-opened except FS#5 (HS cooling).

Tuesday, March 17, 2020, 12:08: Turbo pumps on.

Tuesday, March 17, 2020, 12:13: IG1 on.


Wednesday, March 18, 2020, 04:31: Waterlines open. Vacuum ok @ 8.45e-07T.

Wednesday, March 18, 2020, 04:37: HV rack / 9-pin grounded.

Wednesday, March 18, 2020, 04:40: Power / Sources on.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 24.42 4.04
 TBHT 24.39

6.72

 COIL + EE 24.21 1.63
 TGHT  24.30 5.76

Wednesday, March 18, 2020, 04:43: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.

Wednesday, March 18, 2020, 04:51: BIAS / EE / EZL @ 30 / -1.5 / 12.5 kV.

Wednesday, March 18, 2020, 04:52: Optics on / set. IV4 open.

Wednesday, March 18, 2020, 07:45: Fluctuation noticed on BIAS. No audible sparks. Conditioning.

Wednesday, March 18, 2020, 07:47: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

Wednesday, March 18, 2020, 09:44: EZL Increased to 13 kV.

Wednesday, March 18, 2020, 09:51: Reset MB1 manually. Ok.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 25.76 5.00
 TBHT 25.49

7.61

 COIL + EE 25.35 2.04
 TGHT  25.32 6.14

Wednesday, March 18, 2020, 10:57: Mass, wire, & emittance scans complete.


Thursday, March 19, 2020, 11:41: Auto-cooling @ 1 A per min.

Thursday, March 19, 2020, 11:46: BIAS / EE / EZL @ 0 kV.


Monday, March 23, 2020, 05:15: IV4 closed / reset. 

Monday, March 23, 2020, 05:17: Power / sources off.

 

Entry  Wednesday, June 10, 2020, 08:23, Aaron Schmidt, C#1, LP-SIS, ITW, TM2, 43044-8, 43515-3, In progress, Conditioning C#1 7x

Salts: 

Li - 10 uL

Na - 10 uL

K - 5 uL

Rb - 10 uL

Cs - 15 uL

Wednesday, June 10, 2020, 08:55: Roughing.

Wednesday, June 10, 2020, 09:30: Turbo pumps on.

Wednesday, June 10, 2020, 09:35: Ion gauge on.

Wednesday, June 10, 2020, 13:52: HS waterline opened. Vacuum ok @ 4.11e-06T.

Wednesday, June 10, 2020, 13:59: All main PS on. E-rig PS on. Optics on.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 27.21 5.81
 TBHT 27.04

8.83

 COIL + EE 26.93 2.76
 TGHT  27.04 6.58

Wednesday, June 10, 2020, 14:02: Sources on.


Thursday, June 11, 2020, 07:15: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. 

Thursday, June 11, 2020, 07:29: IV4 opened. BIAS / EZL / EE @ 30 / 13 / -1.5 kV. 

Thursday, June 11, 2020, 09:56: BIAS reduced to 20 kV due to sparking / out gassing. MB1 having issues? 

Thursday, June 11, 2020, 14:24: Halted auto ramp due to the vacuum. TGHT @ 500 A. Vacuum @ 7.08e-06T.

Thursday, June 11, 2020, 14:26: TBHT reduced to 200 A. 

Thursday, June 11, 2020, 19:09: Auto-cooling @ 1 A per min. 


Friday, June 12, 2020, 10:43: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min.  


Monday, June 15, 2020, 03:00: Vacuum @ 2.66e-06T. TGHT / TBHT @ 300 / 150 A. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. 

Monday, June 15, 2020, 05:30: Tap up BIAS. BIAS / EZL / EE @ 30 / 13 / -1.5 kV.  TGHT @ 512 A. Vacuum @ 6.11e-06T.

Monday, June 15, 2020, 06:46:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 26.40 7.51
 TBHT 26.08

10.15

 COIL + EE 25.88 3.53
 TGHT  26.06 7.31

Mass scans complete w/ TGHT / TBHT @ 512 / 230 A. 30 kV.

Mass, wire, & emittance scans taken on: M7, M23, M38, M86, M125.

Monday, June 15, 2020, 09:52: Auto-cooling @ 1 A per min.

Monday, June 15, 2020, 21:23: BIAS / EE / EZL @ 0 kV. 


Tuesday, June 16, 2020, 06:57: IV4 closed & reset.

Tuesday, June 16, 2020, 07:00: Sources / Power off. IG1 off. Turbo pumps off.

Tuesday, June 16, 2020, 08:06: Waterlines purged. N bottle @ 1450 PSI. Venting.

Entry  Tuesday, June 16, 2020, 11:03, Aaron Schmidt, Ta#60, LP-SIS, ITW, TM2, 44139-13, 43515-5, In progress, Conditioning Ta#60  Ta#60_Conditioning.docxITW-TM2-Ta#60-LP-SIS_Test_Stand.docxER-580-230-30kV-m8.txtER-580-230-30kV-m40.txt

Tuesday, June 16, 2020, 11:01: Turbo pumps on.


Wednesday, June 17, 2020, 07:49: HS waterlines opened. Vacuum stable @ 2.07e-06T.

Wednesday, June 17, 2020, 07:51: Power / Sources on.

Wednesday, June 17, 2020, 07:52: Opened IV4.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 27.89 6.17
 TBHT 27.73

8.71

 COIL + EE 27.66 2.82
 TGHT  27.74 6.68

Wednesday, June 17, 2020, 07:55: Auto-ramping TGHT / TBHT to 300 / 100 A @ 4 A per min. Optics on.

Wednesday, June 17, 2020, 08:03: BIAS / EE / EZL @ 30 /  -1.5 / 13 kV.

Wednesday, June 17, 2020, 09:43: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

12:50 Approx TRIP*. Vacuum spike?

Wednesday, June 17, 2020, 13:10: Sources back on. Auto-ramping TGHT / TBHT to 450 / 150 A @ 4 A per min. Optics switched back on.

Wednesday, June 17, 2020, 13:42: BIAS / EE / EZL @ 30 /  -1.5 / 13 kV.

Wednesday, June 17, 2020, 15:25: Auto-ramping TGHT / TBHT to 500 / 230 A @ 4 A per min.

Wednesday, June 17, 2020, 15:48: Auto-ramping TGHT / TBHT to 525 / 230 A @ 4 A per min.

Wednesday, June 17, 2020, 16:14: Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.

Wednesday, June 17, 2020, 17:03: Scans complete

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.28 8.11
 TBHT 27.92

10.78

 COIL + EE 27.75 3.76
 TGHT  27.92 7.57

Wednesday, June 17, 2020, 17:09: TGHT brought down to 550 A. BIAS /  EE / EZL @ 0 kV.

Wednesday, June 17, 2020, 17:10: IV4 closed

Wednesday, June 17, 2020, 17:13: TBHT to 200 A.

Wednesday, June 17, 2020, 22:25: TSG:CG1A & TSG:CG1B leveling off. Reducing ~ On the strip tool. 


Thursday, June 18, 2020, 05:32: From 550 A / 200 A. Vacuum @ 5.63e-06T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 1 A per min. Max loop reached (5.500e-06T). Allow to out gas.


Sunday, June 21, 2020, 11:07: Auto-cooling @ 0.5 A per min. vacuum @ 4.29e-06T. 


Monday, June 22, 2020, 04:51: Auto-cooling @ 4 A per min. vacuum @ 1.49e-06T. 

Monday, June 22, 2020, 05:10: Sources / power off.

Monday, June 22, 2020, 05:13: Ion gauge & Turbo pumps off.

Monday, June 22, 2020, 06:46: Venting. HS waterline purged.

Entry  Monday, June 22, 2020, 07:07, Aaron Schmidt, Test FEBIAD, HP-FEBIAD, , , 38295-8, 42752-5, In progress, Test FEBIAD (Fernando) FEBIAD_Testing_-_June_22_-_23.docxER-580-280-30kV-m28.txt

Reminder. Mini pump still linked to SV1. DO NOT OPEN SV2!!!

Monday, June 22, 2020, 08:45: Roughing.

Monday, June 22, 2020, 09:17: Turbo pumps on.

Monday, June 22, 2020, 09:22: Ion gauge on.


Tuesday, June 23, 2020, 07:37: Waterlines opened. Vacuum ok @ 1.60e-06T. Power / Sources on.

Tuesday, June 23, 2020, 07:45: Turned on "mini-pump" Open SV1.

Tuesday, June 23, 2020, 08:01: Open SV3 & SV4. (NOTE* Do not Open SV2).

Tuesday, June 23, 2020, 08:14: Close SV1. Turn off "Mini pump". Slowly open and close SV5. Unplug mini-pump.

Open w/ SV3 & SV4.

Tuesday, June 23, 2020, 08:16: SV5 left open w/ SV3 & SV4. Vacuum Stabilizing @ 2.32e-06T & dropping.

Tuesday, June 23, 2020, 08:20: Auto-ramping TGHT / TBHT to 300 / 150 A @ 4 A per min. Coil @ 20 A. IV4 open

Tuesday, June 23, 2020, 08:28: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Anode @ 50 V.

Tuesday, June 23, 2020, 08:29: Optics on.

Tuesday, June 23, 2020, 09:59: Auto-ramping TGHT / TBHT to 580 / 270 A @ 2 A per min.

Tuesday, June 23, 2020, 12:59: Coil @ 50 A. Anode @ 100 vV. Vacuum @ 3.71e-06T

Tuesday, June 23, 2020, 13:10: Auto-ramping TBHT to 280 A @ 2 A per min.

Tuesday, June 23, 2020, 13:36: Mass, wire, & Emittance scans taken.

 

 

 

Entry  Monday, July 20, 2020, 11:40, Aaron Schmidt, (Empty-Test), , , , 44160-1, 43822-2, In progress, Conditioning Test P2N P2N_-_1_-_July-20-22-2020.docx

Salts added: 

Cs - 15 uL

Li - 10 uL

Na - 10 uL

Rb - 10 uL

K - 5 uL

Empty target in use. Mirror installed inside to look at the target through the top cooling opening.

Monday, July 20, 2020, 14:36: Roughing. Assistance req'd to close the doors.

Monday, July 20, 2020, 15:12: Turbo pumps on.

Monday, July 20, 2020, 15:17: Ion gauge on.

Monday, July 20, 2020, 15:26: TP1A tripped.

Monday, July 20, 2020, 16:00: Continued backing trips. Await pump down.

Monday, July 20, 2020, 16:29: Attempt Bypass.

Monday, July 20, 2020, 16:32: Trip on TMS:TP2? Odd. Restarted quick.

Monday, July 20, 2020, 16:34: TSG:TP1A & TSG:TP1B up to speed. Ion gauge on. Pumping down.


See: https://elog.triumf.ca/TIS/Test-Stand/802 for wiring spec. TGHT / TBHT (on coil) connected.

Tuesday, July 21, 2020, 07:16: Water lines Opened. No response on vacuum. Ok @ 2.13e-06T. 

Tuesday, July 21, 2020, 08:27: Ion gauge & Turbo pumps off. One more target / electrical check is required.

Tuesday, July 21, 2020, 09:50: Venting.

Tuesday, July 21, 2020, 10:19

Extech measurements (µOhm):

TGHT Left leg Ta-Cu: 205, 215, 212, 201.

TGHT Right leg Ta-Cu: 287, 295, 275, 292.

TGHT Ta legs: 596, 606, 597, 598.

TBHT A: 1470, 1471.

TBHT B: 1469, 1469.

Tuesday, July 21, 2020, 10:36: Roughing.

Tuesday, July 21, 2020, 13:06: Turbo pumps on.

Tuesday, July 21, 2020, 13:16: Ion gauge on.

Tuesday, July 21, 2020, 13:40: Lockout / power / sources on.


Wednesday, July 22, 2020, 09:28: Auto-ramping TGHT / TBHT to 100 / 100 A @ 4 A per min.

Wednesday, July 22, 2020, 09:54: Auto-ramping TGHT / TBHT to 200 / 200 A @ 4 A per min.

Wednesday, July 22, 2020, 10:30: Visual note @ 200 A. No glow noted on target or the legs. Auto-ramping TGHT / TBHT to 300 / 300 A @ 4 A per min.

Wednesday, July 22, 2020, 10:57: Visual note @ 300 A. The target is glowing & reflecting the glow on the legs. The glow is even. Vacuum @ 2.95e-06T (Allow to stabilize).

Wednesday, July 22, 2020, 11:05: Vacuum @ 2.24e-06T. Auto-ramping TGHT / TBHT to 400 / 400 A @ 4 A per min.

Wednesday, July 22, 2020, 11:26: Auto-ramp aborted. TGHT heating OK. TBHT moving off?

TGHT: "Set" to 384 A = 383.6 A

TBHT: "Set" to 384 A = 318.2 A

Wednesday, July 22, 2020, 11:34: Manually tap down by 10 A. TBHT increases as TGHT decreases.

TGHT: "Set" to 374 A = 373.6 A

TBHT: "Set" to 374 A = 325.4 A

Wednesday, July 22, 2020, 11:35: Manually tap down TGHT only by 10 A. TBHT increases as TGHT decreases.

TGHT: "Set" to 364 A = 363.4 A

TBHT: "Set" to 374 A = 331.3 A

Wednesday, July 22, 2020, 11:37: Manually tap down TBHT only by 10 A. No change.

TGHT: "Set" to 364 A = 363.4 A

TBHT: "Set" to 364 A = 331.4 A

Wednesday, July 22, 2020, 11:39: Manually tap down TGHT down to 350 A. TBHT increases as TGHT decreases.

TGHT: "Set" to 350 A = 349.5 A

TBHT: "Set" to 364 A = 339.0 A

Wednesday, July 22, 2020, 11:40: Tap down to TGHT & TBHT to 340 A.

Wednesday, July 22, 2020, 11:43: Adjust TBHT Voltage limit from 3.001 to 4.001 V.

Wednesday, July 22, 2020, 11:44: Manually tap up both TGHT &TBHT to 350 A.

TGHT: "Set" to 350 A = 349.5 A

TBHT: "Set" to 350 A = 348.9 A

Wednesday, July 22, 2020, 11:45: Auto-ramping TGHT / TBHT to 400 / 400 A @ 4 A per min.

Wednesday, July 22, 2020, 12:43: Auto-ramping TGHT / TBHT to 500 / 500 A @ 4 A per min.

Wednesday, July 22, 2020, 12:59: Adjust TBHT voltage limit from 4.001 to 6.001 V

Wednesday, July 22, 2020, 13:11: Visual note @ 500 A. The target  is glowing bright. Vacuum @ 2.51e-06T

Auto-ramping TGHT / TBHT to 550 / 550 A @ 4 A per min.

Wednesday, July 22, 2020, 13:25: TGHT / TBHT @ 550 A. Vacuum @ 2.74e-06T

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 27.59 8.17
 TBHT 27.37

11.06

 COIL + EE 27.18 3.78
 TGHT  27.32 7.65

 Wednesday, July 22, 2020, 13:27: Auto-ramping TGHT / TBHT to 600 / 600 A @ 4 A per min.

Wednesday, July 22, 2020, 13:41: TGHT / TBHT @ 600 A. Vacuum @ 3.23e-06T

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 27.69 8.61
 TBHT 27.44

11.30

 COIL + EE 27.28 3.97
 TGHT  27.43 7.91

Target visual. Center hot / Legs Ok. Bright. Use welding glasses to view. 

Entry  Wednesday, July 22, 2020, 08:56, Luca Egoriti, P2N test, HP-SIS, ITE, TM4, , , In progress, p2n heating test - electrical feedthrough configuration ISACteststand_TMwiring.pptxP2N-TestStand_20200722.pngP2N-TestStand_1200A.png

 The electrical feedthroughs at the top of the test stand module were reconfigured to deliver up to 1200A to the p2n target.

1) The two COIL lines (one + and one -) were disconnected from their terminals E and F

2) The TBHT terminals (two + and two -) were disconnected from A and B

3) The two TBHT positive terminals are connected to E and G respectively. The two TBHT negative terminals are both connected to F, and a 4/0 cable is run from F to H

4) The three TGHT + terminals are left connected to D. The three TGHT - terminals are left connected to C

In the vacuum chamber, COIL and TGHT terminals of the same polarity are shorted by means of thick copper bars specifically machined to match the test stand terminals geometry. The test can proceed by ramping both TGHT and TBHT up to 600 A each, possible at the same time and speed.

The wiring diagram is shown in the attached picture 

 

Extech measurements before heating (µOhm):

TGHT Left leg Ta-Cu: 205, 215, 212, 201.

TGHT Right leg Ta-Cu: 287, 295, 275, 292.

TGHT Ta legs: 596, 606, 597, 598.

TBHT A: 1470, 1471.

TBHT B: 1469, 1469.

 

Wednesday, July 22, 2020, 16:21

Rampup finished around 2PM, looks good. Around 300+300A the TBHT voltage limit prevented the TBHT current to increase, and instead it decreased. Aaron ramped it down, adjusted the voltage limit and proceeded without issues.

The water flow and temperatures looked fine.

Attached the plots and a picture at 1200A

 

 Thursday, July 23, 2020, 11:53

Frank Song checked for us the status of the test stand. Pictures looked good, despite the reflections, I can't see sign of the flexy legs glowing. Thank you Frank!

The voltage on the TGHT has dropped 0.02 V, and the voltage on the TBHT (COIL lines) has dropped by 0.04V in 20 hours. I think it's negligible, just a sign of some sintering.

The cooling parameters are as follows:

Input 1: 28.05 C

Input 2: 8.49 lpm

Input 3: 27.79 C

Input 4: 11.14 lpm

Input 5: 27.72 C

Input 6: 3.90 lpm

Input 7: 27.78 C

Input 8: 7.79 lpm

 

Friday, July 24, 2020, 16:42

This morning I saw the target for my first time and not in a picture. I could see a mild glow in the center of both flexy legs, while the external foils seemed cold. This seems really good, as expected!

Water parameters were checked:

Input 1: 27.75 C

Input 2: 8.38 lpm

Input 3: 27.52 C

Input 4: 11.13 lpm

Input 5: 27.37 C

Input 6: 3.93 lpm

Input 7: 27.53 C

Input 8: 7.78 lpm 

 

 

Monday, July 27, 2020, 09:35

Aaron's measurement from today at 7:30am

 Input 1: 26.61 C

Input 2:  8.25 lpm

Input 3: 26.35 C

Input 4: 11.19 lpm

Input 5: 26.21 C

Input 6: 3.84 lpm

Input 7: 26.35 C

Input 8: 7.76 lpm


FM

Thursday, July 30, 2020, 15:53: Auto-cooling TGHT/TBHT to 0 @ 4 A/min 

 

 

Thursday, July 30, 2020, 23:02

Ramp down terminated around 7pm, the current was ramped smoothly but the voltage from both PS (TGHT and TBHT) had some bumps in correspondance with vacuum response. Maybe something was shorting? A thorough inspection of the heat shield and target might tell more.

Thanks Fernando for ramping down! 


Tuesday, August 04, 2020, 07:33: PS / sources off. Lock out. IG & Turbo pumps off. Purge waterlines. - AS

 

Tuesday, August 04, 2020, 09:32

Started rewiring the test stand.

TBHT+ (A1 and A2): connected to A

TBHT- (B1 and B2): connected to B

COIL+ (A3): connected to E

COIL-(B3): connected to F

4/0 short connection from F to H removed

 

Tuesday, August 04, 2020, 15:27

Extech measurements after heating (µOhm):

TGHT Left leg Ta-Cu: 160, 176, 184, 180

TGHT Right leg Ta-Cu: 49, 48, 52, 53.

TGHT Ta legs: 470, 469, 463, 480.

TBHT A: 2400, 2229,2492.

TBHT B: 2361, 2411, 2412.

Entry  Tuesday, August 04, 2020, 15:07, Aaron Schmidt, UCx, LP-SIS, , , 44139-10, 43515-4, In progress, UCx HS conditioning with PEEK assembly UCx_-_HS_w-PEEK_Assy_-_43515-4.docx

 Tuesday, August 04, 2020, 15:04: Roughing.


Wednesday, August 05, 2020, 06:08: Turbo pumps on. 


Thursday, August 06, 2020, 06:58: Vacuum @ 1.52e-06T

Thursday, August 06, 2020, 07:01: Waterlines opened. Vacuum ok @ 1.52e-06T

Thursday, August 06, 2020, 07:03: Power / Sources on.

Thursday, August 06, 2020, 07:05: Auto-ramping TGHT / TBHT to 300 / 150 A @ 4A per min.

Thursday, August 06, 2020, 07:13: Adjust TBHT Voltage limit back to 3.001 V.

Thursday, August 06, 2020, 07:52: IV4 opened. HV PS on.

Thursday, August 06, 2020, 07:53: Optics up to FC0 on.

Thursday, August 06, 2020, 08:03: BIAS /  EE / EZL @ 30 / -1.5 / 13 kV.

Thursday, August 06, 2020, 08:27: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min.

Thursday, August 06, 2020, 11:17: BIAS /  EE / EZL @ 40 / -2.0 / 17 kV.

(monitor) Next set below

Thursday, August 06, 2020, 12:00: BIAS / EE / EZL @ 45 / 2.25 / 20.

Thursday, August 06, 2020, 12:17: BIAS / EE / EZL @ 50 / 2.5 / 22. Sparks on EE (K) cap sprak gap?

Thursday, August 06, 2020, 12:31: While tapping up the HV , (52 kV approx) , the system tripped due to a large spark around 12:25 pm. Reset req'd

Thursday, August 06, 2020, 12:33: Auto-ramping TGHT / TBHT to 580 / 230 A @ 6A per min.

Thursday, August 06, 2020, 12:43: BIAS /  EE / EZL @ 30 / -1.5 / 13 kV.

Thursday, August 06, 2020, 13:24: Halt auto ramp. Odd behaviour on TBHT CUR/VOL & TGHT VOL.

Thursday, August 06, 2020, 13:27: Warped. Visual short on TBHT. Auto-cool @ 4 A per min.

Thursday, August 06, 2020, 13:32: HV off. IV4 closed.


Tuesday, August 11, 2020, 07:02: Power/sources off.

Tuesday, August 11, 2020, 07:06: Ion gauge IG1, Turbo pumps off.

 

Entry  Tuesday, August 11, 2020, 12:04, Aaron Schmidt, UCx, LP-SIS, , , 44139-10, 43515-4, In progress, UCx HS conditioning with PEEK assembly 

HS target leg openings were milled. Short from previous test by the look of it. TBHT insulator on source side is cracked.

Wiring up top adjusted for better clearance. EE (K) Cap appears ok.

Tuesday, August 11, 2020, 12:03: Roughing.

Tuesday, August 11, 2020, 12:43: Turbo pumps on.

Tuesday, August 11, 2020, 12:50: Ion gauge on.


Wednesday, August 12, 2020, 06:47: Waterlines opened. Vacuum stable @ 1.76e-06T.

Wednesday, August 12, 2020, 06:51: Power / Sources / Optics on (Half to FC0).

Wednesday, August 12, 2020, 06:53: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.

Wednesday, August 12, 2020, 06:54: IV4 opened.

Wednesday, August 12, 2020, 11:36: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

Wednesday, August 12, 2020, 14:10: TGHT / TBHT voltages ok.

Wednesday, August 12, 2020, 14:23: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Wednesday, August 12, 2020, 15:00: BIAS / EE / EZL @ 35 / -1.7 / 15 kV. 

Wednesday, August 12, 2020, 15:06: BIAS /  EE / EZL @ 40 / -2.0 / 17 kV. Spark* audible.

reset steering & IG6.

Wednesday, August 12, 2020, 15:08: Spark*

Wednesday, August 12, 2020, 15:17: BIAS / EE / EZL @ 45 / 2.25 / 20. spark*

Sparks* Reset IV4, TP6, steering & IG6.

Wednesday, August 12, 2020, 15:20: BIAS /  EE / EZL @ 40 / -2.0 / 17 kV.

Wednesday, August 12, 2020, 15:24: Optics Q1 not resetting.

Wednesday, August 12, 2020, 15:29: HV to 0 kv


Thursday, August 13, 2020, 07:32: TPS:Q1 has not revived on the V+ setting. Comes back on V-. Multiple attempts to engage the PS, turning it off & on. Leaving it in "ON" status but 0V.

Thursday, August 13, 2020, 07:45: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Thursday, August 13, 2020, 08:27: Sparks* 3 audible, almost back to back. only TPS:Q1 affected. V- jumped from 0V to 1500V on it's own. Reset to 0V.

Thursday, August 13, 2020, 08:54: BIAS / EE / EZL @ 35 / -1.7 / 16 kV. Increased EZL V to stabilize it on the strip tool.

Thursday, August 13, 2020, 10:56: Reset IG6. Spark affected.

Thursday, August 13, 2020, 11:05: Audible spark* in behind TS?

Thursday, August 13, 2020, 11:06: TPS:Q1 affected. V- jumped from 0V to 1500V on it's own. Reset to 0V.

Thursday, August 13, 2020, 11:12: BIAS /  EE / EZL @ 40 / -2.0 / 20 kV.

Thursday, August 13, 2020, 11:21: Spark* Charged up both TSG:CBC to 2500 V. Reset to 500 V.

Thursday, August 13, 2020, 13:50: BIAS / EE / EZL @ 45 / -2.2 / 21 kV.

Thursday, August 13, 2020, 14:11: Spark* Minor.

Thursday, August 13, 2020, 14:15: BIAS / EE / EZL @ 50 / -2.5 / 22.5 kV.

Thursday, August 13, 2020, 14:18: Spark. Knocked out IV4, TP6, & optics. Reset. Oh and would you look at that TPS:Q1 works now. Set to 790 V.

Thursday, August 13, 2020, 14:21: Spark*

Thursday, August 13, 2020, 14:24: Spark* but not audible. They're decreasing in size.

Thursday, August 13, 2020, 14:31: Audible spark*. Reset TSG:CBC & TPS:Q1

Thursday, August 13, 2020, 15:01: Observed the spark in the spark gap EE (K).

Thursday, August 13, 2020, 15:19: BIAS / EE / EZL to 0 kV. HV off. Optics off.


Monday, August 17, 2020, 10:57: Begin slow auto-cooling @ -0.75 A per min. 

 

Entry  Tuesday, August 18, 2020, 12:07, Aaron Schmidt, Test FEBIAD, HP-FEBIAD, , , 38295-8, 42752-5, In progress, RP check & Mass magnet check. 

Tuesday, August 18, 2020, 12:05: RP1 on

Tuesday, August 18, 2020, 12:10: RP1 off

Install Gas Ballast vapour port w/ filter.

Tuesday, August 18, 2020, 13:19: RP1 on

Disengage shipping locks*

Tuesday, August 18, 2020, 13:55: Turbo pumps on.

Tuesday, August 18, 2020, 14:02: TP1 A trip. TSG:CG1A pressure issue. Remove filter port on Gas ballast. Add blank.

TSG:CG1A pressure improving.

Tuesday, August 18, 2020, 14:37: TP1 A trip. TSG:CG1A pressure issue.

Tuesday, August 18, 2020, 14:48: Bypass BV1A. Switch on TP1 A.

Tuesday, August 18, 2020, 14:55: No trips* Bypass to remain until CG1A below 0.050T.

Tuesday, August 18, 2020, 21:58: Bypass removed. CG1A @ 0.041T.

 

 

Entry  Thursday, September 03, 2020, 11:28, Aaron Schmidt, -, HP-FEBIAD, , , 38295-8, 42752-5, In progress, Leak check 2.0 

Out Gas & MB1 check (Or leak check 2.0)

Ref: https://elog.triumf.ca/TIS/Test-Stand/809 - Leak Checks

Ref: https://elog.triumf.ca/TIS/Test-Stand/803 - Fault

WP I2020-08-19-1 For MB1 work

Thursday, September 03, 2020, 11:23: Vacuum remains stable @ 1.03e-06T.. PS on. Auto-ramp TGHT / TBHT to 350 / 150 A @ 2 A per min.

Thursday, September 03, 2020, 13:06: TS Tripped. Vacuum Spikes again. Appears the water leak is still ongoing.

Thursday, September 03, 2020, 13:49 Waterlines are all close. Vacuum becoming more stable.


Tuesday, September 08, 2020, 07:40: Ion Gauge & turbo pumps off.


Wednesday, September 09, 2020, 06:13: Venting.  


FS#2 - R TGHT (C) feed through and section had been removed and re-souldered both on the water block and the feed through.

Tuesday, September 15, 2020, 09:47:  Roughing.

Tuesday, September 15, 2020, 10:47: TP1B on.

Tuesday, September 15, 2020, 14:35 :TP1A on.

Tuesday, September 15, 2020, 14:42 : IG1 on.


Wednesday, September 16, 2020, 07:44: Vacuum @ 6.00e-06T.

Wednesday, September 16, 2020, 07:47: FS#2 waterline opened. Vacuum stable @ 6.00e-06T.

Wednesday, September 16, 2020, 08:02: Vacuum @ 5.97e-06T. Vacuum stable.

Wednesday, September 16, 2020, 08:03: FS#3 open. Vacuum stable.

Wednesday, September 16, 2020, 08:09: FS#4 open. Vacuum stable.

Wednesday, September 16, 2020, 08:24: FS#5 open. Vacuum stable @ 5.91e-06T.

No vacuum spikes noted.

Wednesday, September 16, 2020, 08:42: PS on. Note: Once Vacuum reaches 3.5e-06T, begin auto-ramping.

Wednesday, September 16, 2020, 09:25: It appears the leak is still here. But very subtle. Vacuum @ 6.18e-06T. Many curse words uttered. PS off. Locked out. Purge waterlines.


Thursday, September 17, 2020, 08:21: Vacuum @ 3.32e-06T.

Thursday, September 17, 2020, 08:23: Opened FS#5.

Thursday, September 17, 2020, 08:55: Opened FS#4. Vacuum @ 3.12e-06T.

Thursday, September 17, 2020, 09:51: Opened FS#3. Vacuum @ 3.12e-06T

Thursday, September 17, 2020, 10:21: Opened FS#2 Vacuum @ 3.12e-06T.

Thursday, September 17, 2020, 10:52: Gradual climb on IG1. Vacuum @ 4.44e-06T.

Thursday, September 17, 2020, 10:53: IG1 & turbo pumps off. Purge water from FS#2.

Thursday, September 17, 2020, 11:37: Venting.

Checked: Upper line & Lower line independently. No obvious leak detected. Checked O-rings. Replaced w/ C-Seals.

Thursday, September 17, 2020, 13:31: Roughing.

Thursday, September 17, 2020, 14:06: TP1B on. 

Thursday, September 17, 2020, 19:11: TP1A on. 


Friday, September 18, 2020, 12:07: FS#2 opened. Vacuum @ 2.48e-06T 

Friday, September 18, 2020, 12:12: FS#2 Closed. Vacuum spiked to near 6.0e-05T. 

Friday, September 18, 2020, 12:15: FS#2 fully purged. 


Tuesday, September 22, 2020, 06:51: Ion gauge & Turbo pumps off. 

Tuesday, September 22, 2020, 08:10: Venting.

O-rings swapped for fresh new ones w/ vacuum grease on (C) & (D) water blocks.

Tuesday, September 22, 2020, 09:27: Roughing.

Tuesday, September 22, 2020, 10:10: TP1B on. 

Tuesday, September 22, 2020, 12:20: TP1A on. 

Tuesday, September 22, 2020, 15:02: Vacuum @ 2.97e-06T.

Tuesday, September 22, 2020, 15:05: Opened FS#2. No immediate response.

Tuesday, September 22, 2020, 15:13: Gradual vacuum spike to 2.6e-06T. Closed FS#2


Wednesday, September 23, 2020, 06:36: Ion gauge & turbo pumps off. 

Wednesday, September 23, 2020, 11:38: TP1B on only. IG1 on.

Wednesday, September 23, 2020, 15:37: LD:  0.0e-09 atm-cc/sec. Vacuum @3.9e-06T.

Wednesday, September 23, 2020, 15:38: Open valve to TP1B.

Wednesday, September 23, 2020, 15:41:

LD: 0.0e-09 atm-cc/sec. Vacuum @3.67e-06T.

Wednesday, September 23, 2020, 15:51: LD: 0.0e-09 atm-cc/sec. Vacuum @3.67e-06T. No response on LD.

Wednesday, September 23, 2020, 15:57: 70 PSI of He on line (C) TGHT Right side. LD: 0.0e-09 atm-cc/sec. Vacuum @3.73e-06T. Flush line

Wednesday, September 23, 2020, 15:59: LD: 1.7e-09 atm-cc/sec. & Rising.

Wednesday, September 23, 2020, 16:00: LD: 4.1e-09 atm-cc/sec & rising. Line (C) confirmed again.

Wednesday, September 23, 2020, 16:04: LD & He disconnected. IG1 & TP1B off. Remove (C) Right TGHT line in the morning. Will aim to replace the source tray side. Feed through side has already been done.


Thursday, September 24, 2020, 07:16: Venting. 

Remove FEBIAD & Source tray side R-TGHT line (C) from FS#2. Blank off with blind double block.

Thursday, September 24, 2020, 08:41: Roughing

Thursday, September 24, 2020, 09:12: TP1B on.

Thursday, September 24, 2020, 09:18: Ion gauge on.

Thursday, September 24, 2020, 10:17: TP1A on. 

Thursday, September 24, 2020, 14:20: Connect LD & Set-up He. Vacuum @ 2.92e-06T. LD: 0.0e-09 atm-cc/sec.

Thursday, September 24, 2020, 14:22: Open valve to TP1B.

Thursday, September 24, 2020, 14:24: Vacuum @ 2.95e-06T. LD: 2.2e-08 atm-cc/sec. 70 PSI of He on line (C) TGHT Return side.

Thursday, September 24, 2020, 14:30: Vacuum @ 2.74e-06T. LD: 1.5e-08 atm-cc/sec.

Minimal change.


 Tuesday, September 29, 2020, 04:50: IG1 off. Turbo pumps off.

Entry  Wednesday, September 30, 2020, 06:23, Aaron Schmidt, C#2, LP-SIS, ITW, TM2, 44139-9, 43515-2, In progress, Conditioning C#2 C#2_-_Short_-_EZL.docxC#2_Conditioning.docxITW-TM2-C#2-LP-SIS_Test_Stand.docx

Wednesday, September 30, 2020, 06:14: Power / sources on.

Wednesday, September 30, 2020, 06:17: Auto-ramping TGHT / TBHT to 300 / 150 A @ 3 A per min.

Wednesday, September 30, 2020, 06:22: Optics set (minus MB1).

Wednesday, September 30, 2020, 07:11: Pair of gradual vacuum spikes noticed. Up to 3.5e-06T & 2.6e-06T, then back down to 2.3e-06T.

Wednesday, September 30, 2020, 07:59: Auto-ramping TGHT / TBHT to 450 / 200 A @ 3 A per min.

Wednesday, September 30, 2020, 08:04: Abort auto-ramping. BIAS @ 10 kV. EZL Appears to have a short. EE up to -1.5 kV ok.

Wednesday, September 30, 2020, 08:11: BIAS back to 0 kV. Auto cooling @ 4A per min.

Wednesday, September 30, 2020, 09:21: Tap down TGHT to 0 from 40 A.

Wednesday, September 30, 2020, 09:22: Power/sources off.

Wednesday, September 30, 2020, 09:23: IG1 & Turbo pumps off.

Wednesday, September 30, 2020, 10:48: Venting.

Wednesday, September 30, 2020, 11:31: Wire found touching on EZL to chamber. Bypassed interlocks. EZL on. 200 V ok 500 V ok. Back to 0V.

Wednesday, September 30, 2020, 11:33: Bypasses removed.

Wednesday, September 30, 2020, 11:37: Roughing.

Wednesday, September 30, 2020, 12:22: Turbo pumps on. 

Wednesday, September 30, 2020, 16:41: TGHT / TBHT to 10 / 10 A manually. BIAS / EE / EZL @ 1 / 0.1 / 1 kV. No shorts. Vacuum @ 2.60e-06T.  

Wednesday, September 30, 2020, 16:47: HV & Heaters tapped back to 0 A & 0 kV. 


Thursday, October 01, 2020, 05:27: Auto-ramping TGHT / TBHT to 150 / 75 A @ 3 A per min.

Thursday, October 01, 2020, 07:04: Auto-ramping TGHT / TBHT to 300 / 150 A @ 3 A per min. 

Thursday, October 01, 2020, 07:29: Optics on. (MB1 Still interlocked but connected now)

Thursday, October 01, 2020, 07:38: BIAS / EE / EZL @ 30 / -1.5 / 13 kV

Thursday, October 01, 2020, 07:39: IV4 open.

Thursday, October 01, 2020, 07:55: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

Thursday, October 01, 2020, 08:34: Voltage drops on BIAS. Auto ramping halted.

Thursday, October 01, 2020, 08:37: BIAS / EE / EZL @ 15 / -1.0 / 8.5 kV.

Thursday, October 01, 2020, 10:04: Auto-ramping TGHT / TBHT to 450 / 230 A @ 1 A per min.

Thursday, October 01, 2020, 11:13: Auto-ramping TGHT / TBHT to 580 / 230 A @ 1 A per min.

Thursday, October 01, 2020, 14:31: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. BIAS instability ongoing. although less than before. Initial RPM0A & RPM0B wire scans ok. MB1 Still interlocked.

Thursday, October 01, 2020, 14:42: BIAS current limit increased to 0.150 mA

Thursday, October 01, 2020, 16:24: BIAS / EE / EZL @ 20 / -1.5 / 6.5 kV.


Friday, October 02, 2020, 09:55: BIAS / EE / EZL @ 25 / -1.5 / 10 kV.

Friday, October 02, 2020, 10:43: Spark* Tripped Optics, IV4 & TP1A. Optics reset. Trouble on IV4 & TP1A

Friday, October 02, 2020, 10:58: IV4 reset. TP1A not back yet. 

Friday, October 02, 2020, 11:22: TP1A reset and on. 

Friday, October 02, 2020, 12:19: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Friday, October 02, 2020, 13:58: HV to 0 kV 

Friday, October 02, 2020, 14:00: Auto-Cooling @ 1 A per min.


Tuesday, October 13, 2020, 08:07: Power / sources off. HS Waterlines purged.

Tuesday, October 13, 2020, 08:09: IG1 off. Turbo pumps off.

Tuesday, October 13, 2020, 10:31: Venting. 

Entry  Tuesday, October 13, 2020, 12:34, Aaron Schmidt, , HP-FEBIAD, , , 38295-8, 42752-5, In progress, MB1 Check. MB1_Check_Oct_-_2020.docx

He & Ar calibrated leak bottles in.

Tuesday, October 13, 2020, 12:33: Roughing.

Tuesday, October 13, 2020, 13:17: TP1B on.

Tuesday, October 13, 2020, 14:19: TP1A on. 

Tuesday, October 13, 2020, 15:44: Waterlines opened. Vacuum @ 9.58e-06T & dropping. Power on.

Tuesday, October 13, 2020, 15:49: Valve to Mini-pump was open & the pump happened to already be switched on.

Tuesday, October 13, 2020, 15:50: Open SV3 & SV4.

Tuesday, October 13, 2020, 15:55: Close mini-pump & switch off. SV3 & SV4. Briefly open/close SV5. Continue until vacuum stabilizes.

Tuesday, October 13, 2020, 15:59: SV5 open. Alt SV3 & SV4 w/ SV5 until stable.

Tuesday, October 13, 2020, 16:04: Gas lines SV3, SV4, SV5 open. Vacuum @ 9.96e-06T & dropping.

Tuesday, October 13, 2020, 22:30: PS on. Vacuum @ 2.13e-06T. Auto-ramping TGHT / TBHT to 300 / 150 A @ 1 A per min.  

Tuesday, October 13, 2020, 22:33: Anode* Short? Halt auto-ramping.

Tuesday, October 13, 2020, 22:35: Auto-ramping TGHT / TBHT to 100 / 50 A @ 1 A per min. Coil @ 10 A.


Wednesday, October 14, 2020, 05:19: Auto-ramping TGHT / TBHT to 300 / 150 A @ 1 A per min.  

Wednesday, October 14, 2020, 07:14: BIAS / EE / EZL to 20 / -1.5 / 10 kV. IV4 opened.

Wednesday, October 14, 2020, 10:30: Auto-ramping TGHT to 350 A @ 2 A per min.

Wednesday, October 14, 2020, 11:11: BIAS / EE / EZL to 30 / -1.5 / 13 kV. 

Wednesday, October 14, 2020, 11:12: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. 


Thursday, October 15, 2020, 14:13: MB1 connected.

Epics = Readback

10 A = 11.6 A

0.394 V = 0.39 V

Calibration required, but it's running.

Thursday, October 15, 2020, 14:33: Auto-Cooling. Tap down HV. 

Thursday, October 15, 2020, 14:36: Gas lines closed. 


Friday, October 16, 2020, 07:55: Power / sources off. IG1 off. Turbo pumps off.

Friday, October 16, 2020, 07:56: HS Waterlines purged.

Friday, October 16, 2020, 10:07: Venting.