ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subjectdown
  565   Wednesday, January 25, 2017, 14:54 Aaron Schmidt    42218-941751-6DoneTarget cleaning test HP-SIS CC Clean

Target Test (Fully Cleaned vs Crystal Clean only).

For all tests:

-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.

- Ensure previous test turbos are off by 8:15 and started venting by 9:15am to meet timeline.

-Start Roughing by 10:10am +/- 1 minute.

-TGHT / TBHT ramping starts @ 8:30am. 2A per min to 580A / 200A

ALL START TIMES MUST BE CONSISTENT.


***Pre-outgassed*** Heat Shield W.O# 41751-6: Includes insulators, new Al grounded 9-pin, bracket, & gripper arms. Blank/Plate. No source cup/EE.


HP-SIS Target # 42218-9: Crystal Clean only.


Monday, January 30, 2017, 09:44: HS removed from test stand. Exchange target.

Monday, January 30, 2017, 10:01: Target # 42218-9 placed into test stand. Door open for 17 minutes.

Monday, January 30, 2017, 10:10: Roughing.

Monday, January 30, 2017, 10:10: Doors sealed for roughing.

Monday, January 30, 2017, 10:11: BV1B OPEN. Opened @ 350T.

Monday, January 30, 2017, 10:29: Both Turbo pumps started.

Monday, January 30, 2017, 10:34: Ion gauge on. TP1B @ speed 42 KRPM.

Monday, January 30, 2017, 10:37: TP1A @ speed 38 KRPM.

Monday, January 30, 2017, 10:40: RGA on. Vacuum @1.24E-05T.

Monday, January 30, 2017, 15:30: Vacuum @ 4.49E-07T.


Tuesday, January 31, 2017, 08:14: Water lines opened. No response on RGA. Vacuum stable @ 1.44E-07T.

Tuesday, January 31, 2017, 08:19: Power/Sources on.

Tuesday, January 31, 2017, 08:20: DAQPro loose. re-connected.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 20.9 3.95
 TBHT 20.7 3.08
 COIL + EE 20.9 5.13
 TGHT  21.1 5.72

Tuesday, January 31, 2017, 08:30: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.

Tuesday, January 31, 2017, 10:00: Check. Vacuum @ 7.73E-07T.

Tuesday, January 31, 2017, 11:40: Check. Vacuum @ 3.42E-07T.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.4 3.92
 TBHT 27.0 3.45
 COIL + EE 23.0 5.02
 TGHT  24.9 5.61

Tuesday, January 31, 2017, 13:30: Check. Vacuum @ 2.34E-07T

Tuesday, January 31, 2017, 15:30: Auto-cooling started @ 2A per min.


Wednesday, February 01, 2017, 08:10: Power/sources off.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 22.2 3.95
 TBHT 22.2 3.06
 COIL + EE 22.0 5.02
 TGHT  22.2 5.67

Wednesday, February 01, 2017, 08:14: Waterlines purged.

Wednesday, February 01, 2017, 08:15: RGA, Ion gauge, turbo pumps off.

Wednesday, February 01, 2017, 09:15: Venting.

Attachment 1: HP-SIS_CC_Clean.docx
Attachment 2: TS-2017-01-30-11-00.rga
Attachment 3: OMEGA_OM-DAQPRO-5300_01-Feb-17_15.36.02.dlp
  566   Wednesday, January 25, 2017, 14:55 Aaron Schmidt    42218-641751-6DoneTarget cleaning test (Long) HP-SIS Full Clean

Target Test (Fully Cleaned vs Crystal Clean only).

For all tests:

-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.

- Ensure previous test turbos are off by 8:15 and started venting by 9:15am to meet timeline.

-Start Roughing by 10:10am +/- 1 minute.

-TGHT / TBHT ramping starts @ 8:30am. 2A per min to 580A / 200A

ALL START TIMES MUST BE CONSISTENT.


***Pre-outgassed*** Heat Shield W.O# 41751-6: Includes insulators, new Al grounded 9-pin, bracket, & gripper arms. Blank/Plate. No source cup/EE.


HP-SIS Target # 42218-6: Full Clean. Crystal Clear, Acetone, & Methanol used.


Wednesday, February 01, 2017, 09:47: HS removed from test stand. Exchange target.

Wednesday, February 01, 2017, 10:04: Target # 42218-6 placed into test stand. Door open for 17 minutes.

Wednesday, February 01, 2017, 10:10: Roughing.

Wednesday, February 01, 2017, 10:10: Doors sealed for roughing.

Wednesday, February 01, 2017, 10:11 BV1B OPEN. Opened @ 431T.

Wednesday, February 01, 2017, 10:29: Both Turbo pumps started.

Wednesday, February 01, 2017, 10:34: Ion gauge on. TP1B @ speed 42 KRPM.

Wednesday, February 01, 2017, 10:37: TP1A @ speed 38 KRPM.

Wednesday, February 01, 2017, 10:40: RGA on. Vacuum @ 6.79E-05T.

Wednesday, February 01, 2017, 15:30: Check. Vacuum @ 3.18E-7T.


Thursday, February 02, 2017, 08:15: Water lines opened. No response on RGA. Vacuum stable @ 1.29E-07T.

Thursday, February 02, 2017, 08:18: Power/Sources on.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 22.7 3.92
 TBHT 22.5 3.08
 COIL + EE 22.5 5.10
 TGHT  22.7 5.66

Thursday, February 02, 2017, 08:30: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.

Thursday, February 02, 2017, 10:00: Check. Vacuum @ 6.76E-07T.

Thursday, February 02, 2017, 11:41: Check. Vacuum @ 3.26E-07T.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  29.1 3.99
 TBHT  23.9  3.16
 COIL + EE  23.8 5.19
 TGHT  25.5  5.80

Thursday, February 02, 2017, 13:30: Check. Vacuum @ 1.97E-07T.

Thursday, February 02, 2017, 15:30: Check. Vacuum @ 1.88E-07T.


Friday, February 03, 2017, 08:45: Check. Vacuum @ 1.62E-07T

Friday, February 03, 2017, 08:50: RGA restarted.

Friday, February 03, 2017, 10:50: Auto-cooling started @ 2A per min.


Monday, February 06, 2017, 08:18: Multiple attempts made to restart epics. Strip tools are not available. Vacuum data not available (White out screen). (see power outage eLog)

Monday, February 06, 2017, 08:20: RGA confirmed shut down.

Monday, February 06, 2017, 08:23: Sources/power off.

Monday, February 06, 2017, 08:25: Water lines purged.

Monday, February 06, 2017, 10:14: Turbo pumps restarted.

Monday, February 06, 2017, 10:19: Ion gauge on. TP1B @ speed 42 KRPM.

Monday, February 06, 2017, 10:22: TP1A @ speed 38 KRPM.


Tuesday, February 07, 2017, 08:13: Turbos off.

Tuesday, February 07, 2017, 09:10: Venting.

Attachment 1: HP-SIS_Full_Clean.docx
Attachment 2: OMEGA_OM-DAQPRO-5300_07-Feb-17_09.17.23.dlp
Attachment 3: TS-2017-02-01-10-40.rga
Attachment 4: TS-2017-02-03-08-50.rga
  598   Monday, July 17, 2017, 09:58 Aaron Schmidt HP-SIS  42218-842738-1 Target cleaning test (Long) HP-SIS CC Clean

 Target Test (Fully Cleaned vs Crystal Clean only).

For all tests:

-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.

- Ensure previous test turbos are off by 8:15 and started venting by 9:15am to meet timeline.

-Start Roughing by 10:10am +/- 1 minute.

-TGHT / TBHT ramping starts @ 8:30am. 2A per min to 580A / 200A

ALL START TIMES MUST BE CONSISTENT.


***Pre-outgassed*** Heat Shield W.O# 42738-1: Includes insulators, new Al grounded 9-pin, bracket, & gripper arms. Blank/Plate. No source cup/EE.


HP-SIS Target # 42218-8: Crystal Clean only.


Monday, July 24, 2017, 09:46: HS removed from test stand. Exchange target.

Monday, July 24, 2017, 10:08: Target # 42218-8 placed into test stand. Door open for 22 minutes.

Monday, July 24, 2017, 10:10: Roughing.

Monday, July 24, 2017, 10:10: Doors sealed for roughing.

Monday, July 24, 2017, 10:11: BV1B OPEN. Opened @ 306T.

Monday, July 24, 2017, 10:29: Both Turbo pumps started.

Monday, July 24, 2017, 10:34: Ion gauge on. TP1B @ speed 42 KRPM.

Monday, July 24, 2017, 10:38: TP1A @ speed 38 KRPM.

Monday, July 24, 2017, 10:40: RGA on. Vacuum @ 1.51E-05T.

Monday, July 24, 2017, 15:03: Vacuum @ 6.14e-07T


Tuesday, July 25, 2017, 08:02: Water lines opened. No response on RGA. Vacuum stable @ 1.97E-07T.

Tuesday, July 25, 2017, 08:05: Power/Sources on.

Tuesday, July 25, 2017, 08:23: Anode increased to 5, 10, 25, 50 V. Ok @ 0.000mA

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 27.3 3.77
 TBHT 27.3 3.02
 COIL + EE 27.1 4.91
 TGHT  27.3 5.53

Tuesday, July 25, 2017, 08:30: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.

Tuesday, July 25, 2017, 09:00: Open back power supply panel. Using multimeter, 9-pin ground connection verified. Panel closed.

10:45: Check. Vacuum @ 2E-06T.

11:45: Check. Vacuum @ 3.33E-07T.

13:30: Check. Vacuum @ 2.78E-07T.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.5 3.78
 TBHT  28.1 3.03
 COIL + EE 27.2  4.92
 TGHT

29.4

4.48

Tuesday, July 25, 2017, 14:27: Open back power supply panel. Using multimeter, 9-pin ground connection verified. Panel closed


Wednesday, July 26, 2017, 08:15: Check. Vacuum @ 2.60E-07T.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.5 3.78
 TBHT  27.6 2.99
 COIL + EE 27.2  4.06
 TGHT

29.4

 5.52

 Wednesday, July 26, 2017, 15:00: Auto-Cooling @ 2A per min. Check. Vacuum @ @2.43e-07T


Thursday, July 27, 2017, 07:20: Check. Vacuum @ 1.44e-07T

Thursday, July 27, 2017, 07:22: Power/sources off.

Thursday, July 27, 2017, 07:24: Waterlines purged.

Thursday, July 27, 2017, 07:26: RGA off.

Thursday, July 27, 2017, 07:27: Ion gauge, Turbos off

Thursday, July 27, 2017, 09:13: Venting.

Attachment 1: HP-SIS_CC_Clean_(Long).docx
Attachment 2: OMEGA_OM-DAQPRO-5300_27-Jul-17_10.25.04.dlp
Attachment 3: TS-2017-07-24-10-40.rga
  231   Monday, November 05, 2012, 14:41 Anders MjosTiC#3LP-SISITWTM1  DoneTarget Removed

Target looks OK. The right leg was a bit much out of center and will be adjusted in the lab.

The torque required to loosen the bolts were measured (from left to right):

Target legs: 48 and 30 in lbs

Tube htr: 25, 30 and 25 in lbs

  342   Tuesday, October 22, 2013, 15:20 Rick Maharaj      Problems/SolutionsTarget Heater Conductor Block Insulators Replaced

The Conductor insulating blocks - ITD053C and ITD054C - that secure the target heater and coil conductor blocks were replaced. The existing ones were cracked and fell apart upon removal.

Attachment 1: Source_Tray_TGHT_and_COIL_insulators_replaced_2013-10.pdf
Source_Tray_TGHT_and_COIL_insulators_replaced_2013-10.pdf
  3   Wednesday, September 14, 2011, 15:40 Anders MjosTaC#1LP-SISITETM138634-636833-6In progressTaC#1 installed and pumping down.

Wednesday, September 14, 2011, 15:39: Vacuum at 1.3e-5 torr 

Thursday, September 15, 2011, 08:59: Vacuum at 2.9e-7 torr. Water flowing and vacuum stable. 

  1018   Friday, August 09, 2024, 21:08 Ferran Boix PamiesTa#67 Thin foils LP-SISITETM445447-14 45235-10In progressTa#67 thin foil retesting

Friday, August 09, 2024, 21:07 Insulators, retainer and Re foil have been replaced, source cup machined so the ion source does not short against it. Venting TS now.

Friday, August 09, 2024, 22:17 Roughing.

Friday, August 09, 2024, 22:35: TP1B on. - AS

Friday, August 09, 2024, 22:42: TP1A on. - AS.

Friday, August 09, 2024, 22:50: Both TP at speed. 2.65e-05T Vacuum. FS#5 open.

Friday, August 09, 2024, 22:52: PS on. - AS.


AS:

Saturday, August 10, 2024, 07:02: TGHT / TBHT @ 26 / 5 A. BIAS / EE / EZL @ 1 / -0.5 / 1 kV. TGHT tapped back down to 5 A. 

Saturday, August 10, 2024, 07:05: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.

Saturday, August 10, 2024, 07:27: Halt ramping @ 45 / 45 A. Set auto-ramping TGHT / TBHT to 500 / 230 @ 2 A per min. Optics are set.

Saturday, August 10, 2024, 09:59: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. TGHT / TBHT @ 321 / 230 & still ramping. One spark on tap up.

Saturday, August 10, 2024, 10:02: Small peaks on RPM0A & RPM0B. No signal on FC0. One spark*.

Saturday, August 10, 2024, 10:07: Spark* 

Saturday, August 10, 2024, 10:11: BIAS / EE / EZL @ 1 / -0.5 / 1 kV. TGHT / TBHT @ 344 / 230 & still ramping.

Saturday, August 10, 2024, 11:35: BIAS / EE / EZL @ 30 / -1.5 / 13 kV 

Saturday, August 10, 2024, 11:38: 1 spark* 

Saturday, August 10, 2024, 11:40: TGHT / TBHT @ 500 / 230 A. FC0 & wire scans produced signals / peaks. 

Saturday, August 10, 2024, 11:45: Starting mass scan. 

Saturday, August 10, 2024, 12:17: Mass scan taken. Wire scans on Mass 27 taken. Signals noted on mass 40 & 138 approx. Also of note. One large spark. Steerers reset. Signal on TGHT current.

https://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2024_07_26_Ta_67_thinfoil_1st_massscan.txt

Saturday, August 10, 2024, 12:21: Begin HV Check.

Saturday, August 10, 2024, 12:24: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.

Saturday, August 10, 2024, 12:28: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.

Saturday, August 10, 2024, 12:44: Began sparking after 40. Brought back down 

Saturday, August 10, 2024, 12:56: HV @ 0 kV. 

Saturday, August 10, 2024, 13:05: BIAS / EE / EZL @ 30 / -1.5 / 13 kV 

Saturday, August 10, 2024, 13:07: BIAS / EE / EZL @ 35 / -1.8 / 15 kV 

Saturday, August 10, 2024, 13:10: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.

Saturday, August 10, 2024, 13:24: Spark* reset optics. 

Saturday, August 10, 2024, 13:44: BIAS / EE / EZL @ 30 / -1.5 / 13 kV  

Saturday, August 10, 2024, 14:03: HV to 0 kV. 

Saturday, August 10, 2024, 14:12: Begin Auto-cooling @ 2 A per min. 


Monday, August 12, 2024, 05:43: Sources Off. IV4 Closed.

Monday, August 12, 2024, 05:45: IG1 & Chamber TP off. 

Monday, August 12, 2024, 07:46: TS Computer rebooted. IV4 reset. PS off. Venting.

Attachment 1: ITE-TM4-Ta#67-LP-SIS_Thin_Foil.docx
  882   Friday, June 25, 2021, 11:18 Aaron SchmidtTa#62LP-SISITETM444691-444378-4DoneTa#62 Conditioning - New

Replacement Ta target for the previous one (44139-10) https://elog.triumf.ca/TIS/Test-Stand/880

Friday, June 25, 2021, 11:16: Roughing.

Friday, June 25, 2021, 11:55: TP1B started.

Friday, June 25, 2021, 12:00: TP1B on. TP1 A started.

Friday, June 25, 2021, 12:08: IG1 on.

Friday, June 25, 2021, 12:23: Vacuum @ 1.06E-05T. Open waterline FS#5.

Friday, June 25, 2021, 12:26: Vacuum @ 9.97E-06T. OK.

Friday, June 25, 2021, 12:30: Power / sources PS on.

Friday, June 25, 2021, 12:34: Full check for remote use. IV4 open (OK)

Vacuum @ 6.70e-06T

TGHT / TBHT @ 10 / 10 A

BIAS / EE / EZL @ 1 / -0.1 / 0.5 kV.

Ready for operation.

Friday, June 25, 2021, 12:39: All back to 0 Kv / 0 A. Wait for vacuum stabilization.


Sunday, June 27, 2021, 03:55: Auto-ramping TGHT / TBHT to 500 / 150 A @ 2 A per min.

Sunday, June 27, 2021, 04:04: BIAS / EE / EZL @ 20 / -1.0 / 10 kV. 

Sunday, June 27, 2021, 09:36: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

Sunday, June 27, 2021, 10:07: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.  

Sunday, June 27, 2021, 10:16: TGHT / TBHT @ 580 / 230 A. Vacuum @ 1.25e-06T.

Sunday, June 27, 2021, 11:20: Mass & wire scans complete. Vacuum @ 1.14e-06T. Auto-cooling @ 2 A per min.

Sunday, June 27, 2021, 15:07: BIAS / EE / EZL @ 0 kV. TGHT still cooling.  


Monday, June 28, 2021, 06:17: IV4 closed (Needs reset). Sources, IG1, turbo pumps, off 

Monday, June 28, 2021, 08:22: Power off. IV4 reset. Venting.

Attachment 1: Ta#62_44691-4_Conditioning_-_R.docx
Attachment 2: Ta#62_44691-4_Conditioning..docx
Attachment 3: ITE-TM4-Ta#62-LP-SIS_Test_Stand.docx
  880   Monday, June 21, 2021, 11:53 Aaron SchmidtTa#62LP-SISITETM444139-1044378-4FailedTa#62 Conditioning - 2

Replace 9-pin back to normal grounded setup. Re-salt Ta#62. (Cu Gaskets in-use on FS#5)

Monday, June 21, 2021, 11:30: Roughing chamber.

Monday, June 21, 2021, 11:50: Removed backing window. Roughing beam line side.

Monday, June 21, 2021, 12:01: Multimeters removed. Back HV rack re-grounded. TP6 & TP2 on.

Monday, June 21, 2021, 12:02: TP1B on.

Monday, June 21, 2021, 12:13: TP1A on.

Monday, June 21, 2021, 12:21: IG1 on.

Monday, June 21, 2021, 14:37: Vacuum @ 3.96e-06T. Open FS#5

Monday, June 21, 2021, 14:39: Vacuum @ 3.76e-06T.

Monday, June 21, 2021, 14:42: Power / Sources on.

Monday, June 21, 2021, 14:43; IV4 opened & Optics on


Tuesday, June 22, 2021, 07:40: Quick system check ok.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 23.7 4.02
 TBHT 24.2

3.18

 COIL + EE 23.6 5.11
 TGHT 23.8 5.64

Tuesday, June 22, 2021, 07:42: Auto-ramping TGHT / TBHT to 300 / 150 A @ 3 A per min.

Tuesday, June 22, 2021, 09:36: TGHT / TBHT @ 300 / 150 A. BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Tuesday, June 22, 2021, 09:38: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

Tuesday, June 22, 2021, 09:46: External / cage sparks* Multiple.

Tuesday, June 22, 2021, 09:58: Turn down BIAS to 25 kV.

Tuesday, June 22, 2021, 12:45: BIAS to 30 kV.

Tuesday, June 22, 2021, 13:05: Odd. There was activity on FC0 right when the HV was turned on before the 580 ramp up. Now, no activity on FC0, or wire scans. Turning HV down / off.

Tuesday, June 22, 2021, 13:10: BIAS / EE / EZL @ 0 kV.

Tuesday, June 22, 2021, 13:41: Rear cage opened. Digital multi-meter was removed.

Tuesday, June 22, 2021, 13:48: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Tuesday, June 22, 2021, 13:57: No beam. Auto-cooling @ 3 A per min.

Tuesday, June 22, 2021, 16:23: HV power off. Optics off. IV4 off. TGHT still cooling.


Wednesday, June 23, 2021, 04:31: IG1 & turbo pumps off. 

Wednesday, June 23, 2021, 06:00: Venting. Power off. FS#5 purged.

Attachment 1: Ta#62_Conditioning_-_2.docx
  876   Monday, June 07, 2021, 13:45 Aaron SchmidtTa#62LP-SISITETM444139-1044378-4In progressTa#62 Conditioning

Monday, June 07, 2021, 13:44: Roughing.

Monday, June 07, 2021, 14:16: TP1B on. (Tripped shortly after?)

Monday, June 07, 2021, 14:32: Unstable. Venting.

Monday, June 07, 2021, 15:05: Changed gaskets. Left side suspect. Roughing.

Monday, June 07, 2021, 15:35: TP1B on.

Monday, June 07, 2021, 15:42: TP1B up to speed.

Monday, June 07, 2021, 15:45: TP1A on.

Monday, June 07, 2021, 16:01: IG1 on.

Monday, June 07, 2021, 16:02: FS#5 opened. No response on backing lines. TSG:IG1 ok.


Tuesday, June 08, 2021, 08:01: Power / sources on.

Tuesday, June 08, 2021, 08:07: Reset / CFG optics & steering.

Tuesday, June 08, 2021, 08:08: TGHT / TBHT @ 10 A ok. BIAS / EE / EZL @ 5 / -0.5 / 1 kV. Quick system check ok.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 21.9 4.02
 TBHT 22.4

3.15

 COIL + EE 21.9 4.99
 TGHT 22.0 5.58

Tuesday, June 08, 2021, 08:13: Auto ramping TGHT / TBHT to 350 / 150 @ 2 A per min.

Tuesday, June 08, 2021, 08:19: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Small spark near 30 kV while bringing up the HV.

Tuesday, June 08, 2021, 08:25: IV4 open. Optics set minus TPS:CB2. Shows as green 'on', set to 500V, however read back shows as 0 V.

Tuesday, June 08, 2021, 12:44: Auto ramping TGHT / TBHT to 580 / 230 @ 2 A per min. 

Tuesday, June 08, 2021, 15:53: Beam on FC0 ok. Optics set minus TPS:CB2, however FC6 is disconnected. auto-cooling @ 3 A per min.

Tuesday, June 08, 2021, 18:32: Auto-cooling halted. TGHT @ 104.3 A. 


Wednesday, June 09, 2021, 07:13: Auto-cooling continued @ 2 A per min. 

Wednesday, June 09, 2021, 08:37: HV off. Attempts made to restart TPS:CB2 unsuccessful. Controls notified.

Wednesday, June 09, 2021, 10:33: Power /  sources off. FS#5 purged. IV4 closed. IG1 & IG6 off. All turbo pumps off.

Wednesday, June 09, 2021, 11:52: Venting VV1 & VV6.

 

Attachment 1: Ta#62_Conditioning_-_1.docx
  789   Wednesday, March 11, 2020, 13:31 Aaron SchmidtTa#60LP-SIS  44139-1343515-5In progressTa#60 w/ EE testing - 2

Thermocouples installed on EE. Double checked continuity & used a heat gun.

Wednesday, March 11, 2020, 13:30: Roughing.

Wednesday, March 11, 2020, 15:03: Turbo pumps on, interlocks by-passed (No water at the moment) 

Wednesday, March 11, 2020, 15:10: IG1 on.


Thursday, March 12, 2020, 06:08: Vacuum @ 2.33e-06T. Opening waterlines.

 Thursday, March 12, 2020, 06:11: Waterlines all open. Vacuum Stable @ 2.31e-06T

Thursday, March 12, 2020, 06:13: Bypass on TP1A & B removed.

Thursday, March 12, 2020, 06:18: Power / Sources on TGHT / TBHT @ 0 / 0 A.

Thursday, March 12, 2020, 06:20: Auto-ramping TGHT / TBHT to 250 / 150 A @ 4 A per min.

Thursday, March 12, 2020, 07:34: Auto-ramping TGHT / TBHT to 350 / 200 A @ 4 A per min.

Thursday, March 12, 2020, 08:02: Auto-ramping TGHT / TBHT to 450 / 230 A @ 4 A per min.

Thursday, March 12, 2020, 08:30: Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.

Thursday, March 12, 2020, 08:55: Ramping aborted. TGHT / TBHT @ 488 / 230 A. Vacuum limit reached at 3.30e-06T.

Thursday, March 12, 2020, 08:56: Vacuum limit increased to 5.0e-06T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.

Thursday, March 12, 2020, 09:27: TGHT / TBHT @ 580 / 230 A. Temperatures recorded.

W/ Water cooling on EE

 TGHT / TBHT Current (A) EE Temp (A - T1 - Red/Black wire - 1,2)
[C]
EE Temp (B - T2 - White/Black wire 8,9)
[C]
0 / 0 17.7 17.8
250 / 150 26.4 28.1
350 / 200 34.1

39.0

450 / 230 41.4 48.0
580 / 230 43.1 49.0

Thursday, March 12, 2020, 09:31: Auto-cooling @ 6A per min.

Thursday, March 12, 2020, 11:09: PS off. Lock up. Remove HV cage for FS#3 EE route & water purge.

Thursday, March 12, 2020, 11:27: PS on. Locks off. FS#3 re-routed (K line - EE isolated). Water on. Vacuum ok @ 2.07e-06T

W/O Water cooling on EE

 TGHT / TBHT Current (A) EE Temp (A - T1 - Red/Black wire - 1,2)
[C]
EE Temp (B - T2 - White/Black wire 8,9)
[C]
0 / 0 15.5 15.6
250 / 150 26.6 27.6
350 / 200 35.0

38.9

450 / 230 42.6 48.1
580 / 230 46.3 51.9
580 / 230 @ 2:41 pm 43.3 49.3

Thursday, March 12, 2020, 11:28: Power / Sources on TGHT / TBHT @ 0 / 0 A.

Thursday, March 12, 2020, 11:29: Auto-ramping TGHT / TBHT to 250 / 150 A @ 4 A per min.

Thursday, March 12, 2020, 12:33: Auto-ramping TGHT / TBHT to 350 / 200 A @ 4 A per min.

Thursday, March 12, 2020, 13:02: Auto-ramping TGHT / TBHT to 450 / 230 A @ 4 A per min.

Thursday, March 12, 2020, 13:28: Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.

Thursday, March 12, 2020, 14:11: TGHT / TBHT @ 580 / 230 A. Temperatures recorded.

Thursday, March 12, 2020, 14:41: Auto-cooling @ 4A per min.


Tuesday, March 17, 2020, 05:26: IG1 & turbo pumps off. Water lines closed for FS#3 & HS.

Tuesday, March 17, 2020, 05:31: Waterlines FS#5 & FS#3 purged.

Tuesday, March 17, 2020, 07:08: Venting.

Attachment 1: Ta#60_-_TS_Pre-condition_-_EE_Test_-_2.docx
  785   Thursday, February 20, 2020, 11:41 Aaron SchmidtTa#60LP-SIS  44139-1343515-5In progressTa#60 w/ EE testing

 Ta#60 (Unconditioned) - Salts in.

Thursday, February 20, 2020, 14:04: Roughing.

Thursday, February 20, 2020, 14:38: Turbo pumps on (Leak check in am).

Thursday, February 20, 2020, 14:43: IG1 on.


Friday, February 21, 2020, 06:36: Waterlines opened. No vacuum response. Vacuum ok @ 8.69e-07T.

Friday, February 21, 2020, 06:38: Turbo pumps off.

EE Thermocouples req'd.

Friday, February 21, 2020, 11:15: Vented.

9-pin removed. Thermocouples installed.

Friday, February 21, 2020, 13:52: Roughing.

Friday, February 21, 2020, 14:24: Turbo pumps on.


EE Waterline - On

Wednesday, February 26, 2020, 07:40: Waterlines re-opened. Vacuum ok. @ 3.51e-07T

Wednesday, February 26, 2020, 07:43: Power / sources on.

Wednesday, February 26, 2020, 07:45: Auto ramping TGHT / TBHT @ 2 A per min to 250 / 150 A.

 TGHT / TBHT Current (A) EE Temp (A - T1 - Upper left)
[C]
EE Temp (B - T4 - Lower right)
[C]
 250 / 150 20.8 24.0
 350 / 200 22.5

29.7

 450 / 230 20.1 30.9
 580 / 230 14.5 28.8
580 / 230 @ 2:52 pm 6.2 21.6

Wednesday, February 26, 2020, 09:52: Auto ramping TGHT / TBHT @ 2 A per min to 350 / 200 A.

Wednesday, February 26, 2020, 11:04: Auto ramping TGHT / TBHT @ 2 A per min to 450 / 230 A.

Wednesday, February 26, 2020, 11:57: Auto ramping TGHT / TBHT @ 2 A per min to 580 / 230 A.

Wednesday, February 26, 2020, 13:03: TGHT / TBHT @ 580 / 230 A.

Wednesday, February 26, 2020, 14:52: Temp check (thermocouple reversed on T1?)

Wednesday, February 26, 2020, 14:54: Auto-cooling @ 2A per min.


Thursday, February 27, 2020, 06:30: Power/sources off, locked out. FS#3 purged. Cage open.

Thursday, February 27, 2020, 07:20: Line K (EE) disconnected from FS#3. Old fitting swapped for new one. See https://elog.triumf.ca/TIS/Test-Stand/786.

No water/cooling running into EE.

Thursday, February 27, 2020, 07:26: All waterlines open. Vacuum ok.

Thursday, February 27, 2020, 07:28: Power / Sources on.

 TGHT / TBHT Current (A) EE Temp (A - T1 - Upper left)
[C]
EE Temp (B - T4 - Lower right)
[C]
0 / 0 22.8 22.9
 50 / 25 22.6 22.7
100 / 50 22.6

22.6

150 / 100 22.2 23.3
200 / 150 22.0 24.9
200 / 150 7am Day 2 21.2 23.9
250 / 200 23.3 29.3
300 / 230 22.4 30.6
350 / 230 19.2 27.7
450 / 230 18.5 29.7
580 / 230 13.4 27.3

Thursday, February 27, 2020, 07:35: Auto ramping TGHT / TBHT @ 2 A per min to 50 / 25 A.

Thursday, February 27, 2020, 08:00: Auto ramping TGHT / TBHT @ 2 A per min to 100 / 50 A.

Thursday, February 27, 2020, 08:56: Auto ramping TGHT / TBHT @ 2 A per min to 150 / 100 A.

Thursday, February 27, 2020, 10:29: Auto ramping TGHT / TBHT @ 2 A per min to 200 / 150 A.


Friday, February 28, 2020, 06:56: Auto ramping TGHT / TBHT @ 2 A per min to 250 / 200 A.

Friday, February 28, 2020, 07:38: Auto ramping TGHT / TBHT @ 2 A per min to 300 / 230 A.

Friday, February 28, 2020, 09:54: Auto ramping TGHT / TBHT @ 2 A per min to 350 / 230 A.

Friday, February 28, 2020, 13:20: Auto ramping TGHT / TBHT @ 2 A per min to 450 / 230 A.

Friday, February 28, 2020, 14:15: Auto ramping TGHT / TBHT @ 2 A per min to 580 / 230 A.

Friday, February 28, 2020, 15:42: Last temperature measurement Taken. TGHT / TBHT @ 580 / 230 A.

Friday, February 28, 2020, 15:44: Auto-cooling @ 2A per min.


Monday, March 02, 2020, 07:37: Power / Sources off. Waterlines purged (A little over 2000 PSI left in the N Bottle)

Monday, March 02, 2020, 07:38: IG1 & Turbo pumps off.

Attachment 1: 20200221_134828.jpg
20200221_134828.jpg
Attachment 2: 20200221_134939.jpg
20200221_134939.jpg
Attachment 3: Ta#60_-_TS_Pre-condition_-_EE_test_-_1.docx
  462   Friday, September 11, 2015, 11:43 Anders MjosTa#46HP-SISITETM4  DoneTa#46 conditioning

EE is ST-200 material (AlN)

Friday, September 11, 2015, 11:0: Roughing

Friday, September 11, 2015, 12:12: Turbos started.

Friday, September 11, 2015, 12:22: Turbos at speed. Vacuum at 2.2E-5 T

Friday, September 11, 2015, 14:02: RGA on.


Monday, September 14, 2015, 08:05: Opened water for HS circuit. Vacuum stable at 2.3E-7 T. No response on RGA.

Monday, September 14, 2015, 08:08: Opened IV4

Monday, September 14, 2015, 08:11: Starting Target Heat. TGHT/TBHT 580 / 200 A at 2 / 1 A/min. Good/bad vacuum 4E-6 / 6E-6 T

Monday, September 14, 2015, 08:12: Interlock for BIAS does not clear although EE is on. Interlock cleared when beam line elements were turned on

Monday, September 14, 2015, 08:20: BIAS/EZL/EE at 30 / 15 / 1.5 kV

Monday, September 14, 2015, 08:25: Returned MB1 to remote control

Monday, September 14, 2015, 13:28: Target at temperature

Monday, September 14, 2015, 15:06: Heating TBHT to 230 A 


Tuesday, September 15, 2015, 15:03: EE to 2 kV

Tuesday, September 15, 2015, 16:39: EE to 1.5 kV

Tuesday, September 15, 2015, 17:01: Starting target cool down


Wednesday, September 16, 2015, 09:01: HV and source off. Closed IV4. Turbos off

Wednesday, September 16, 2015, 12:52: RGA off. Venting

Attachment 1: Ta#46.docx
  337   Friday, September 27, 2013, 11:41 Anders MjosTa#41HP-SISITWTM439069-538817-10DoneTa#41 Conditioning

Friday, September 27, 2013, 11:41: Roughing

Friday, September 27, 2013, 12:08: Turbos started

Friday, September 27, 2013, 12:16: Turbos at speed.

Friday, September 27, 2013, 12:18: Vacuum at 1.5E-5 T


Monday, September 30, 2013, 08:41: Opened water supply. Vacuum stable at 1.5E-7 T

TGHT Q=5.5 T=28.0
TBHT Q=5.8 T=28.0

Monday, September 30, 2013, 15:19: Flow sensor moved from TBHT to HS

TGHT Q=5.5 T=27.9
HS      Q=3.6 T=27.8


Tuesday, October 01, 2013, 12:08: Taget Biased to 30kV.


Wednesday, October 02, 2013, 08:50: Started autoramping to 580A/230A

Wednesday, October 02, 2013, 08:50: Opened IV4

Wednesday, October 02, 2013, 10:51 TGHT/TBHT 250A / 239A
TGHT Q=5.5 T=28.5
HS      Q=3.6 T=29.2
SUPPLY (ext)    27.3
RETURN (ext)  27.8

Wednesday, October 02, 2013, 13:28 TGHT/TBHT 250A / 570A
TGHT Q=5.5 T=30.4
HS      Q=3.6 T=33.4
SUPPLY (ext)    27.4
RETURN (ext)  29.3

Wednesday, October 02, 2013, 13:30: TBHT was starting to limit on voltage. Increased voltage limit to 2.4V.


Thursday, October 03, 2013, 08:21: TMS:TP2 timed out over night.

Magnet PS breaker tripped during a mass scan yesterday. Reset breaker and cleared interlocks.

TGHT Q=5.5 T=30.4
HS      Q=3.6 T=34.0
SUPPLY (ext)    27.3
RETURN (ext)  29.3

Thursday, October 03, 2013, 08:28: Started mass scan 200 -> 0 m/q. FC0 7.5E-8 A

Thursday, October 03, 2013, 14:29
TGHT Q=5.5 T=30.6
HS      Q=3.6 T=33.9
SUPPLY (ext)    27.4
RETURN (ext)  29.6

Thursday, October 03, 2013, 15:14: Lowered TBHT:RDCUR  to 230A.

Thursday, October 03, 2013, 15:37: Increased EE to -2000 V

Thursday, October 03, 2013, 16:22
TGHT Q=5.5 T=30.6
HS      Q=3.6 T=33.9
SUPPLY (ext)    27.5
RETURN (ext)  29.6


Friday, October 04, 2013, 08:08
TGHT Q=5.5 T=30.6
HS      Q=3.5 T=33.9
SUPPLY (ext)    27.5
RETURN (ext)  29.3

Mass scan started.

Friday, October 04, 2013, 08:46: Cool down started.

Friday, October 04, 2013, 13:35: TPS:IV4 closed

Friday, October 04, 2013, 13:41: Source debiased.


Tuesday, October 15, 2013, 09:56: Turbos stopped. Vacuum at 1.15 E-7 T

Tuesday, October 15, 2013, 12:44: Venting


After the conditioning, some oxidation (?) from the standards (?) were found on the Plasma Electrode and around the Target Tube. See attachment

Attachment 1: Ta#41_EE_After_Test_Stand.pdf
Ta#41_EE_After_Test_Stand.pdf
  295   Thursday, April 18, 2013, 13:50 Anders MjosTa#40HP-SISITETM438295-4 DoneTa#40 stored under vacuum

Target installed at the Test Stand after an inspection in the lab. EE was cleand. All bolts torqued to 130 in lbs

Thursday, April 18, 2013, 13:48: Rouging

Thursday, April 18, 2013, 14:11: Starting turbos

Thursday, April 18, 2013, 14:20 : Turbos at speed

Thursday, April 18, 2013, 14:21 : Vacuum at 2.3E-5 T 


Friday, April 19, 2013, 08:23: Opened cooling water. Vacuum stable at 9.6E-6 T


Vacuum is somewhat higher than expected (5.2E-7 T) . Will went and clean the o-rings on the doors.

Monday, April 22, 2013, 09:32: Turbos off.

Monday, April 22, 2013, 10:57: Venting

Monday, April 22, 2013, 12:25: Vented

Monday, April 22, 2013, 14:09: Roughing

Monday, April 22, 2013, 14:31: Started Turbos

Monday, April 22, 2013, 14:40: Turbos at speed

Monday, April 22, 2013, 14:41: Vacuum at 1.8E-5 T


Tuesday, April 23, 2013, 09:52 : Vacuum at 2.6E-7 T - already an improvement from yesterday


Thursday, April 25, 2013, 08:47: Stopped turbos. A test target with at new FEBIAD coil will be tested.

Thursday, April 25, 2013, 13:27: Venting

  287   Monday, March 25, 2013, 11:39 Anders MjosTa#39LP-SISITWTM1  DoneTa#39 commissioning

Target installed with 130 in lbs torque on all bolts.

Monday, March 25, 2013, 11:36: Roughing

Monday, March 25, 2013, 11:54: Starting turbos

Monday, March 25, 2013, 12:02: Both turbos at speed

Monday, March 25, 2013, 12:04: Vacuum at 2E-5  Torr

Tuesday, March 26, 2013, 08:03: Opened water supply. Vacuum stable at 3E-7 Torr


Tuesday, March 26, 2013, 09:11

All P/S switched on.


ISAC Ops will condition this target as a training exercise.

ISAC ops e-log
ISAC ops e-log 2

Wednesday, March 27, 2013, 13:41: ISAC ops called to inform that the target has been cooled down and bias is off.


Thursday, March 28, 2013, 08:22: Closed TPS:IV4 and switched off turbos.

Thursday, March 28, 2013, 13:27: Venting

Thursday, March 28, 2013, 13:33: Water purged

  658   Wednesday, April 25, 2018, 09:50 Aaron SchmidtTa (test)LP-SIS  41177-3 In progressTa test and window change

Window changed on view port. Ta target prepared for Aurelia's tests.

***Note*** No Ta window foils on the end plates. Initial ramping to on the TGHT to 300 A. Follow up in increments of 50 A and check the right door window temperature.

Wednesday, April 25, 2018, 09:47: Roughing both the Evap/box end and beam end.

Wednesday, April 25, 2018, 10:27: All 4 turbo pumps started.

Wednesday, April 25, 2018, 10:49: Both Ion gauges on.

Wednesday, April 25, 2018, 14:56: RGA on.


Thursday, April 26, 2018, 06:54: Water lines opened. No response on RGA. Vacuum stable @ 4.23e-07T

Thursday, April 26, 2018, 06:56: Power/sources on.

Thursday, April 26, 2018, 07:00: Auto ramping TGHT  to 300 @ 2A per min.

Thursday, April 26, 2018, 07:05: IV4 opened. 

Thursday, April 26, 2018, 08:50: Door temp @ 25 C @ left window.

Thursday, April 26, 2018, 09:30: 300A reached. Door temp @ 26 C @ left window.

Thursday, April 26, 2018, 13:01: 550A Reached. Door temp @ 29 C @ left window.


Monday, April 30, 2018, 07:05: IV4 closed, RGA off.

Monday, April 30, 2018, 07:10: Ion gauge off. Turbo pumps off.

Monday, April 30, 2018, 11:00: Venting. Purging water lines.

Attachment 1: TS-2018-04-25-14-55.rga
Attachment 2: Ta_target_heating_test_-_Test_stand.docx
  514   Tuesday, June 14, 2016, 10:46 Aaron Schmidt LP-SIS     TUBE ONLY - NO PLASMA ELECTRODE

Tuesday, June 14, 2016, 10:46: Begin roughing.

Tuesday, June 14, 2016, 11:16: Turbo pumps started.

Tuesday, June 14, 2016, 11:23: Ion gauge on.


Wednesday, June 15, 2016, 07:45: Water opened. RGA ok. Vacuum stable @ 1.9E-7T. Power/sources on.

Wednesday, June 15, 2016, 08:24: BIAS / EZL / EE to 30 / 13 / 1.5 kV

Wednesday, June 15, 2016, 08:24: Ramping TBHT to 120 A at 1 A/min

Wednesday, June 15, 2016, 10:23: EZL P/S was not on. Switched on and set to 13 kV

Wednesday, June 15, 2016, 15:05: Ramping down.


Thursday, June 16, 2016, 08:57: IV4 reset. RGA off. Ion gauge off. Turbo pumps off.

Thursday, June 16, 2016, 13:22: Water lines purged. Power/sources off. Venting.

Attachment 1: Tube_only_SIS_test-all-160615.zip
Attachment 2: 2016-06-13.zip
Attachment 3: 2016-06-15.zip
Attachment 4: re-em-plots.zip
  515   Thursday, June 16, 2016, 14:34 Aaron Schmidt LP-SIS     TUBE ONLY (3)

Thursday, June 16, 2016, 14:33: Roughing. Plasma Electrode re-attached. Salts replaced.

Thursday, June 16, 2016, 15:12: Turbo pumps started.

Thursday, June 16, 2016, 15:22: Ion gauge on.


Friday, June 17, 2016, 08:32: Water opened. RGA ok. Vacuum stable @ 2.4E-7T. Power/sources on.


Saturday, June 18, 2016, 09:31: Cool down started.


Monday, June 20, 2016, 09:48: Sources/power/voltages off.

Monday, June 20, 2016, 10:06: IV4 reset. Water lines purged.

 Monday, June 20, 2016, 10:11: RGA off. Ion gauge off. Turbos off.

Monday, June 20, 2016, 11:50: Venting

Attachment 1: Tube_only-full-fernando_test-160617-PE-RPE.zip
Attachment 2: Tube_only-full-fernando_test-160617-WPE.zip
  512   Thursday, June 09, 2016, 14:56 Aaron Schmidt LP-SIS     TUBE ONLY

Thursday, June 09, 2016, 14:50: Begin roughing.

Thursday, June 09, 2016, 15:34: Turbo pumps started.

Thursday, June 09, 2016, 15:42: Ion gauge on.


Friday, June 10, 2016, 08:27: RGA on.

Friday, June 10, 2016, 08:35: Water opened. RGA ok. Vacuum stable @ 1.9E-7T

Friday, June 10, 2016, 08:50: BIAS/EZL/EE to 30/13/1.5kV.

Friday, June 10, 2016, 08:52: Auto ramping TBHT only @ 2A min to 50A.

Friday, June 10, 2016, 10:02: Auto ramping TBHT only @ 1A min to 100A.

Friday, June 10, 2016, 11:14: Continue ramping to 150 A -AM

Friday, June 10, 2016, 11:28: Stopped ramping ag 110 A -AM


Monday, June 13, 2016, 08:12: Auto ramping TBHT only @ 1A min to 150A.

Monday, June 13, 2016, 09:59: Ramping to 150 A - AM


Monday, June 13, 2016, 15:51: Ramping down.


Tuesday, June 14, 2016, 07:47: IV4 Reset. Ion gauge off. Turbos off.

Tuesday, June 14, 2016, 07:52: Power/sources off. Water purged.

Tuesday, June 14, 2016, 09:20: Venting.

Attachment 1: Tube_only_SIS_test.zip