Wednesday, January 25, 2017, 14:54, Aaron Schmidt, , , , , 42218-9, 41751-6, Done, Target cleaning test HP-SIS CC Clean
|
Target Test (Fully Cleaned vs Crystal Clean only).
For all tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
- Ensure previous test turbos are off by 8:15 and started venting by 9:15am to meet timeline.
-Start Roughing by 10:10am +/- 1 minute.
-TGHT / TBHT ramping starts @ 8:30am. 2A per min to 580A / 200A
ALL START TIMES MUST BE CONSISTENT.
***Pre-outgassed*** Heat Shield W.O# 41751-6: Includes insulators, new Al grounded 9-pin, bracket, & gripper arms. Blank/Plate. No source cup/EE.
HP-SIS Target # 42218-9: Crystal Clean only.
Monday, January 30, 2017, 09:44: HS removed from test stand. Exchange target.
Monday, January 30, 2017, 10:01: Target # 42218-9 placed into test stand. Door open for 17 minutes.
Monday, January 30, 2017, 10:10: Roughing.
Monday, January 30, 2017, 10:10: Doors sealed for roughing.
Monday, January 30, 2017, 10:11: BV1B OPEN. Opened @ 350T.
Monday, January 30, 2017, 10:29: Both Turbo pumps started.
Monday, January 30, 2017, 10:34: Ion gauge on. TP1B @ speed 42 KRPM.
Monday, January 30, 2017, 10:37: TP1A @ speed 38 KRPM.
Monday, January 30, 2017, 10:40: RGA on. Vacuum @1.24E-05T.
Monday, January 30, 2017, 15:30: Vacuum @ 4.49E-07T.
Tuesday, January 31, 2017, 08:14: Water lines opened. No response on RGA. Vacuum stable @ 1.44E-07T.
Tuesday, January 31, 2017, 08:19: Power/Sources on.
Tuesday, January 31, 2017, 08:20: DAQPro loose. re-connected.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
20.9 |
3.95 |
TBHT |
20.7 |
3.08 |
COIL + EE |
20.9 |
5.13 |
TGHT |
21.1 |
5.72 |
Tuesday, January 31, 2017, 08:30: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Tuesday, January 31, 2017, 10:00: Check. Vacuum @ 7.73E-07T.
Tuesday, January 31, 2017, 11:40: Check. Vacuum @ 3.42E-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.4 |
3.92 |
TBHT |
27.0 |
3.45 |
COIL + EE |
23.0 |
5.02 |
TGHT |
24.9 |
5.61 |
Tuesday, January 31, 2017, 13:30: Check. Vacuum @ 2.34E-07T
Tuesday, January 31, 2017, 15:30: Auto-cooling started @ 2A per min.
Wednesday, February 01, 2017, 08:10: Power/sources off.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
22.2 |
3.95 |
TBHT |
22.2 |
3.06 |
COIL + EE |
22.0 |
5.02 |
TGHT |
22.2 |
5.67 |
Wednesday, February 01, 2017, 08:14: Waterlines purged.
Wednesday, February 01, 2017, 08:15: RGA, Ion gauge, turbo pumps off.
Wednesday, February 01, 2017, 09:15: Venting. |
Wednesday, January 25, 2017, 14:55, Aaron Schmidt, , , , , 42218-6, 41751-6, Done, Target cleaning test (Long) HP-SIS Full Clean
|
Target Test (Fully Cleaned vs Crystal Clean only).
For all tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
- Ensure previous test turbos are off by 8:15 and started venting by 9:15am to meet timeline.
-Start Roughing by 10:10am +/- 1 minute.
-TGHT / TBHT ramping starts @ 8:30am. 2A per min to 580A / 200A
ALL START TIMES MUST BE CONSISTENT.
***Pre-outgassed*** Heat Shield W.O# 41751-6: Includes insulators, new Al grounded 9-pin, bracket, & gripper arms. Blank/Plate. No source cup/EE.
HP-SIS Target # 42218-6: Full Clean. Crystal Clear, Acetone, & Methanol used.
Wednesday, February 01, 2017, 09:47: HS removed from test stand. Exchange target.
Wednesday, February 01, 2017, 10:04: Target # 42218-6 placed into test stand. Door open for 17 minutes.
Wednesday, February 01, 2017, 10:10: Roughing.
Wednesday, February 01, 2017, 10:10: Doors sealed for roughing.
Wednesday, February 01, 2017, 10:11 BV1B OPEN. Opened @ 431T.
Wednesday, February 01, 2017, 10:29: Both Turbo pumps started.
Wednesday, February 01, 2017, 10:34: Ion gauge on. TP1B @ speed 42 KRPM.
Wednesday, February 01, 2017, 10:37: TP1A @ speed 38 KRPM.
Wednesday, February 01, 2017, 10:40: RGA on. Vacuum @ 6.79E-05T.
Wednesday, February 01, 2017, 15:30: Check. Vacuum @ 3.18E-7T.
Thursday, February 02, 2017, 08:15: Water lines opened. No response on RGA. Vacuum stable @ 1.29E-07T.
Thursday, February 02, 2017, 08:18: Power/Sources on.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
22.7 |
3.92 |
TBHT |
22.5 |
3.08 |
COIL + EE |
22.5 |
5.10 |
TGHT |
22.7 |
5.66 |
Thursday, February 02, 2017, 08:30: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Thursday, February 02, 2017, 10:00: Check. Vacuum @ 6.76E-07T.
Thursday, February 02, 2017, 11:41: Check. Vacuum @ 3.26E-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
29.1 |
3.99 |
TBHT |
23.9 |
3.16 |
COIL + EE |
23.8 |
5.19 |
TGHT |
25.5 |
5.80 |
Thursday, February 02, 2017, 13:30: Check. Vacuum @ 1.97E-07T.
Thursday, February 02, 2017, 15:30: Check. Vacuum @ 1.88E-07T.
Friday, February 03, 2017, 08:45: Check. Vacuum @ 1.62E-07T
Friday, February 03, 2017, 08:50: RGA restarted.
Friday, February 03, 2017, 10:50: Auto-cooling started @ 2A per min.
Monday, February 06, 2017, 08:18: Multiple attempts made to restart epics. Strip tools are not available. Vacuum data not available (White out screen). (see power outage eLog)
Monday, February 06, 2017, 08:20: RGA confirmed shut down.
Monday, February 06, 2017, 08:23: Sources/power off.
Monday, February 06, 2017, 08:25: Water lines purged.
Monday, February 06, 2017, 10:14: Turbo pumps restarted.
Monday, February 06, 2017, 10:19: Ion gauge on. TP1B @ speed 42 KRPM.
Monday, February 06, 2017, 10:22: TP1A @ speed 38 KRPM.
Tuesday, February 07, 2017, 08:13: Turbos off.
Tuesday, February 07, 2017, 09:10: Venting. |
Monday, July 17, 2017, 09:58, Aaron Schmidt, , HP-SIS, , , 42218-8, 42738-1, , Target cleaning test (Long) HP-SIS CC Clean
|
Target Test (Fully Cleaned vs Crystal Clean only).
For all tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
- Ensure previous test turbos are off by 8:15 and started venting by 9:15am to meet timeline.
-Start Roughing by 10:10am +/- 1 minute.
-TGHT / TBHT ramping starts @ 8:30am. 2A per min to 580A / 200A
ALL START TIMES MUST BE CONSISTENT.
***Pre-outgassed*** Heat Shield W.O# 42738-1: Includes insulators, new Al grounded 9-pin, bracket, & gripper arms. Blank/Plate. No source cup/EE.
HP-SIS Target # 42218-8: Crystal Clean only.
Monday, July 24, 2017, 09:46: HS removed from test stand. Exchange target.
Monday, July 24, 2017, 10:08: Target # 42218-8 placed into test stand. Door open for 22 minutes.
Monday, July 24, 2017, 10:10: Roughing.
Monday, July 24, 2017, 10:10: Doors sealed for roughing.
Monday, July 24, 2017, 10:11: BV1B OPEN. Opened @ 306T.
Monday, July 24, 2017, 10:29: Both Turbo pumps started.
Monday, July 24, 2017, 10:34: Ion gauge on. TP1B @ speed 42 KRPM.
Monday, July 24, 2017, 10:38: TP1A @ speed 38 KRPM.
Monday, July 24, 2017, 10:40: RGA on. Vacuum @ 1.51E-05T.
Monday, July 24, 2017, 15:03: Vacuum @ 6.14e-07T
Tuesday, July 25, 2017, 08:02: Water lines opened. No response on RGA. Vacuum stable @ 1.97E-07T.
Tuesday, July 25, 2017, 08:05: Power/Sources on.
Tuesday, July 25, 2017, 08:23: Anode increased to 5, 10, 25, 50 V. Ok @ 0.000mA
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.3 |
3.77 |
TBHT |
27.3 |
3.02 |
COIL + EE |
27.1 |
4.91 |
TGHT |
27.3 |
5.53 |
Tuesday, July 25, 2017, 08:30: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Tuesday, July 25, 2017, 09:00: Open back power supply panel. Using multimeter, 9-pin ground connection verified. Panel closed.
10:45: Check. Vacuum @ 2E-06T.
11:45: Check. Vacuum @ 3.33E-07T.
13:30: Check. Vacuum @ 2.78E-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
3.78 |
TBHT |
28.1 |
3.03 |
COIL + EE |
27.2 |
4.92 |
TGHT |
29.4
|
4.48 |
Tuesday, July 25, 2017, 14:27: Open back power supply panel. Using multimeter, 9-pin ground connection verified. Panel closed
Wednesday, July 26, 2017, 08:15: Check. Vacuum @ 2.60E-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
3.78 |
TBHT |
27.6 |
2.99 |
COIL + EE |
27.2 |
4.06 |
TGHT |
29.4
|
5.52 |
Wednesday, July 26, 2017, 15:00: Auto-Cooling @ 2A per min. Check. Vacuum @ @2.43e-07T
Thursday, July 27, 2017, 07:20: Check. Vacuum @ 1.44e-07T
Thursday, July 27, 2017, 07:22: Power/sources off.
Thursday, July 27, 2017, 07:24: Waterlines purged.
Thursday, July 27, 2017, 07:26: RGA off.
Thursday, July 27, 2017, 07:27: Ion gauge, Turbos off
Thursday, July 27, 2017, 09:13: Venting. |
Monday, November 05, 2012, 14:41, Anders Mjos, TiC#3, LP-SIS, ITW, TM1, , , Done, Target Removed
|
Target looks OK. The right leg was a bit much out of center and will be adjusted in the lab.
The torque required to loosen the bolts were measured (from left to right):
Target legs: 48 and 30 in lbs
Tube htr: 25, 30 and 25 in lbs |
Tuesday, October 22, 2013, 15:20, Rick Maharaj, , , , , , , Problems/Solutions, Target Heater Conductor Block Insulators Replaced
|
The Conductor insulating blocks - ITD053C and ITD054C - that secure the target heater and coil conductor blocks were replaced. The existing ones were cracked and fell apart upon removal. |
Wednesday, September 14, 2011, 15:40, Anders Mjos, TaC#1, LP-SIS, ITE, TM1, 38634-6, 36833-6, In progress, TaC#1 installed and pumping down.
|
Wednesday, September 14, 2011, 15:39: Vacuum at 1.3e-5 torr
Thursday, September 15, 2011, 08:59: Vacuum at 2.9e-7 torr. Water flowing and vacuum stable. |
Friday, August 09, 2024, 21:08, Ferran Boix Pamies, Ta#67 Thin foils , LP-SIS, ITE, TM4, 45447-14 , 45235-10, In progress, Ta#67 thin foil retesting
|
Friday, August 09, 2024, 21:07 Insulators, retainer and Re foil have been replaced, source cup machined so the ion source does not short against it. Venting TS now.
Friday, August 09, 2024, 22:17 Roughing.
Friday, August 09, 2024, 22:35: TP1B on. - AS
Friday, August 09, 2024, 22:42: TP1A on. - AS.
Friday, August 09, 2024, 22:50: Both TP at speed. 2.65e-05T Vacuum. FS#5 open.
Friday, August 09, 2024, 22:52: PS on. - AS.
AS:
Saturday, August 10, 2024, 07:02: TGHT / TBHT @ 26 / 5 A. BIAS / EE / EZL @ 1 / -0.5 / 1 kV. TGHT tapped back down to 5 A.
Saturday, August 10, 2024, 07:05: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.
Saturday, August 10, 2024, 07:27: Halt ramping @ 45 / 45 A. Set auto-ramping TGHT / TBHT to 500 / 230 @ 2 A per min. Optics are set.
Saturday, August 10, 2024, 09:59: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. TGHT / TBHT @ 321 / 230 & still ramping. One spark on tap up.
Saturday, August 10, 2024, 10:02: Small peaks on RPM0A & RPM0B. No signal on FC0. One spark*.
Saturday, August 10, 2024, 10:07: Spark*
Saturday, August 10, 2024, 10:11: BIAS / EE / EZL @ 1 / -0.5 / 1 kV. TGHT / TBHT @ 344 / 230 & still ramping.
Saturday, August 10, 2024, 11:35: BIAS / EE / EZL @ 30 / -1.5 / 13 kV
Saturday, August 10, 2024, 11:38: 1 spark*
Saturday, August 10, 2024, 11:40: TGHT / TBHT @ 500 / 230 A. FC0 & wire scans produced signals / peaks.
Saturday, August 10, 2024, 11:45: Starting mass scan.
Saturday, August 10, 2024, 12:17: Mass scan taken. Wire scans on Mass 27 taken. Signals noted on mass 40 & 138 approx. Also of note. One large spark. Steerers reset. Signal on TGHT current.
https://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2024_07_26_Ta_67_thinfoil_1st_massscan.txt
Saturday, August 10, 2024, 12:21: Begin HV Check.
Saturday, August 10, 2024, 12:24: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.
Saturday, August 10, 2024, 12:28: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.
Saturday, August 10, 2024, 12:44: Began sparking after 40. Brought back down
Saturday, August 10, 2024, 12:56: HV @ 0 kV.
Saturday, August 10, 2024, 13:05: BIAS / EE / EZL @ 30 / -1.5 / 13 kV
Saturday, August 10, 2024, 13:07: BIAS / EE / EZL @ 35 / -1.8 / 15 kV
Saturday, August 10, 2024, 13:10: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.
Saturday, August 10, 2024, 13:24: Spark* reset optics.
Saturday, August 10, 2024, 13:44: BIAS / EE / EZL @ 30 / -1.5 / 13 kV
Saturday, August 10, 2024, 14:03: HV to 0 kV.
Saturday, August 10, 2024, 14:12: Begin Auto-cooling @ 2 A per min.
Monday, August 12, 2024, 05:43: Sources Off. IV4 Closed.
Monday, August 12, 2024, 05:45: IG1 & Chamber TP off.
Monday, August 12, 2024, 07:46: TS Computer rebooted. IV4 reset. PS off. Venting. |
Friday, June 25, 2021, 11:18, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44691-4, 44378-4, Done, Ta#62 Conditioning - New
|
Replacement Ta target for the previous one (44139-10) https://elog.triumf.ca/TIS/Test-Stand/880
Friday, June 25, 2021, 11:16: Roughing.
Friday, June 25, 2021, 11:55: TP1B started.
Friday, June 25, 2021, 12:00: TP1B on. TP1 A started.
Friday, June 25, 2021, 12:08: IG1 on.
Friday, June 25, 2021, 12:23: Vacuum @ 1.06E-05T. Open waterline FS#5.
Friday, June 25, 2021, 12:26: Vacuum @ 9.97E-06T. OK.
Friday, June 25, 2021, 12:30: Power / sources PS on.
Friday, June 25, 2021, 12:34: Full check for remote use. IV4 open (OK)
Vacuum @ 6.70e-06T
TGHT / TBHT @ 10 / 10 A
BIAS / EE / EZL @ 1 / -0.1 / 0.5 kV.
Ready for operation.
Friday, June 25, 2021, 12:39: All back to 0 Kv / 0 A. Wait for vacuum stabilization.
Sunday, June 27, 2021, 03:55: Auto-ramping TGHT / TBHT to 500 / 150 A @ 2 A per min.
Sunday, June 27, 2021, 04:04: BIAS / EE / EZL @ 20 / -1.0 / 10 kV.
Sunday, June 27, 2021, 09:36: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Sunday, June 27, 2021, 10:07: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Sunday, June 27, 2021, 10:16: TGHT / TBHT @ 580 / 230 A. Vacuum @ 1.25e-06T.
Sunday, June 27, 2021, 11:20: Mass & wire scans complete. Vacuum @ 1.14e-06T. Auto-cooling @ 2 A per min.
Sunday, June 27, 2021, 15:07: BIAS / EE / EZL @ 0 kV. TGHT still cooling.
Monday, June 28, 2021, 06:17: IV4 closed (Needs reset). Sources, IG1, turbo pumps, off
Monday, June 28, 2021, 08:22: Power off. IV4 reset. Venting. |
Monday, June 21, 2021, 11:53, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44139-10, 44378-4, Failed, Ta#62 Conditioning - 2
|
Replace 9-pin back to normal grounded setup. Re-salt Ta#62. (Cu Gaskets in-use on FS#5)
Monday, June 21, 2021, 11:30: Roughing chamber.
Monday, June 21, 2021, 11:50: Removed backing window. Roughing beam line side.
Monday, June 21, 2021, 12:01: Multimeters removed. Back HV rack re-grounded. TP6 & TP2 on.
Monday, June 21, 2021, 12:02: TP1B on.
Monday, June 21, 2021, 12:13: TP1A on.
Monday, June 21, 2021, 12:21: IG1 on.
Monday, June 21, 2021, 14:37: Vacuum @ 3.96e-06T. Open FS#5
Monday, June 21, 2021, 14:39: Vacuum @ 3.76e-06T.
Monday, June 21, 2021, 14:42: Power / Sources on.
Monday, June 21, 2021, 14:43; IV4 opened & Optics on
Tuesday, June 22, 2021, 07:40: Quick system check ok.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
23.7 |
4.02 |
TBHT |
24.2 |
3.18
|
COIL + EE |
23.6 |
5.11 |
TGHT |
23.8 |
5.64 |
Tuesday, June 22, 2021, 07:42: Auto-ramping TGHT / TBHT to 300 / 150 A @ 3 A per min.
Tuesday, June 22, 2021, 09:36: TGHT / TBHT @ 300 / 150 A. BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, June 22, 2021, 09:38: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Tuesday, June 22, 2021, 09:46: External / cage sparks* Multiple.
Tuesday, June 22, 2021, 09:58: Turn down BIAS to 25 kV.
Tuesday, June 22, 2021, 12:45: BIAS to 30 kV.
Tuesday, June 22, 2021, 13:05: Odd. There was activity on FC0 right when the HV was turned on before the 580 ramp up. Now, no activity on FC0, or wire scans. Turning HV down / off.
Tuesday, June 22, 2021, 13:10: BIAS / EE / EZL @ 0 kV.
Tuesday, June 22, 2021, 13:41: Rear cage opened. Digital multi-meter was removed.
Tuesday, June 22, 2021, 13:48: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, June 22, 2021, 13:57: No beam. Auto-cooling @ 3 A per min.
Tuesday, June 22, 2021, 16:23: HV power off. Optics off. IV4 off. TGHT still cooling.
Wednesday, June 23, 2021, 04:31: IG1 & turbo pumps off.
Wednesday, June 23, 2021, 06:00: Venting. Power off. FS#5 purged. |
Monday, June 07, 2021, 13:45, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44139-10, 44378-4, In progress, Ta#62 Conditioning
|
Monday, June 07, 2021, 13:44: Roughing.
Monday, June 07, 2021, 14:16: TP1B on. (Tripped shortly after?)
Monday, June 07, 2021, 14:32: Unstable. Venting.
Monday, June 07, 2021, 15:05: Changed gaskets. Left side suspect. Roughing.
Monday, June 07, 2021, 15:35: TP1B on.
Monday, June 07, 2021, 15:42: TP1B up to speed.
Monday, June 07, 2021, 15:45: TP1A on.
Monday, June 07, 2021, 16:01: IG1 on.
Monday, June 07, 2021, 16:02: FS#5 opened. No response on backing lines. TSG:IG1 ok.
Tuesday, June 08, 2021, 08:01: Power / sources on.
Tuesday, June 08, 2021, 08:07: Reset / CFG optics & steering.
Tuesday, June 08, 2021, 08:08: TGHT / TBHT @ 10 A ok. BIAS / EE / EZL @ 5 / -0.5 / 1 kV. Quick system check ok.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
21.9 |
4.02 |
TBHT |
22.4 |
3.15
|
COIL + EE |
21.9 |
4.99 |
TGHT |
22.0 |
5.58 |
Tuesday, June 08, 2021, 08:13: Auto ramping TGHT / TBHT to 350 / 150 @ 2 A per min.
Tuesday, June 08, 2021, 08:19: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Small spark near 30 kV while bringing up the HV.
Tuesday, June 08, 2021, 08:25: IV4 open. Optics set minus TPS:CB2. Shows as green 'on', set to 500V, however read back shows as 0 V.
Tuesday, June 08, 2021, 12:44: Auto ramping TGHT / TBHT to 580 / 230 @ 2 A per min.
Tuesday, June 08, 2021, 15:53: Beam on FC0 ok. Optics set minus TPS:CB2, however FC6 is disconnected. auto-cooling @ 3 A per min.
Tuesday, June 08, 2021, 18:32: Auto-cooling halted. TGHT @ 104.3 A.
Wednesday, June 09, 2021, 07:13: Auto-cooling continued @ 2 A per min.
Wednesday, June 09, 2021, 08:37: HV off. Attempts made to restart TPS:CB2 unsuccessful. Controls notified.
Wednesday, June 09, 2021, 10:33: Power / sources off. FS#5 purged. IV4 closed. IG1 & IG6 off. All turbo pumps off.
Wednesday, June 09, 2021, 11:52: Venting VV1 & VV6.
|
Wednesday, March 11, 2020, 13:31, Aaron Schmidt, Ta#60, LP-SIS, , , 44139-13, 43515-5, In progress, Ta#60 w/ EE testing - 2
|
Thermocouples installed on EE. Double checked continuity & used a heat gun.
Wednesday, March 11, 2020, 13:30: Roughing.
Wednesday, March 11, 2020, 15:03: Turbo pumps on, interlocks by-passed (No water at the moment)
Wednesday, March 11, 2020, 15:10: IG1 on.
Thursday, March 12, 2020, 06:08: Vacuum @ 2.33e-06T. Opening waterlines.
Thursday, March 12, 2020, 06:11: Waterlines all open. Vacuum Stable @ 2.31e-06T
Thursday, March 12, 2020, 06:13: Bypass on TP1A & B removed.
Thursday, March 12, 2020, 06:18: Power / Sources on TGHT / TBHT @ 0 / 0 A.
Thursday, March 12, 2020, 06:20: Auto-ramping TGHT / TBHT to 250 / 150 A @ 4 A per min.
Thursday, March 12, 2020, 07:34: Auto-ramping TGHT / TBHT to 350 / 200 A @ 4 A per min.
Thursday, March 12, 2020, 08:02: Auto-ramping TGHT / TBHT to 450 / 230 A @ 4 A per min.
Thursday, March 12, 2020, 08:30: Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.
Thursday, March 12, 2020, 08:55: Ramping aborted. TGHT / TBHT @ 488 / 230 A. Vacuum limit reached at 3.30e-06T.
Thursday, March 12, 2020, 08:56: Vacuum limit increased to 5.0e-06T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.
Thursday, March 12, 2020, 09:27: TGHT / TBHT @ 580 / 230 A. Temperatures recorded.
W/ Water cooling on EE
TGHT / TBHT Current (A) |
EE Temp (A - T1 - Red/Black wire - 1,2)
[C] |
EE Temp (B - T2 - White/Black wire 8,9)
[C] |
0 / 0 |
17.7 |
17.8 |
250 / 150 |
26.4 |
28.1 |
350 / 200 |
34.1 |
39.0
|
450 / 230 |
41.4 |
48.0 |
580 / 230 |
43.1 |
49.0 |
Thursday, March 12, 2020, 09:31: Auto-cooling @ 6A per min.
Thursday, March 12, 2020, 11:09: PS off. Lock up. Remove HV cage for FS#3 EE route & water purge.
Thursday, March 12, 2020, 11:27: PS on. Locks off. FS#3 re-routed (K line - EE isolated). Water on. Vacuum ok @ 2.07e-06T
W/O Water cooling on EE
TGHT / TBHT Current (A) |
EE Temp (A - T1 - Red/Black wire - 1,2)
[C] |
EE Temp (B - T2 - White/Black wire 8,9)
[C] |
0 / 0 |
15.5 |
15.6 |
250 / 150 |
26.6 |
27.6 |
350 / 200 |
35.0 |
38.9
|
450 / 230 |
42.6 |
48.1 |
580 / 230 |
46.3 |
51.9 |
580 / 230 @ 2:41 pm |
43.3 |
49.3 |
Thursday, March 12, 2020, 11:28: Power / Sources on TGHT / TBHT @ 0 / 0 A.
Thursday, March 12, 2020, 11:29: Auto-ramping TGHT / TBHT to 250 / 150 A @ 4 A per min.
Thursday, March 12, 2020, 12:33: Auto-ramping TGHT / TBHT to 350 / 200 A @ 4 A per min.
Thursday, March 12, 2020, 13:02: Auto-ramping TGHT / TBHT to 450 / 230 A @ 4 A per min.
Thursday, March 12, 2020, 13:28: Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.
Thursday, March 12, 2020, 14:11: TGHT / TBHT @ 580 / 230 A. Temperatures recorded.
Thursday, March 12, 2020, 14:41: Auto-cooling @ 4A per min.
Tuesday, March 17, 2020, 05:26: IG1 & turbo pumps off. Water lines closed for FS#3 & HS.
Tuesday, March 17, 2020, 05:31: Waterlines FS#5 & FS#3 purged.
Tuesday, March 17, 2020, 07:08: Venting. |
Thursday, February 20, 2020, 11:41, Aaron Schmidt, Ta#60, LP-SIS, , , 44139-13, 43515-5, In progress, Ta#60 w/ EE testing
|
Ta#60 (Unconditioned) - Salts in.
Thursday, February 20, 2020, 14:04: Roughing.
Thursday, February 20, 2020, 14:38: Turbo pumps on (Leak check in am).
Thursday, February 20, 2020, 14:43: IG1 on.
Friday, February 21, 2020, 06:36: Waterlines opened. No vacuum response. Vacuum ok @ 8.69e-07T.
Friday, February 21, 2020, 06:38: Turbo pumps off.
EE Thermocouples req'd.
Friday, February 21, 2020, 11:15: Vented.
9-pin removed. Thermocouples installed.
Friday, February 21, 2020, 13:52: Roughing.
Friday, February 21, 2020, 14:24: Turbo pumps on.
EE Waterline - On
Wednesday, February 26, 2020, 07:40: Waterlines re-opened. Vacuum ok. @ 3.51e-07T
Wednesday, February 26, 2020, 07:43: Power / sources on.
Wednesday, February 26, 2020, 07:45: Auto ramping TGHT / TBHT @ 2 A per min to 250 / 150 A.
TGHT / TBHT Current (A) |
EE Temp (A - T1 - Upper left)
[C] |
EE Temp (B - T4 - Lower right)
[C] |
250 / 150 |
20.8 |
24.0 |
350 / 200 |
22.5 |
29.7
|
450 / 230 |
20.1 |
30.9 |
580 / 230 |
14.5 |
28.8 |
580 / 230 @ 2:52 pm |
6.2 |
21.6 |
Wednesday, February 26, 2020, 09:52: Auto ramping TGHT / TBHT @ 2 A per min to 350 / 200 A.
Wednesday, February 26, 2020, 11:04: Auto ramping TGHT / TBHT @ 2 A per min to 450 / 230 A.
Wednesday, February 26, 2020, 11:57: Auto ramping TGHT / TBHT @ 2 A per min to 580 / 230 A.
Wednesday, February 26, 2020, 13:03: TGHT / TBHT @ 580 / 230 A.
Wednesday, February 26, 2020, 14:52: Temp check (thermocouple reversed on T1?)
Wednesday, February 26, 2020, 14:54: Auto-cooling @ 2A per min.
Thursday, February 27, 2020, 06:30: Power/sources off, locked out. FS#3 purged. Cage open.
Thursday, February 27, 2020, 07:20: Line K (EE) disconnected from FS#3. Old fitting swapped for new one. See https://elog.triumf.ca/TIS/Test-Stand/786.
No water/cooling running into EE.
Thursday, February 27, 2020, 07:26: All waterlines open. Vacuum ok.
Thursday, February 27, 2020, 07:28: Power / Sources on.
TGHT / TBHT Current (A) |
EE Temp (A - T1 - Upper left)
[C] |
EE Temp (B - T4 - Lower right)
[C] |
0 / 0 |
22.8 |
22.9 |
50 / 25 |
22.6 |
22.7 |
100 / 50 |
22.6 |
22.6
|
150 / 100 |
22.2 |
23.3 |
200 / 150 |
22.0 |
24.9 |
200 / 150 7am Day 2 |
21.2 |
23.9 |
250 / 200 |
23.3 |
29.3 |
300 / 230 |
22.4 |
30.6 |
350 / 230 |
19.2 |
27.7 |
450 / 230 |
18.5 |
29.7 |
580 / 230 |
13.4 |
27.3 |
Thursday, February 27, 2020, 07:35: Auto ramping TGHT / TBHT @ 2 A per min to 50 / 25 A.
Thursday, February 27, 2020, 08:00: Auto ramping TGHT / TBHT @ 2 A per min to 100 / 50 A.
Thursday, February 27, 2020, 08:56: Auto ramping TGHT / TBHT @ 2 A per min to 150 / 100 A.
Thursday, February 27, 2020, 10:29: Auto ramping TGHT / TBHT @ 2 A per min to 200 / 150 A.
Friday, February 28, 2020, 06:56: Auto ramping TGHT / TBHT @ 2 A per min to 250 / 200 A.
Friday, February 28, 2020, 07:38: Auto ramping TGHT / TBHT @ 2 A per min to 300 / 230 A.
Friday, February 28, 2020, 09:54: Auto ramping TGHT / TBHT @ 2 A per min to 350 / 230 A.
Friday, February 28, 2020, 13:20: Auto ramping TGHT / TBHT @ 2 A per min to 450 / 230 A.
Friday, February 28, 2020, 14:15: Auto ramping TGHT / TBHT @ 2 A per min to 580 / 230 A.
Friday, February 28, 2020, 15:42: Last temperature measurement Taken. TGHT / TBHT @ 580 / 230 A.
Friday, February 28, 2020, 15:44: Auto-cooling @ 2A per min.
Monday, March 02, 2020, 07:37: Power / Sources off. Waterlines purged (A little over 2000 PSI left in the N Bottle)
Monday, March 02, 2020, 07:38: IG1 & Turbo pumps off. |
Friday, September 11, 2015, 11:43, Anders Mjos, Ta#46, HP-SIS, ITE, TM4, , , Done, Ta#46 conditioning
|
EE is ST-200 material (AlN)
Friday, September 11, 2015, 11:0: Roughing
Friday, September 11, 2015, 12:12: Turbos started.
Friday, September 11, 2015, 12:22: Turbos at speed. Vacuum at 2.2E-5 T
Friday, September 11, 2015, 14:02: RGA on.
Monday, September 14, 2015, 08:05: Opened water for HS circuit. Vacuum stable at 2.3E-7 T. No response on RGA.
Monday, September 14, 2015, 08:08: Opened IV4
Monday, September 14, 2015, 08:11: Starting Target Heat. TGHT/TBHT 580 / 200 A at 2 / 1 A/min. Good/bad vacuum 4E-6 / 6E-6 T
Monday, September 14, 2015, 08:12: Interlock for BIAS does not clear although EE is on. Interlock cleared when beam line elements were turned on
Monday, September 14, 2015, 08:20: BIAS/EZL/EE at 30 / 15 / 1.5 kV
Monday, September 14, 2015, 08:25: Returned MB1 to remote control
Monday, September 14, 2015, 13:28: Target at temperature
Monday, September 14, 2015, 15:06: Heating TBHT to 230 A
Tuesday, September 15, 2015, 15:03: EE to 2 kV
Tuesday, September 15, 2015, 16:39: EE to 1.5 kV
Tuesday, September 15, 2015, 17:01: Starting target cool down
Wednesday, September 16, 2015, 09:01: HV and source off. Closed IV4. Turbos off
Wednesday, September 16, 2015, 12:52: RGA off. Venting |
Friday, September 27, 2013, 11:41, Anders Mjos, Ta#41, HP-SIS, ITW, TM4, 39069-5, 38817-10, Done, Ta#41 Conditioning
|
Friday, September 27, 2013, 11:41: Roughing
Friday, September 27, 2013, 12:08: Turbos started
Friday, September 27, 2013, 12:16: Turbos at speed.
Friday, September 27, 2013, 12:18: Vacuum at 1.5E-5 T
Monday, September 30, 2013, 08:41: Opened water supply. Vacuum stable at 1.5E-7 T
TGHT Q=5.5 T=28.0
TBHT Q=5.8 T=28.0
Monday, September 30, 2013, 15:19: Flow sensor moved from TBHT to HS
TGHT Q=5.5 T=27.9
HS Q=3.6 T=27.8
Tuesday, October 01, 2013, 12:08: Taget Biased to 30kV.
Wednesday, October 02, 2013, 08:50: Started autoramping to 580A/230A
Wednesday, October 02, 2013, 08:50: Opened IV4
Wednesday, October 02, 2013, 10:51 TGHT/TBHT 250A / 239A
TGHT Q=5.5 T=28.5
HS Q=3.6 T=29.2
SUPPLY (ext) 27.3
RETURN (ext) 27.8
Wednesday, October 02, 2013, 13:28 TGHT/TBHT 250A / 570A
TGHT Q=5.5 T=30.4
HS Q=3.6 T=33.4
SUPPLY (ext) 27.4
RETURN (ext) 29.3
Wednesday, October 02, 2013, 13:30: TBHT was starting to limit on voltage. Increased voltage limit to 2.4V.
Thursday, October 03, 2013, 08:21: TMS:TP2 timed out over night.
Magnet PS breaker tripped during a mass scan yesterday. Reset breaker and cleared interlocks.
TGHT Q=5.5 T=30.4
HS Q=3.6 T=34.0
SUPPLY (ext) 27.3
RETURN (ext) 29.3
Thursday, October 03, 2013, 08:28: Started mass scan 200 -> 0 m/q. FC0 7.5E-8 A
Thursday, October 03, 2013, 14:29
TGHT Q=5.5 T=30.6
HS Q=3.6 T=33.9
SUPPLY (ext) 27.4
RETURN (ext) 29.6
Thursday, October 03, 2013, 15:14: Lowered TBHT:RDCUR to 230A.
Thursday, October 03, 2013, 15:37: Increased EE to -2000 V
Thursday, October 03, 2013, 16:22
TGHT Q=5.5 T=30.6
HS Q=3.6 T=33.9
SUPPLY (ext) 27.5
RETURN (ext) 29.6
Friday, October 04, 2013, 08:08
TGHT Q=5.5 T=30.6
HS Q=3.5 T=33.9
SUPPLY (ext) 27.5
RETURN (ext) 29.3
Mass scan started.
Friday, October 04, 2013, 08:46: Cool down started.
Friday, October 04, 2013, 13:35: TPS:IV4 closed
Friday, October 04, 2013, 13:41: Source debiased.
Tuesday, October 15, 2013, 09:56: Turbos stopped. Vacuum at 1.15 E-7 T
Tuesday, October 15, 2013, 12:44: Venting
After the conditioning, some oxidation (?) from the standards (?) were found on the Plasma Electrode and around the Target Tube. See attachment |
Thursday, April 18, 2013, 13:50, Anders Mjos, Ta#40, HP-SIS, ITE, TM4, 38295-4, , Done, Ta#40 stored under vacuum
|
Target installed at the Test Stand after an inspection in the lab. EE was cleand. All bolts torqued to 130 in lbs
Thursday, April 18, 2013, 13:48: Rouging
Thursday, April 18, 2013, 14:11: Starting turbos
Thursday, April 18, 2013, 14:20 : Turbos at speed
Thursday, April 18, 2013, 14:21 : Vacuum at 2.3E-5 T
Friday, April 19, 2013, 08:23: Opened cooling water. Vacuum stable at 9.6E-6 T
Vacuum is somewhat higher than expected (5.2E-7 T) . Will went and clean the o-rings on the doors.
Monday, April 22, 2013, 09:32: Turbos off.
Monday, April 22, 2013, 10:57: Venting
Monday, April 22, 2013, 12:25: Vented
Monday, April 22, 2013, 14:09: Roughing
Monday, April 22, 2013, 14:31: Started Turbos
Monday, April 22, 2013, 14:40: Turbos at speed
Monday, April 22, 2013, 14:41: Vacuum at 1.8E-5 T
Tuesday, April 23, 2013, 09:52 : Vacuum at 2.6E-7 T - already an improvement from yesterday
Thursday, April 25, 2013, 08:47: Stopped turbos. A test target with at new FEBIAD coil will be tested.
Thursday, April 25, 2013, 13:27: Venting |
Monday, March 25, 2013, 11:39, Anders Mjos, Ta#39, LP-SIS, ITW, TM1, , , Done, Ta#39 commissioning
|
Target installed with 130 in lbs torque on all bolts.
Monday, March 25, 2013, 11:36: Roughing
Monday, March 25, 2013, 11:54: Starting turbos
Monday, March 25, 2013, 12:02: Both turbos at speed
Monday, March 25, 2013, 12:04: Vacuum at 2E-5 Torr
Tuesday, March 26, 2013, 08:03: Opened water supply. Vacuum stable at 3E-7 Torr
Tuesday, March 26, 2013, 09:11
All P/S switched on.
ISAC Ops will condition this target as a training exercise.
ISAC ops e-log
ISAC ops e-log 2
Wednesday, March 27, 2013, 13:41: ISAC ops called to inform that the target has been cooled down and bias is off.
Thursday, March 28, 2013, 08:22: Closed TPS:IV4 and switched off turbos.
Thursday, March 28, 2013, 13:27: Venting
Thursday, March 28, 2013, 13:33: Water purged |
Wednesday, April 25, 2018, 09:50, Aaron Schmidt, Ta (test), LP-SIS, , , 41177-3, , In progress, Ta test and window change
|
Window changed on view port. Ta target prepared for Aurelia's tests.
***Note*** No Ta window foils on the end plates. Initial ramping to on the TGHT to 300 A. Follow up in increments of 50 A and check the right door window temperature.
Wednesday, April 25, 2018, 09:47: Roughing both the Evap/box end and beam end.
Wednesday, April 25, 2018, 10:27: All 4 turbo pumps started.
Wednesday, April 25, 2018, 10:49: Both Ion gauges on.
Wednesday, April 25, 2018, 14:56: RGA on.
Thursday, April 26, 2018, 06:54: Water lines opened. No response on RGA. Vacuum stable @ 4.23e-07T
Thursday, April 26, 2018, 06:56: Power/sources on.
Thursday, April 26, 2018, 07:00: Auto ramping TGHT to 300 @ 2A per min.
Thursday, April 26, 2018, 07:05: IV4 opened.
Thursday, April 26, 2018, 08:50: Door temp @ 25 C @ left window.
Thursday, April 26, 2018, 09:30: 300A reached. Door temp @ 26 C @ left window.
Thursday, April 26, 2018, 13:01: 550A Reached. Door temp @ 29 C @ left window.
Monday, April 30, 2018, 07:05: IV4 closed, RGA off.
Monday, April 30, 2018, 07:10: Ion gauge off. Turbo pumps off.
Monday, April 30, 2018, 11:00: Venting. Purging water lines. |
Tuesday, June 14, 2016, 10:46, Aaron Schmidt, , LP-SIS, , , , , , TUBE ONLY - NO PLASMA ELECTRODE
|
Tuesday, June 14, 2016, 10:46: Begin roughing.
Tuesday, June 14, 2016, 11:16: Turbo pumps started.
Tuesday, June 14, 2016, 11:23: Ion gauge on.
Wednesday, June 15, 2016, 07:45: Water opened. RGA ok. Vacuum stable @ 1.9E-7T. Power/sources on.
Wednesday, June 15, 2016, 08:24: BIAS / EZL / EE to 30 / 13 / 1.5 kV
Wednesday, June 15, 2016, 08:24: Ramping TBHT to 120 A at 1 A/min
Wednesday, June 15, 2016, 10:23: EZL P/S was not on. Switched on and set to 13 kV
Wednesday, June 15, 2016, 15:05: Ramping down.
Thursday, June 16, 2016, 08:57: IV4 reset. RGA off. Ion gauge off. Turbo pumps off.
Thursday, June 16, 2016, 13:22: Water lines purged. Power/sources off. Venting. |
Thursday, June 16, 2016, 14:34, Aaron Schmidt, , LP-SIS, , , , , , TUBE ONLY (3)
|
Thursday, June 16, 2016, 14:33: Roughing. Plasma Electrode re-attached. Salts replaced.
Thursday, June 16, 2016, 15:12: Turbo pumps started.
Thursday, June 16, 2016, 15:22: Ion gauge on.
Friday, June 17, 2016, 08:32: Water opened. RGA ok. Vacuum stable @ 2.4E-7T. Power/sources on.
Saturday, June 18, 2016, 09:31: Cool down started.
Monday, June 20, 2016, 09:48: Sources/power/voltages off.
Monday, June 20, 2016, 10:06: IV4 reset. Water lines purged.
Monday, June 20, 2016, 10:11: RGA off. Ion gauge off. Turbos off.
Monday, June 20, 2016, 11:50: Venting |
Thursday, June 09, 2016, 14:56, Aaron Schmidt, , LP-SIS, , , , , , TUBE ONLY
|
Thursday, June 09, 2016, 14:50: Begin roughing.
Thursday, June 09, 2016, 15:34: Turbo pumps started.
Thursday, June 09, 2016, 15:42: Ion gauge on.
Friday, June 10, 2016, 08:27: RGA on.
Friday, June 10, 2016, 08:35: Water opened. RGA ok. Vacuum stable @ 1.9E-7T
Friday, June 10, 2016, 08:50: BIAS/EZL/EE to 30/13/1.5kV.
Friday, June 10, 2016, 08:52: Auto ramping TBHT only @ 2A min to 50A.
Friday, June 10, 2016, 10:02: Auto ramping TBHT only @ 1A min to 100A.
Friday, June 10, 2016, 11:14: Continue ramping to 150 A -AM
Friday, June 10, 2016, 11:28: Stopped ramping ag 110 A -AM
Monday, June 13, 2016, 08:12: Auto ramping TBHT only @ 1A min to 150A.
Monday, June 13, 2016, 09:59: Ramping to 150 A - AM
Monday, June 13, 2016, 15:51: Ramping down.
Tuesday, June 14, 2016, 07:47: IV4 Reset. Ion gauge off. Turbos off.
Tuesday, June 14, 2016, 07:52: Power/sources off. Water purged.
Tuesday, June 14, 2016, 09:20: Venting. |
|