Friday, August 10, 2012, 15:29, Pierre Bricault, NA, LP-FEBIAD, , , NA, NA, , finishing the gas installation and its pump
|
1524H Start small pump.
1529H stop the pump.
|
Saturday, August 11, 2012, 13:34, Pierre Bricault, NA, LP-FEBIAD, , , NA, NA, In progress, Test FEBIAD anode bias 120 V
|
|
Thursday, April 25, 2013, 13:32, Anders Mjos, Empty, LP-FEBIAD, , , Tube Only, 38307-9 , In progress, FEBIAD Coil test
|
Same target as in e-log entry https://elog.triumf.ca/TIS/Test-Stand/106
Thursday, April 25, 2013, 13:54: Roughing
Thursday, April 25, 2013, 14:25: Started turbos
Thursday, April 25, 2013, 14:33: Turbos at speed
Thursday, April 25, 2013, 14:33: Vacuum at 8.8E-6 T
Friday, April 26, 2013, 08:25: Cooling water supply opened. Vacuum stable at 2.2E-7 T
Friday, April 26, 2013, 13:35: Gas lines evacuated.
Testing Coil current vs Temperature before heating
COIL:RDCUR at 1.95A
COIL:RDVOL at 1.47V
COIL T/C at 86 deg C and still slowly increasing
Tuesday, April 30, 2013
Testing Coil current vs Temperature before heating
COIL:RDCUR at 3.96A
COIL:RDVOL 3.2 V Vacuum starts to increase (base 1.4E-7
COIL:RDVOL 3.8 V T/C at 150 C vacuum at 5E-7
COIL:RDCUR at 3.47A to reduce out-gassing T/C at 175 C
Tuesday, April 30, 2013, 12:39
COIL:RDCUR at 3.96A T/C 225 C
COIL:RDVOL 5.0 V T/C at 250 C vacuum at 6.2E-7
Tuesday, April 30, 2013, 13:00
COIL:RDCUR at 4.25A COIL:RDVOL at 5.7V T/C 290 C
Tuesday, April 30, 2013, 13:10
COIL:RDCUR at 4.15A COIL:RDVOL at 5.75V T/C 310 C
Tuesday, April 30, 2013, 14:53
COIL:RDCUR at 4.15A COIL:RDVOL at 5.85V T/C 320 C
Tuesday, April 30, 2013, 16:30
COIL:RDCUR at 4.15A COIL:RDVOL at 5.89V T/C 328 C
Wednesday, May 01, 2013, 08:16
COIL:RDCUR at 4.15A COIL:RDVOL at 5.95V T/C 350 C - P/S is voltage limited at 5.95V
Ramping down current to 0. T/C logger is required elsewhere.
Friday, May 03, 2013, 12:07: Pumping out gas line through vacuum chamber.
The anode cable has been reconnected (see e-log entry 297)
Friday, May 03, 2013, 14:17: BIAS and EE to 30kV and -800V
Friday, May 03, 2013, 14:24: Started heating TBHT to 280A at 1A/min
Monday, May 06, 2013, 08:46: TBHT @ 276A, Voltage limiting at 2.5V. Increased limit to 2.7V. TGHT to 280A and 2.52V. COIL temp ~100C
Monday, May 06, 2013, 09:48: COIL:RDCUR at 2.93A
Monday, May 06, 2013, 10:34: Coil temp ~240C. Increasing COIL:RDCUR to 3.52A COIL:RDVOL at 4.1V
Monday, May 06, 2013, 11:48: Coil temp 330C COIL:RDCUR at 3.52A RDVOL at 4.9V
Monday, May 06, 2013, 11:54: COIL:RDCUR at 3.9A
Monday, May 06, 2013, 12:56: RDVOL at 5.9V. Coil temp ~380C
Monday, May 06, 2013, 13:47: Cooling down target to correct anode connection.
Tuesday, May 07, 2013, 08:47: De-biased
Tuesday, May 07, 2013, 10:06: Corrected el. connections to cathode floating. Started tube heating to 280A
Wednesday, May 08, 2013, 12:12: De-biased
Wednesday, May 08, 2013, 12:12: Cooling down cathode 1A/min
Thursday, May 09, 2013, 15:22: TPS:IV4 closed |
Friday, October 31, 2014, 14:57, Anders Mjos, , LP-FEBIAD, , , Tube only, 38307-9, In progress, Test
|
Friday, October 31, 2014, 14:47: Starting turbos
Friday, October 31, 2014, 14:57: Turbos at speed. Vacuum at 2.9E-5 T
Monday, November 03, 2014, 10:08 : Opened HS water circuit. Vacuum stable at 1.7E-7 T
Monday, November 03, 2014, 10:22: Starting auto ramping to 228A on TBHT at 1 A/min
Monday, November 03, 2014, 13:44: Target at temperature. Opening IV4.
Monday, November 03, 2014, 14:45: IV4 closed
Monday, November 03, 2014, 15:00: Starting cool down. 1 A/min |
Friday, December 12, 2014, 14:09, Anders Mjos, , LP-FEBIAD, , , Tube only, , In progress, HV BIAS Test
|
BIAS current limit pot changed from 2.40 to 0.25
EZL current limit pot changed from 0.50 to 0.20
Testing max HV bias with Ray
Tested successfully to plc limit of 50kV.
Dave M updated limit to 59kV. the limit will reset to 50 kV if PLC is restarted
Friday, December 12, 2014, 14:43: BIAS at 59kV and 55 uA. EZL at 20kV and 73 uA. No sparking observed.
Tuesday, December 16, 2014, 09:12: BIAS and EZL to 40kV and 20kV
Tuesday, December 16, 2014, 09:53: BIAS at 50 kV. One spark w/vaccum response at 50 kV
Tuesday, December 16, 2014, 10:20: BIAS and EZL to 0 to try and restart TP1B TP6
Tuesday, December 16, 2014, 10:33: Both turbos restated. BIAS and EZL at 50 kV and 20 kV
Tuesday, December 16, 2014, 11:23: BIAS at 60 kV. One audible spark with vacuum response.
Tuesday, December 16, 2014, 11:37: Another spark took out TP1B and TP6 again.
Tuesday, December 16, 2014, 11:42: Restarted TP1B and TP6
EE power supply switched on
Wednesday, December 17, 2014, 10:19: BIAS at 60kV for 10 min. EZL at 20kV
Wednesday, December 17, 2014, 13:13 : 3h at 60 kV (see attached screen shot)
Wednesday, December 17, 2014, 13:24: BIAS off
Wednesday, December 17, 2014, 13:40: All power supplies ON. TBHT autoramping to 290 A (240 A0. 4A / min
Wednesday, December 17, 2014, 13:46: IV4 opened
Wednesday, December 17, 2014, 16:10: Source on at 30 kV (previously tested to 50 kV)
Thursday, December 18, 2014, 08:21 : Starget autoraming to 290 A (240 A). 4 A / min
Thursday, December 18, 2014, 08:48: 40 kV
Thursday, December 18, 2014, 08:57: 50 kV
Thursday, December 18, 2014, 09:18: 60 kV. Extracting 1E-7 A on FC0
Thursday, December 18, 2014, 09:29: Increased COIL and ANODE to 3.6 A and 60 V
Thursday, December 18, 2014, 10:11: Large spark? Vacuum in source box compromised 6E-4 T.
Thursday, December 18, 2014, 10:24: Closed IV4 (red, but closed - IG6 vacuum good). Stopping turbos. Vacuum is increasing on CG1.
Thursday, December 18, 2014, 10:26: Shutting off water supply.
Thursday, December 18, 2014, 10:29: Venting through turbo vent valves.
Thursday, December 18, 2014, 10:35: Closed turbo vent valves.
Thursday, December 18, 2014, 10:37: Roughing
Thursday, December 18, 2014, 10:42: Pumping curve changing slope abruptly around 30 T and again around 2.5 T
Thursday, December 18, 2014, 10:48: Stopped roughing
Thursday, December 18, 2014, 12:14 : Venting
Thursday, December 18, 2014, 13:43: Roughing
|
Thursday, April 02, 2015, 15:42, Anders Mjos, TM2 Test Target, LP-FEBIAD, , TM2, , 39230-1, Done, TM2 Test Target Conditioning
|
Thursday, April 02, 2015, 15:42: Roughing
Thursday, April 02, 2015, 16:12: Turbos started
Thursday, April 02, 2015, 16:22: Turbos at speed. Vacuum at 8.7E-6 T
Tuesday, April 07, 2015, 08:24: Opened water for HS. Vacuum stable at 1.1E-7 T
Tuesday, April 07, 2015, 08:25: Pumping on gas lines.
Tuesday, April 07, 2015, 08:37: Finished pumping.
Tuesday, April 07, 2015, 08:41: Opening gas valve to vacuum chamber
Tuesday, April 07, 2015, 08:42: RGA filament on.
Tuesday, April 07, 2015, 08:55: BIAS/EZL/EE to 30/14/1.5 kV
Tuesday, April 07, 2015, 08:55: COIL to 50 A, ANODE to 200 V
Tuesday, April 07, 2015, 09:01: Started auto-heating to 580/250 A at 2 A/min
Tuesday, April 07, 2015, 13:25 : Opened IV4
Tuesday, April 07, 2015, 15:10: Ramping TBHT to 290A
Wednesday, April 08, 2015, 09:27: Opening for Ne gas
Wednesday, April 08, 2015, 12:05: BIAS/EZL to 40/18.5 kV
Wednesday, April 08, 2015, 13:15 :BIAS/EZL/EE to 50/23.5/2.0 kV
Wednesday, April 08, 2015, 15:15: BIAS/EZL/EE to 30/14/1.5 kV
Thursday, April 09, 2015, 11:19: Starting target cool down
Thursday, April 09, 2015, 16:54: BIAS/EZL/EE to 30/30/1.5 kV
Thursday, April 09, 2015, 17:58: BIAS and source off.
Friday, April 10, 2015, 08:21: Closed gas supply
Friday, April 10, 2015, 08:23: Stopped turbos |
Friday, April 24, 2015, 12:26, Anders Mjos, , LP-FEBIAD, , TM2, , 39230-1, In progress, Testing new TM2 Source Tray
|
Photos on DocuShare
Friday, April 24, 2015
The source tray has been installed and inspected.
Friday, April 24, 2015, 12:32: Roughing
Friday, April 24, 2015, 13:33: Starting turbos. Vacuum at 0.24 T
Friday, April 24, 2015, 13:42: Turbos at speed.
Friday, April 24, 2015, 13:43: 3.5E-5 T
Leak check performed with RGA and He pressurized on water line incl GE line to 50 psi. Doors and ANODE line blank off He sprayed. No response.
RGA response to He confirmed with FEBIAD gas leak.
Monday, April 27, 2015, 12:00: Ge water open.
Monday, April 27, 2015, 12:03: Water open
Monday, April 27, 2015, 15:07: Electrical check completed OK. Test results attached. Tested low voltage on EZL, CB1, VCB1, CBC, EE, ANODE and BIAS
Monday, April 27, 2015, 15:15: Turbos stopped. Colimator connected to HS lines (60 kV). Should be on GND potential.
Monday, April 27, 2015, 16:00: Roughing
Monday, April 27, 2015, 16:30: Starting turbos
Monday, April 27, 2015, 16:40: Turbos at speed. Vacuum at 1.8E-5 T
Tuesday, April 28, 2015, 09:46: Starting auto-ramping of heaters to 100 / 100 A at 2 A/min 3E-6 / 4E-6 T good/bad vacuum limits.
Tuesday, April 28, 2015, 10:38: Continue auto-ramping TGHT to 200 A
Tuesday, April 28, 2015, 11:15: Optics and steerers on.
Tuesday, April 28, 2015, 11:34: Continue auto-ramping TGHT to 250 A
Tuesday, April 28, 2015, 12:50: Continue auto-ramping TGHT/TBHT to 300 /150 A
Tuesday, April 28, 2015, 13:30: Continue auto-ramping TGHT/TBHT to 400 /200 A
Tuesday, April 28, 2015, 14:24: Continue auto-ramping TGHT/TBHT to 500 /250 A
Wednesday, April 29, 2015, 06:06: Starting auto-ramp down.
Wednesday, April 29, 2015, 09:09: ANODE to 200 V. No current.
Wednesday, April 29, 2015, 09:16 : ANODE to 300 V. No current.
Wednesday, April 29, 2015, 09:16: EE to 2kV. 691 uA
Wednesday, April 29, 2015, 09:17: ANODE off. EE to 1.5 kV
Wednesday, April 29, 2015, 09:20: BIAS/EZL at 5/5 kV
Wednesday, April 29, 2015, 09:26: BIAS/EZL at 7.5/5 kV
Wednesday, April 29, 2015, 09:32 : BIAS/EZL at 10/5 kV
Wednesday, April 29, 2015, 09:47: BIAS/EZL at 15/7.5 kV
Wednesday, April 29, 2015, 10:04: BIAS/EZL at 20/10 kV
Wednesday, April 29, 2015, 10:20: BIAS/EZL at 25/12.5 kV
Wednesday, April 29, 2015, 10:48: BIAS/EZL at 30/15 kV. 2 sparks in 10 min on BIAS
Wednesday, April 29, 2015, 10:54: No sparks for 10 min
Wednesday, April 29, 2015, 12:01: BIAS/EZL at 40/20 kV
Wednesday, April 29, 2015, 12:48: No spark for the last 15 min. 3 sparks in the last 30 min
Wednesday, April 29, 2015, 13:09: BIAS/EZL at 45/22.5 kV
Wednesday, April 29, 2015, 13:45: BIAS/EZL at 50/25 kV
Wednesday, April 29, 2015, 14:53: Sparking above 50 kV. Loosing EPICS communication.
Wednesday, April 29, 2015, 15:46: BIAS/EZL at 53/27.5 kV
Wednesday, April 29, 2015, 16:11: BIAS/EZL at 53/27.5 kV. No sparks for 15 min
Wednesday, April 29, 2015, 16:19: BIAS/EZL/EE off for today
Thursday, April 30, 2015, 08:37: BIAS/EZL at 40/20 kV. EE at 1.5 kV. IG1 at 7.1E-7 T
Thursday, April 30, 2015, 08:55: BIAS/EZL at 50/25 kV
Thursday, April 30, 2015, 09:10: 1 spark in the last 15 min
Thursday, April 30, 2015, 09:32: BIAS/EZL at 53/25 kV
Thursday, April 30, 2015, 09:42: No sparks for 10 min
Thursday, April 30, 2015, 09:53: BIAS/EZL at 54/25 kV
Thursday, April 30, 2015, 10:00: Sparking caused lost EPICS communication.Manually current limiting PS
Thursday, April 30, 2015, 10:25: BIAS/EZL at 53/25 kV
Thursday, April 30, 2015, 10:31: BIAS/EZL at 54/25 kV
Thursday, April 30, 2015, 10:47: BIAS/EZL at 55/25 kV
Thursday, April 30, 2015, 10:53: BIAS/EZL at 55/27.5 kV. No sparks for 5 min
Thursday, April 30, 2015, 10:57: No sparks for 10 min.
Thursday, April 30, 2015, 11:01: BIAS/EZL at 55/30 kV
Thursday, April 30, 2015, 11:17: No sparks for 30 min.
Thursday, April 30, 2015, 11:19: BIAS at 30 kV
Thursday, April 30, 2015, 11:36: ANODE to 200 V. COIL is limited in EPICS to 0A and 0V
Thursday, April 30, 2015, 11:41: Opened isolation valve
Thursday, April 30, 2015, 11:42: Autoramping heaters to 500 / 250 A at 4/2 A/min. Good vacuum 2E-6 T, bad vacuum 3E-6 T
Thursday, April 30, 2015, 12:01: No EZL sparks for 60 min
Thursday, April 30, 2015, 12:03: EZL to 14 kV
Thursday, April 30, 2015, 13:50: Continue ramping to 580 / 300 A at 1/1 A/min
Troubleshooting FEBIAD coil power supply
Thursday, April 30, 2015, 14:10: Pumping on gas lines.
Thursday, April 30, 2015, 14:18: Tripped heaters when opening gas line to vacuum.
Thursday, April 30, 2015, 14:20: Autoramping heaters 500 / 250 A at 6/3 A/min.
A large (water?) leak opened up with target close to max temperature. Water lines were pressurized in an attempt to identify the leaky line. The test yesterday were not conclusive and was repeated this morning with no He response. The vacuum did not improve over night.
Friday, May 01, 2015, 10:08: Venting
Left coil line removed.
Friday, May 01, 2015, 11:10: Roughing
Friday, May 01, 2015, 11:41: Started turbos
With the leak detector pumping on the left coil line, a large leak could be confirmed at the soldering site. |
Wednesday, May 13, 2015, 13:27, Anders Mjos, , LP-FEBIAD, , TM2, , 39230-1, In progress, Re-testing new TM2 Source Tray
|
NOTE: COIL PS is a 100 A supply, thus actual COIL current is 0.5x COIL set point.
Changed the FEBIAD connector blocks to have copper tubes exit below the block. Extended ANODE wire to allow it to be wrapped around Cu-tubes and keep it further away from the GE lines.
Wednesday, May 13, 2015, 13:45: Roughing
Wednesday, May 13, 2015, 14:13: Starting turbos
Wednesday, May 13, 2015, 14:23: Turbos at speed. Vacuum at 4.6E-5 T
Thursday, May 14, 2015, 09:27: He pressure tested waterlines to 70 psi He. No response on the RGA. Vacuum 3.3E-6 T
Thursday, May 14, 2015, 09:39: Opened water supply. No increase on the RGA or IG
Thursday, May 14, 2015, 10:04: Tested COIL to 50 A set point (= 25 A). Returned to 0 A.
Thursday, May 14, 2015, 10:09: Auto-ramping to 400 / 200 A at 4 / 2 A/min. Good/Bad vacuum 4E-6 / 5E-6 T
Thursday, May 14, 2015, 13:59: COIL at 50 A
Thursday, May 14, 2015, 21:57 : Starting cool down.
Friday, May 15, 2015, 06:25: Stopped turbos
Friday, May 15, 2015, 07:42 : Venting
C-seals installed.
Friday, May 15, 2015, 13:56: Roughing
Friday, May 15, 2015, 14:28 : Staring turbos
Friday, May 15, 2015, 14:38: Turbos ate speed. Vacuum at 3.9E-5 T
Tuesday, May 19, 2015, 07:31: Vacuum at 7.1E-7 T. Pumping on gas lines
Tuesday, May 19, 2015, 07:35: Water lines opened. Vacuum stable at 7.1E-7 T. No response on RGA
Tuesday, May 19, 2015, 07:43: Opened gas lines (SV5)
Tuesday, May 19, 2015, 07:47: Auto-ramping to 400 / 200 A at 4 / 2 A/min. Good/Bad vacuum 2E-6 / 4E-6 T
Tuesday, May 19, 2015, 08:46: ANODE and COIL to 200 V and 50 A
Tuesday, May 19, 2015, 09:39: Auto-ramping to 500 / 250 A at 2 / 1 A/min. Good/Bad vacuum 2E-6 / 4E-6 T
Tuesday, May 19, 2015, 10:54: Opened IV4
Tuesday, May 19, 2015, 11:14: Atuo-ramping to 270 A. BIAS/EZL/EE at 30 / 15 / 1.5 kV
Tuesday, May 19, 2015, 11:42: BIAS/EZL/EE to 20 / 10 / 1.5 kV
Wednesday, May 20, 2015, 09:55: Auto-ramping to 500 / 250 A at 4 / 2 A/min. Good/Bad vacuum 2E-6 / 4E-6 T
Wednesday, May 20, 2015, 09:57: BIAS/EZL/EE at 30 / 15 / 1.5 kV
Wednesday, May 20, 2015, 11:57: Auto-ramping to 580 / 290 A at 2 / 1 A/min.
Wednesday, May 20, 2015, 12:55: Vacuum excursion during beam tuning. Stopped turbos.
A leak was observed on the left coil conductor again. After inspecting the service cap, it was found that there was no water flow going through the left coil line due to differences in routing between the TM2 and the Test Stand source tray. A new coil line will be made and the water and electrical connections on the service cap will be reconfigured. |
Thursday, May 21, 2015, 17:26, Anders Mjos, , LP-FEBIAD, , TM2, , , In progress, Re-testing new TM2 Source Tray
|
Thursday, May 21, 2015, 17:26: Roughing
Thursday, May 21, 2015, 18:02: Turbos started
Thursday, May 21, 2015, 18:12: Turbos at speed. Vacuum at 4.7E-5 T
Friday, May 22, 2015, 08:00: Opened water. Vacuum stable at 3.4E-6 T. No response on RGA
Friday, May 22, 2015, 08:10: Pumping on gas line
Friday, May 22, 2015, 08:21: Opened gas line.
Friday, May 22, 2015, 08:30: Auto-ramping to 500 / 250 A at 4/2 A/min. Good/bad vacuum 4E-6 and 5E-6 T
Friday, May 22, 2015, 08:35: BIAS/EZL/EE to 10 / 10 / 1.5 kV. COIL 50 A, ANODE 200 V
Friday, May 22, 2015, 12:16: Opened IV4
Friday, May 22, 2015, 14:59: BIAS/EZL/EE to 30 / 15 / 1.5 kV
Friday, May 22, 2015, 15:29 : Auto-ramping to 580 / 270 A at 2/1 A/min.
Saturday May 23 15:10 TGHT: 7.51 V 580 A, TBHT: 2.23 V 270 A, ANODE 200 V 13.4 mA, FC0 1.5e-8 A, IG1 1.9e-6 T, COIL 0 V 0 A not responding, some bias sparking over last 7 hours
Monday, May 25, 2015, 09:07: EE current limiting. Started auto-cool down at 4/2 A/min. Vacuum 1.2E-6 T
Monday, May 25, 2015, 09:37: BIAS and EZL to 0
Monday, May 25, 2015, 10:34 : Closed IV4
Monday, May 25, 2015, 11:56 : Cool down complete. Stopped turbos.
Monday, May 25, 2015, 13:17: Venting
Monday, May 25, 2015, 13:25: HS cooling circuit purged.
Monday, May 25, 2015, 14:25: The EE water line was found to be touching the COIL lines on the source tray. |
Wednesday, May 27, 2015, 14:19, Anders Mjos, , LP-FEBIAD, , TM2, , , In progress, Re-testing new TM2 Source Tray
|
Wednesday, May 27, 2015, 14:19: Roughing
Wednesday, May 27, 2015, 14:50: Turbos started
Wednesday, May 27, 2015, 15:00: Turbos at speed. Vacuum at 1.6e-5 T
Thursday, May 28, 2015, 08:13: Water opened on HS line. Vacuum stable at 4.3E-7 T. No response on RGA
Thursday, May 28, 2015, 08:17: Pumping on gas line.
Thursday, May 28, 2015, 08:37: Open gas lines.
Thursday, May 28, 2015, 08:50: Started auto-ramping to 500 / 250 A at 4/2 A/min.
Thursday, May 28, 2015, 08:55: ANODE 200 V, COIL 50 A
Thursday, May 28, 2015, 08:52: Opened IV4
Thursday, May 28, 2015, 09:01: BIAS/EZL/EE to 30 / 15 / 1.5 kV
Thursday, May 28, 2015, 10:56: Continue auto-ramping to 580/290 A at 2/2 A/min
Thursday, May 28, 2015, 13:01: Ramping TBHT to 300 A
Friday, May 29, 2015, 08:23: ANODE current limited. Increased limit to 125 uA
Friday, May 29, 2015, 08:25: TPS:Q1 and Q4 found to be off. Switched back on
Friday, May 29, 2015, 14:38: Starting cool down of source.
Friday, May 29, 2015, 15:34: Close IV4
Friday, May 29, 2015, 15:36: BIAS/EZL/EE, COIL and ANODE off
Monday, June 01, 2015, 08:23: Vacuum at 2.8E-7 T. BIAS/EZL to 30 / 15 kV
Monday, June 01, 2015, 08:37: BIAS/EZL to 40 / 20 kV
Monday, June 01, 2015, 09:05: BIAS/EZL to 50 / 25 kV
Monday, June 01, 2015, 09:17: BIAS/EZL to 40 / 20 kV (target hand over to RH)
Monday, June 01, 2015, 09:50: BIAS/EZL to 50 / 25 kV
Monday, June 01, 2015, 10:08: BIAS/EZL to 55 / 25 kV. No sparks so far.
Monday, June 01, 2015, 10:28: EZL to 30 kV
Monday, June 01, 2015, 11:03: 2 sparks last 30 min
Monday, June 01, 2015, 11:48: 5 BIAS sparks last 80 min
Monday, June 01, 2015, 11:49: BIAS /EZL/ EE off
Monday, June 01, 2015, 15:38: Stopped TP1B for out-gassing measurement tomorrow.
Tuesday, June 02, 2015, 10:28: Stopped TP1A.
Tuesday, June 02, 2015, 13:57: Water lines purged. GE line closed (not purged).
Wednesday, June 03, 2015, 08:25: Venting |
Thursday, June 25, 2015, 09:00, Anders Mjos, , LP-FEBIAD, , TM2, , , , TM2 FEBIAD Test
|
Thursday, June 25, 2015, 09:00: Water on HS. No vacuum response.
Thursday, June 25, 2015, 11:48: Started auto ramping heaters.
Thursday, June 25, 2015, 17:14: Target at 580/275 A. BIAS/EZL/EE at 30 / 13.5 / 1.5 kV
Friday, June 26, 2015, 08:04: Stopped TP1B for outgasing measurements
Friday, June 26, 2015, 10:25: Performing outgasing measurements
Friday, June 26, 2015, 10:35: Starting TP1B.
Friday, June 26, 2015, 10:39: TP1B at speed.
Friday, June 26, 2015, 11:12: Started cool-down.
Friday, June 26, 2015, 11:47: BIAS/EZL/EE/COIL/ANODE off
Friday, June 26, 2015, 11:47: Closed IV4
Tuesday, June 30, 2015, 13:32: Venting |
Thursday, July 21, 2016, 09:51, Aaron Schmidt, , LP-FEBIAD, , , , , , Febiad Test - NEW COIL - No PE
|
Thursday, July 21, 2016, 08:55: Roughing.
Thursday, July 21, 2016, 09:50: Turbo pumps started.
Thursday, July 21, 2016, 09:54: Ion Gauge on.
Thursday, July 21, 2016, 11:12: RGA on.
Thursday, July 21, 2016, 15:12: Water lines opened. No response on RGA. Vacuum stable @ 5.7E-7 T
Friday, July 22, 2016, 08:40: Opening gas lines.
Friday, July 22, 2016, 09:09: Power/Sources on. BIAS/EZL/EE @ 30/13/1.5 kV . Coil @ 50 A . Anode @ 200 V.
Friday, July 22, 2016, 09:13: IV4 open. Auto ramping TGHT/TBHT to 580/270 A @ 2A/per min.
Friday, July 22, 2016, 09:18: Heat shield flow rate @ 3.82 lpm
Friday, July 22, 2016, 12:10: TBHT ramped to 300 A -AM
Friday, July 22, 2016, 14:08: TBHT ramped to 310 A -AM
Monday, July 25, 2016, 09:39:
Device
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
38.0 |
3.82 |
TBHT |
27.9 |
2.96 |
COIL + EE |
27.7 |
4.94 |
TGHT |
29.7 |
5.51 |
Monday, July 25, 2016, 16:29: Changed the tune to improve mass resolution.
Wednesday, July 27, 2016, 14:37: Spark tripped off IG6
Wednesday, July 27, 2016, 14:38: BIAS / EZL / EE to 40 / 17.5 / 2 kV
Wednesday, July 27, 2016, 14:51: BIAS / EZL / EE to 45 / 19 / 2.5 kV
Wednesday, July 27, 2016, 15:00: BIAS / EZL / EE to 50 / 21.6 / 2.5 kV
Wednesday, July 27, 2016, 16:06: Spark around 15:10 or 16:05 knocked out magnet (RED)
Wednesday, July 27, 2016, 17:0: BIAS / EZL / EE to 30 / 13 / 1.5 kV. Ramping down target
Thursday, July 28, 2016, 08:03 : Turn off sources. Close IV4. Turn off Ion gauge. Turbos off.
Thursday, July 28, 2016, 09:09: Source gas control off. Venting.
|
Wednesday, January 18, 2017, 09:23, Aaron Schmidt, Ta Test, LP-FEBIAD, , , 39530-3, , In progress, Tri-Coil FEBIAD for testing 12x
|
Wednesday, January 18, 2017, 09:22: Roughing
Wednesday, January 18, 2017, 09:41: Turbo pumps started.
Wednesday, January 18, 2017, 11:01: Ion gauge on.
Thursday, January 19, 2017, 08:15: Water lines opened. No response on RGA. Vacuum stable @ 1.70e-07T.
Thursday, January 19, 2017, 08:55: Power/Sources on. BIAS/EZL/EE @ 30/15/1.5 kV . Coil @ 50 A . Anode @ 200 V.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.9 |
3.99 |
TBHT |
24.8 |
3.15 |
COIL + EE |
24.7 |
5.16 |
TGHT |
24.7 |
5.05 |
Thursday, January 19, 2017, 08:59: IV4 opened. Auto ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Friday, January 20, 2017, 08:25: TSG : TP1A and TSG : BV1A were noticed to be tripped around 6am.
Friday, January 20, 2017, 08:42: Bypass to restart TSG : TP1A and TSG : BV1A. TP1A is at speed.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
34.1 |
3.99 |
TBHT |
25.0 |
3.19 |
COIL + EE |
24.7 |
5.19 |
TGHT |
26.5 |
5.05 |
Friday, January 20, 2017, 11:48: Auto ramping TBHT to 320 A @ 2A per min.
Friday, January 20, 2017, 15:51: Coil @ 100A
Saturday, January 21, 2017, 11:00: Increased TB HT voltage limit to 2.75 V. TBHT current went back up from 313 to 319 A. -AM
Monday, January 23, 2017, 10:08: Argon Valve closed.
Monday, January 23, 2017, 10:33: Neon Valve closed.
Monday, January 23, 2017, 11:00: Auto-cooling @ 4A per min. Coil reduced from 100 A to 50 A
Monday, January 23, 2017, 13:32: Power/sources off.
Monday, January 23, 2017, 13:35: RGA off. IV4 closed. Ion gauge off. Turbo pumps off.
Monday, January 23, 2017, 14:45: Venting |
Wednesday, March 21, 2018, 14:11, Fernando Maldonado, , LP-FEBIAD, , , 395530-3, 42752-2, In progress, Test FEBIAD 10x
|
Tests on coil, temperature and the use of silver bolts.
(3) Vented silver bolts on the TBHT and (2) Full silver bolts on the coil
Wednesday, March 21, 2018, 14:10: Roughing.
Wednesday, March 21, 2018, 14:30: Turbo pumps on.
Wednesday, March 21, 2018, 14:35: Ion gauge on.
Wednesday, March 21, 2018, 14:42: RGA on.
Thursday, March 22, 2018, 06:52: Waterlines opened: Vacuum stable @ 3.04e-07T
Thursday, March 22, 2018, 06:53: Power/sources on.
Thursday, March 22, 2018, 06:56: IV4 Opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
21.9 |
3.61 |
TBHT |
21.6 |
2.80 |
COIL + EE |
21.7 |
4.59 |
TGHT |
22.0 |
5.23 |
Thursday, March 22, 2018, 07:00: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Thursday, March 22, 2018, 07:04 : BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Thursday, March 22, 2018, 07:05: Optics on.
Thursday, March 22, 2018, 11:32: Out gassing noted. TBHT @ 200 A . TGHT @ 472 A. Ramping rate slowed automatically. Vacuum @ 3.03e-06T.
Thursday, March 22, 2018, 14:42: Out gassing continued. TGHT @ 570A. Auto ramping TGHT / TBHT to 580 / 250 A @ undefined rate according to vacuum. Vacuum @ 3.03e-06T
Friday, March 23, 2018, 08:11: Auto ramping TBHT from 250 A to 290 A @ 2A per min. TGHT @ 580 A.
Friday, March 23, 2018, 10:20: Anode @ 100V & 8.5mA.
Friday, March 23, 2018, 10:28: Coil @ 50 A
Friday, March 23, 2018, 10:34: Anode @ 200V & 11 mA.
Friday, March 23, 2018, 13:08: RGA froze. Restart RGA
Sunday, March 25, 2018, 20:34 Vacuum stable @ 4.3e-07T .
Sunday, March 25, 2018, 20:34: TBHT @ 290 A. TGHT @ 580 A.
Sunday, March 25, 2018, 20:34 : Coil @ 50 A ^ 0.5 V
Sunday, March 25, 2018, 20:34 : Increasing Coil to 60 A
Sunday, March 25, 2018, 20:43: Vacuum seemed to increase to 4.4e-07T.
Monday, March 26, 2018, 06:45: Optics on. Vacuum stable @ 4.38e-07T
Fernando
Wednesday, March 28, 2018, 08:31: Optics on. Vacuum stable @ 3.57e-7T
Wednesday, March 28, 2018, 16:2: After increasing the coil current to to 75, A the coil voltage started to show an oscillating behaviour. (see image ttached)
When increased to 80 A the oscillatory behaviour increases. Reducing the current to 65A and then increasing it to 70 A showed a steady behaviour
Thursday, March 29, 2018, 15:51: Ramping down EZL, BIAS, and TGHT for the long weekend
Tuesday, April 03, 2018, 09:14: Vaccum at 1.77e-7T
Tuesday, April 03, 2018, 09:14 : Auto ramping TGHT / TBHT to 550/ 250A @ 2A per min.
Tuesday, April 03, 2018, 09:18 : BIAS / EZL / EE @ 30 / 13 / 1.5 kV
Tuesday, April 03, 2018, 09:23 : Optics on
Wednesday, April 04, 2018, 08:39: Ramping TBHT to 290A @ 2A per min. TGHT remains @ 550 A
Friday, April 6, 2018, afternoon: Due to inconsistencies on EPICS, Carla and I Change the Anode power supply to local in order to monitor the leakage current with a multimeter.
Monday, April 9, 2018, afternoon: TBHT@350A and TGHT@550A
PS went current limited at AnodeBias=300V and show 3A on the PS Screen, the multimeter read the same.
Ramp down to 0 V 0A on PS. PS shows 0.01V
PS goes to limited current even at 2V.
Tuesday, April 10, 2018, 09:10: Problem persists even at lower TBHG (330A).
The output cable was removed and the power power supply seemed to behave better. This could mean that there is a short inside the unit, in the past the anode cable had melted into the cup.
Planning to ramp down the TBHT and see if the behaviour remains. If it does, I would ask to remove the unit for inspection.
Tuesday, April 10, 2018, 09:32 : Ramping down TBHTH to 250A
Tuesday, April 10, 2018, 13:07 : Same behaviour. Cooling procedure started to see if the issue is still present, anf if it does remove unit for inspection
Wednesday, April 11, 2018, 06:44: RGA, power/sources confirmed off. IV4 closed. Ion gauge & turbos off.
Wednesday, April 18, 2018, 13:00: Post use comparison of the coil - A.S
1) Used coil from this FEBIAD = 1.999mΩ ***
2) Unused coil A = 2.421mΩ
3) unused coil B = 2.451mΩ |
Tuesday, April 17, 2018, 09:59, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, , , Test FEBIAD
|
New assembly & target. Same silver bolts.
Tuesday, April 17, 2018, 09:56: Roughing.
Tuesday, April 17, 2018, 10:57: Vacuum not coming down. @ 1.514T . Backing valves have been closed.
See* elog entry for roughing pump issue 04/17/2018
Wednesday, April 18, 2018, 08:57: Turbo pumps on.
Friday, April 20, 2018, 13:45: Power/sources on. RGA restarted
Friday, April 20, 2018, 13:46: IV4 Opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.1 |
3.61 |
TBHT |
24.2 |
2.80 |
COIL + EE |
23.9 |
5.06 |
TGHT |
24.1 |
5.72 |
Friday, April 20, 2018, 13:50: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Friday, April 20, 2018, 13:56: BIAS / EZL / EE @ 30 / 13 / 1.5 kV . Spark @ Bias 28 kV knocked out RGA.
Friday, April 20, 2018, 13:59: RGA restarted.
Friday, April 20, 2018, 14:03: Optics on. Set
Friday, April 20, 2018, 14:40: Auto cooling TGHT / TBHT from 97 A @ 4A per min. Odd noise on (BIAS*) PS
Friday, April 20, 2018, 14:44: BIAS / EZL / EE @ 0 / 0 / 0 kV . Sources being turned off except TBHT and TGHT.
Monday, April 23, 2018, 10:46: FEBIAD TEST halted. See BIAS PS issue.
Tuesday, April 24, 2018, 10:46: Power off.
Tuesday, April 24, 2018, 10:48: RGA off.
Tuesday, April 24, 2018, 10:49: Ion gauge TSG:IG1 & Evap side turbos off,
Tuesday, April 24, 2018, 10:50: Ion gauge TMS:IG6 & beam side turbos off.
Tuesday, April 24, 2018, 10:54: Waterlines purged.
|
Monday, April 30, 2018, 12:07, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Test ready
|
Ready for C-seals or FEBIAD work
Monday, April 30, 2018, 12:05: Roughing.
Monday, April 30, 2018, 13:11: Turbo pumps on.
Monday, May 07, 2018, 15:02: RGA, ion gauge, and turbo pumps off. |
Tuesday, May 08, 2018, 10:36, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, C-seal Test
|
2 C-Seals installed with SS springs on water blocks. The SS springs are also used in the module.
Long pkg seal (A):
T: 0.098" x 0.429" Diameter.
Installed on line FS#5 , Block L, Heat shield cooling block. (Top seal, bottom seal of 2 is still the rubber O-ring)
Short pkg seal (B):
T: 0.095" x 0.424" Diameter.
Installed on line FS#3 , Block G, Coil cooling block.
All the waterlines are purged and shut. Open individually and monitor for leaks.
Tuesday, May 08, 2018, 10:27: Roughing
Tuesday, May 08, 2018, 10:31: Both BV1A & BV1B are open.
Tuesday, May 08, 2018, 10:57: Turbo Pumps started.
Tuesday, May 08, 2018, 11:03: Ion gauge on.
Tuesday, May 08, 2018, 11:15: RGA started.
Tuesday, May 08, 2018, 13:30: Vacuum @ 3.14e-06T
Wednesday, May 09, 2018, 06:48: Vacuum 5.13E-07T. RGA ok.
Wednesday, May 09, 2018, 06:50: Hook up Leak Detector. Leak detector # 5 (DRY) from Vacuum Group. Startup
Baseline Reading:
TP pressure 0.0e-04
Leak rate: Below 0.0e-09 atm-cc/sec
Valve to chamber opened. LD connection clear.
LD: 1.3e-08 atm-cc/sec
He TEST:
Wednesday, May 09, 2018, 07:00: Purge both lines with He. Do not pressurize.
Vacuum @ 5.13e-07T. RGA status:
Water @ 3.22e-007
He:-1.93e-009
LD: 1.3e-08 atm-cc/sec
Wednesday, May 09, 2018, 07:15: Open line FS#5 to heat shield. Pressurize to 30 PSI.
Wednesday, May 09, 2018, 07:40: Vacuum @ 5.02e-07T. RGA status:
Water @ 3.13e-007
He:-1.67e-009
LD: 9.3e-08 atm-cc/sec. Purge and close FS#5.
Wednesday, May 09, 2018, 07:45: Open line FS#3 to Coil block. Pressurize to 30 PSI.
08:10: Vacuum @ 4.9e-07T. RGA status:
Water @ 3.08e-007
He:-1.61e-009
LD: 1.5e-07 atm-cc/sec
Wednesday, May 09, 2018, 08:15: Depressurize lines. Connect HPA.
Wednesday, May 09, 2018, 08:20: Vacuum @ 4.76e-07T. RGA status:
Water @ 3.05e-007
He:-1.68e-009
LD: 1.7e-07 atm-cc/sec
08:25: LD: 1.7e-07 atm-cc/sec. Close Valve & disconnect LD
Water & Cycling TEST:
Wednesday, May 09, 2018, 08:45: Vacuum @ 4.67e-07T. RGA status:
Water: 3.02e-007
Open lines FS#2 and FS#4
Wednesday, May 09, 2018, 08:55: Vacuum @ 4.65e-07T. RGA status: Water @ 2.97e-007
Close lines FS#2 and FS#4. Water filled.
Open line FS#5 to heat shield. Vacuum and RGA ok.
09:00: Begin C-Seal (A) shock cycling. 20 cycles @ 5 min apart.
Close Supply/Return, Open Supply/Return to 'Shock'
TIME |
Vacuum (T) |
RGA (water) |
TIME |
Vacuum (T) |
RGA (Water) |
09:00 |
4.65e-07 |
2.94e-007 |
09:50 |
4.58e-07 |
2.87e-007 |
09:05 |
4.58e-07 |
2.93e-007 |
09:55 |
4.58e-07 |
2.88e-007 |
09:10 |
4.58e-07 |
2.93e-007 |
10:00 |
4.58e-07 |
2.87e-007 |
09:15 |
4.65e-07 |
2.92e-007 |
10:05 |
4.56e-07 |
2.87e-007 |
09:20 |
4.65e-07 |
2.92e-007 |
10:10 |
4.56e-07 |
2.85e-007 |
09:25 |
4.65e-07 |
2.90e-007 |
10:15 |
4.56e-07 |
2.86e-007 |
09:30 |
4.65e-07 |
2.89e-007 |
10:20 |
4.49e-07 |
2.83e-007 |
09:35 |
4.56e-07 |
2.89e-007 |
10:25 |
4.49e-07 |
2.84e-007 |
09:40 |
4.65e-07 |
2.89e-007 |
10:30 |
4.49e-07 |
2.84e-007 |
09:45 |
4.58e-07 |
2.89e-007 |
10:35 |
4.47e-07 |
2.83e-007 |
Wednesday, May 09, 2018, 10:40: Close line FS#5. Vacuum @ 4.49e-07T. RGA status: Water @ 2.84e-007
Open line FS#3 to Coil block. Vacuum and RGA ok
10:45: Begin C-Seal (B) shock cycling. 20 cycles @ 5 min apart
Close Supply/Return, Open Supply/Return to 'Shock'
TIME |
Vacuum (T) |
RGA (water) |
TIME |
Vacuum (T) |
RGA (Water) |
10:45 |
4.47e-07 |
2.80e-007 |
11:35 |
4.32e-07 |
2.77e-007 |
10:50 |
4.47e-07 |
2.80e-007 |
11:40 |
4.38e-07 |
2.75e-007 |
10:55 |
4.47e-07 |
2.81e-007 |
11:45 |
4.38e-07 |
2.75e-007 |
11:00 |
4.38e-07 |
2.80e-007 |
11:50 |
4.38e-07 |
2.75e-007 |
11:05 |
4.38e-07 |
2.78e-007 |
11:55 |
4.38e-07 |
2.75e-007 |
11:10 |
4.40-e07 |
2.79e-007 |
12:00 |
4.40e-07 |
2.75e-007 |
11:15 |
4.38e-07 |
2.77e-007 |
12:05 |
4.38e-07 |
2.73e-007 |
11:20 |
4.47e-07 |
2.77e-007 |
12:10 |
4.40e-07 |
2.73e-007 |
11:25 |
4.40e-07 |
2.78e-007 |
12:15 |
4.30e-07 |
2.71e-007 |
11:30 |
4.38e-07 |
2.76e-007 |
12:20 |
4.32e-07 |
2.73e-007 |
12:25: Open FS#5 and leave FS#3 open. Status Vacuum @ 4.32e-07T . RGA status: Water @ 2.70e-007
13:00: Status Vacuum @ 4.30e-07T . RGA status: Water @ 2.67e-007
Wednesday, May 09, 2018, 14:24: Status Vacuum @ 4.21e-07T . RGA status: Water @ 2.52e-007
Thursday, May 10, 2018, 07:41: Status Vacuum @ 3.24e-07T . RGA status: Water @ 1.76e-007.
Purge all water from lines. Prep for He.
Hook up Leak Detector. Leak detector # 5 (DRY) from Vacuum Group. Startup
Thursday, May 10, 2018, 08:00: Baseline Reading:
TP pressure 0.0e-04
Leak rate: Below 0.0e-09 atm-cc/sec
Vacuum @ 3.15e-07T . RGA status: Water @ 1.65e-007.
Valve to chamber opened. LD connection clear.
Leak rate: 1.6e-08 atm-cc/sec
He TEST #2:
Thursday, May 10, 2018, 08:13: Purge both lines with He. Do not pressurize.
Vacuum @ 3.15e-07T. RGA status:
Water @ 1.76e-007
He: -1.51e-009
LD: 1.5e-08 atm-cc/sec
Thursday, May 10, 2018, 08:15: Open line FS#3 to Coil Block. Pressurize to 30 PSI.
Thursday, May 10, 2018, 08:40: Vacuum @ 3.22e-07T . RGA status:
Water @ 1.80e-007
He:-1.98e-009
LD: 7.1e-08 atm-cc/sec. Purge and close FS#3.
Thursday, May 10, 2018, 08:45: Open line FS#5 to Heat Shield. Pressurize to 30 PSI.
Thursday, May 10, 2018, 09:10: Vacuum @ 3.22e-07T. RGA status:
Water @ 1.79e-007
He:-1.39e-009
LD: 1.5e-07 atm-cc/sec
09:15: Depressurize lines. Connect HPA.
09:30: Vacuum @ 3.22e-07T . RGA status:
Water @ 1.78e-007
He:-1.56-009
LD: 1.7e-07 atm-cc/sec
Thursday, May 10, 2018, 09:32: Close Valve & disconnect LD
Thursday, May 10, 2018, 09:35: Opened all waterlines completely. Vacuum stable @3.22e-07T and no response on the RGA.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.8 |
2.83 |
TBHT |
24.7 |
3.09 |
COIL + EE |
24.7 |
5.08 |
TGHT |
24.9 |
5.77 |
Tuesday, May 15, 2018, 06:06: Auto ramping TGHT / TBHT to 580 / 270 A @ 2A per min.
Tuesday, May 15, 2018, 06:13: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Tuesday, May 15, 2018, 06:17: Optics set. IV4 opened.
Tuesday, May 15, 2018, 08:35: RGA Restarted. Spikes noticed on BIAS current. Vacuum @ 2.57E-06T
Wednesday, May 16, 2018, 06:40: TMS:IG6 (between 3-4pm yesterday) and the RGA were both knocked out. Restarting both.
Wednesday, May 16, 2018, 06:48: Repeated attempts to reset/restart IG6 have failed. Closing IV4
Friday, May 18, 2018, 10:55: Auto-cooling @ 1A per min. IG6 still non-responsive. |
Monday, May 28, 2018, 08:46, Aaron Schmidt, , LP-FEBIAD, , TM2, 41790-9, 42752-5, In progress, New TM source tray swap out.
|
Monday, May 28, 2018, 08:45: Venting. Prep For removal.
Close FS#8. Clean up water
Adjust
Tuesday, May 29, 2018, 08:30: Test Stand source tray & Optics tray removed
Clean EZL on optics tray.
Tuesday, May 29, 2018, 11:30: New Source tray installed w/ Original TS optics tray. Connect.
Tuesday, May 29, 2018, 13:30: Roughing.
Tuesday, May 29, 2018, 14:38: Turbos on
Tuesday, May 29, 2018, 14:47: Ion gauge on.
Tuesday, May 29, 2018, 14:49: Exterior line FS# 8 opened.
Wednesday, May 30, 2018, 06:29: RGA on. Vacuum @ 3.38e-06T
He Leak TEST #1:
Vacuum Group Leak detector LD#2.
Friday, June 01, 2018, 08:30: Vacuum @ 9.15e-07T
LD Base line before opening valve to turbo pumps: 3.5e-10 atm-cc/sec
Friday, June 01, 2018, 08:40: LD baseline after opening valve to turbo pumps: 3.7e-10 atm-cc/sec
Full open base:
Vacuum @ 3.24e-07T. RGA status:
Water @ 7.76e-007
He: -2.31e-009
LD: 2.6e-09 atm-cc/sec
Friday, June 01, 2018, 10:30: Open line FS#2 . Pressurize to 30 PSI. Record after 10 minutes
Vacuum @ 9.24e-07T . RGA status:
Water @ 7.91e-007
He:-1.87e-009
LD: 2.8e-09 atm-cc/sec. Purge and close FS#2.
Friday, June 01, 2018, 10:45: Open line FS#3 . Pressurize to 30 PSI. Record after 10 minutes
Vacuum @ 9.24e-07T. RGA status:
Water @ 7.97e-007
He:-1.92e-009
LD: 3.0e-09 atm-cc/sec. Purge and close FS#3.
Friday, June 01, 2018, 11:00: Open line FS#4 . Pressurize to 30 PSI. Record after 10 minutes
Vacuum @ 9.21e-07T. RGA status:
Water @ 7.92e-007
He:-1.85e-009
LD: 4.7e-09 atm-cc/sec. Purge and close FS#4.
Friday, June 01, 2018, 11:15: Open line FS#5 . Pressurize to 30 PSI. Record after 10 minutes
Vacuum @ 9.24e-07T. RGA status:
Water @ 7.919e-007
He:-1.81e-009
LD: 4.0e-09 atm-cc/sec. Purge and close FS#5
Friday, June 01, 2018, 11:30: Depressurize lines. Connect HPA & Purge all lines.
After 5 minutes: Vacuum @ 9.24e-07T . RGA status:
Water @ 7.87e-007
He:-1.86-009
LD: 4.6e-09 atm-cc/sec
Close Valve & disconnect LD. HE LEAK TEST COMPLETE
Friday, June 01, 2018, 11:41: Open water supply and return mainlines. Vacuum @ 9.15e-07T.
Friday, June 01, 2018, 11:45: Open line FS#2. Vacuum ok. RGA ok
Friday, June 01, 2018, 11:46: Open line FS#3. Vacuum ok. RGA ok
Friday, June 01, 2018, 11:47: Open line FS#4. Vacuum ok. RGA ok
Friday, June 01, 2018, 11:48: Open line FS#5. Vacuum ok. RGA ok.
Friday, June 01, 2018, 12:05: Power/sources switched on.
Friday, June 01, 2018, 12:11: Auto ramping TGHT / TBHT to 300 / 150 A @ 2A per min.
Friday, June 01, 2018, 12:53: Power bump. Lights flickered, however TS ok.
Friday, June 01, 2018, 12:58: Monitored for 5 minutes. ok.
Friday, June 01, 2018, 15:08: Auto ramping TGHT to 350 A @ 2A per min.
Monday, June 04, 2018, 07:27: BIAS / EZL / EE @ 30 / 13 / 1.5 kV.
Monday, June 04, 2018, 07:28: Auto ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Monday, June 04, 2018, 07:30: Optics reset / Switched on. IV4 opened.
Monday, June 04, 2018, 10:00: FC0 GAIN on 1 uA = 1.65e-09. Wire scans no reading. Adjust steering.
Monday, June 04, 2018, 10:34: Anode @ 200V. Coil @ 10A.
Monday, June 04, 2018, 13:30: Optics tune changed with EZL off. Brad. S.
Monday, June 04, 2018, 13:45: Resetting tunes. COIL @ 50 A. Auto ramping TBHT to 300 A @ 2A per min. (310 A on read back)
Monday, June 04, 2018, 13:51: EZL / EE @ 13 / -1.5 kV.
Monday, June 04, 2018, 13:54: Optics reset to EZL on.
Tuesday, June 05, 2018, 08:00: RGA off.
Tuesday, June 05, 2018, 08:10: Auto ramping TBHT to 310 A @ 2A per min. (320 A on read back)
E-rig issue. Not scanning. Proceed with HV testing.
Tuesday, June 05, 2018, 09:00: BIAS / EZL / EE @ 35 / 15 / 1.75 kV.
Tuesday, June 05, 2018, 09:06: BIAS / EZL / EE @ 40 / 17.5 / 2 kV.
Tuesday, June 05, 2018, 09:13: Small spark knocked out optics & TMS:TP6
Tuesday, June 05, 2018, 09:21: IV4 closed/opened/reset. TP6 restarted.
Tuesday, June 05, 2018, 09:30: Spark*. Knocked out optics. Reset.
Tuesday, June 05, 2018, 10:37: BIAS / EZL / EE @ 45 / 19.5 / 2.25 kV.
Tuesday, June 05, 2018, 10:44: BIAS / EZL / EE @ 50 / 22 / 2.5 kV.
Tuesday, June 05, 2018, 10:47: Spark. Optics & CBC reset.
Tuesday, June 05, 2018, 11:25: BIAS / EZL / EE @ 52 / 24 / 2.8 kV. SPARK *knocked out optics, magnet & Turbo TMS:TP6. IV4 closed/opened/reset. TP6/optics restarted. Magnet still off.
Tuesday, June 05, 2018, 11:35: BIAS / EZL / EE @ 55 / 24 / 2.8 kV. SPARK* knocked out optics, magnet & Turbos TMS:TP6 & TP1B. IV4 closed/opened/reset. Turbos/optics restarted. Magnet still off.
Tuesday, June 05, 2018, 12:46: BIAS / EZL / EE @ 55 / 24 / 2.8 kV. SPARK* knocked out optics, magnet & Turbos TMS:TP6 & TP1B. IV4 closed/opened/reset. Turbos/optics restarted. Magnet still off.
Tuesday, June 05, 2018, 13:06: BIAS / EZL / EE @ 55 / 24 / 2.8 kV. SPARK* knocked out optics, magnet & Turbos TMS:TP6. IV4 closed/opened/reset. Turbo/optics restarted. Magnet still off. Anode @ 200V (reads 9V, shorted)
Tuesday, June 05, 2018, 13:16: TBHT brought down to 300A. Anode brought to 0V.
Tuesday, June 05, 2018, 13:20: Attempted to bring up to 30V. (30 input) Actual: 8V & 50.061 mA. Possible short, post spark*
Tuesday, June 05, 2018, 13:47: Auto-cooling @ 2A/min
Tuesday, June 05, 2018, 13:56: BIAS / EZL / EE @ 50 / 22 / 2.5 kV. Continue down to 30 kV settings.
Tuesday, June 05, 2018, 14:04: BIAS / EZL / EE @ 30 / 13 / 1.5 kV.
Wednesday, June 06, 2018, 06:49: Anode still unresponsive cold. Short*
Wednesday, June 06, 2018, 11:09: Vacuum @ 4.30e-07T ok. Test EZL
Wednesday, June 06, 2018, 11:16: BIAS / EZL / EE @ 30 / 20 / 1.5 kV.
Wednesday, June 06, 2018, 11:20: BIAS / EZL / EE @ 30 / 25 / 1.5 kV.
Wednesday, June 06, 2018, 11:24: BIAS / EZL / EE @ 30 / 30 / 1.5 kV.
Wednesday, June 06, 2018, 11:30: Coil @ 0A.
Wednesday, June 06, 2018, 12:51: No sparks* BIAS / EZL / EE @ 30 / 30 / 1.5 kV.
Wednesday, June 06, 2018, 12:53: Move Steerers to zero.
TSG:CB1: 0V
TSG:VCB1: 0V
TSG:CBC(2): 0V
Increase each one to 1000V individually. Hold 5 minutes and bump back to zero on each.
Wednesday, June 06, 2018, 12:55: TSG:CB1: 0 - 1000V. Hold for 5 minutes. Zero Sparks. Back to 0V.
Wednesday, June 06, 2018, 13:01: TSG:VCB1: 0 - 1000V. Goes red @ 1000V, stays blue @ 999V Hold for 5 minutes. Zero Sparks. Back to 0V.
Wednesday, June 06, 2018, 13:06: TSG:CBC(2): 0 - 1000V. Hold for 5 minutes. Zero Sparks. Back to 0V.
Wednesday, June 06, 2018, 13:40: Canbus contoller was swapped. The magnet is back.
Wednesday, June 06, 2018, 13:50: Sources to 0V.
Wednesday, June 06, 2018, 14:05: IV4 closed. Turbo pumps off. Ion gauge off.
Wednesday, June 06, 2018, 14:08: Power to the sources off.
Thursday, June 07, 2018, 06:35: Venting & waterlines purged. |
Thursday, June 21, 2018, 16:32, Anders Mjos, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Heating target
|
Thursday, June 21, 2018, 16:30: Short between ANODE and EE. Do not use until repaired.
Thursday, June 21, 2018, 16:32: Ramping TBHT/TGHT to 290 / 580 Aat 2 A/min
Friday, June 22, 2018, 07:49: Target at temperature. Vacuum at 1.0E-7 T
Monday, June 25, 2018, 09:10: Auto-cooling at 2A/min - AS.
Friday, June 29, 2018, 08:52: Turbos/PS/Sources/RGA/Ion gauge off.
Friday, June 29, 2018, 10:03: Venting.
Friday, June 29, 2018, 14:32: Roughing. Anode to EE short fixed. |
Monday, July 09, 2018, 10:44, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Coil Test July
|
Monday, July 09, 2018, 10:43: Rouging.
Monday, July 09, 2018, 13:14: Turbo pumps on.
Tuesday, July 10, 2018, 07:45: Waterlines opened. Vacuum ok @ 6.93e-07T. No response on RGA.
Tuesday, July 10, 2018, 08:05: Opened gas lines TSH:SV3 & TSH:SV4. Vacuum spiked to 1.08e-06T. Response registered on RGA. Closed valves.
Tuesday, July 10, 2018, 08:22: Vacuum Holding at 1.08e-06T.
Tuesday, July 10, 2018, 08:24: Close valve to small gas line pump. Pump is running.
Tuesday, July 10, 2018, 09:02: Path to TSH:SV1 through SV2 & SV5 ok. Vacuum @ 5.55e-07T. Close and begin SV3 & SV4 purging.
Tuesday, July 10, 2018, 09:12: All gas lines opened.
Tuesday, July 10, 2018, 09:16: Power/sources on. Vacuum @ 7.26e-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.4 |
3.85 |
TBHT |
24.2 |
2.99 |
COIL + EE |
24.2 |
4.97 |
TGHT |
24.6 |
5.61 |
Tuesday, July 10, 2018, 09:18: Auto ramping TGHT / TBHT to 580 / 270 A @ 2A per min.
Tuesday, July 10, 2018, 09:20: IV4 opened. Optics on (already set).
Tuesday, July 10, 2018, 14:11: Abort auto-ramping. Increase TBHT ramping to 300A. Continue auto ramping TGHT / TBHT to 580 / 270 A @ 2A per min.
Tuesday, July 10, 2018, 13:56: BIAS/EZL/EE @ 30/13/1.5 kV. Anode set to 200 V
Tuesday, July 10, 2018, 14:12: Auto ramping complete.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
34.6 |
3.85 |
TBHT |
25.0 |
2.97 |
COIL + EE |
24.9 |
5.00 |
TGHT |
26.8 |
5.60 |
Tuesday, July 10, 2018, 14:17: TBHT set to 300 A. Read back reads 312 A
Wednesday, July 11, 2018, 06:52: Coil to 10A.
Wednesday, July 11, 2018, 07:00: Coil to 20A.
Wednesday, July 11, 2018, 07:05: Coil to 30A.
Wednesday, July 11, 2018, 07:10: Coil to 40A.
Wednesday, July 11, 2018, 07:20: Coil to 50A.
Fernando Maldonado
Wednesday, July 11, 2018, 09:59 Anode current=4.884 mA, Anode Voltage=200V. FC0=1.59e-9 . Source seems to be too cold. ramping up TBHT to 320 A (for a 330A readback). Vaccum=9.06e-7
Wednesday, July 11, 2018, 10:18 Ramp up compleete TBHT=320A Read Back=33.8A. Anode current=9.768mA. Anode voltage=200V. FC0=1.77e-8A. Vaccum=9.13e-7
Wednesday, July 11, 2018, 11:52 Mass scan performed for nominal values
Lunch
Steering
Adjusting Emittance parameter for more precise scan
Wednesday, July 11, 2018, 15:37 Cathode is still "cold" , at 325A and 250V the anode current is 15 mA. The way to obtained more current and to have better emittances readings is to increase the tbht current
Wednesday, July 11, 2018, 15:39 TBHT=325, TBHT RB =339.1A, TBHT PS=330A. Increasing TBHT to 335A. Where TBHT RB is the read back value. TBHT PS is the value display on the Power Supply
Wednesday, July 11, 2018, 15:46 tbht=335, tbht rb=349.7, tbht ps=341. With this the anode current is 24.42 at anode voltage=250V. *THIS WILL BE THE MAXIMUM VALUE"
Wednesday, July 11, 2018, 17:15 Mass Scan measurement seem to not vary with anode voltage
Wednesday, July 11, 2018, 17:45 Coil to 60 A to let out gass a bit more overnight. Vacuum ok at 9.6e-7
Thursday, July 12, 2018, 07:25: Power outage. (07/11/2018 @ 21:53 approx) The test stand was completely knocked out. Power & pumps were all shut down.
Thursday, July 12, 2018, 07:31: Power supplies turned off and all settings manually re-zeroed. |
|