Friday, August 10, 2012, 15:29, Pierre Bricault, NA, LP-FEBIAD, , , NA, NA, , finishing the gas installation and its pump
|
1524H Start small pump.
1529H stop the pump.
|
Saturday, August 11, 2012, 13:34, Pierre Bricault, NA, LP-FEBIAD, , , NA, NA, In progress, Test FEBIAD anode bias 120 V
|
|
Thursday, April 25, 2013, 13:32, Anders Mjos, Empty, LP-FEBIAD, , , Tube Only, 38307-9 , In progress, FEBIAD Coil test
|
Same target as in e-log entry https://elog.triumf.ca/TIS/Test-Stand/106
Thursday, April 25, 2013, 13:54: Roughing
Thursday, April 25, 2013, 14:25: Started turbos |
Friday, October 31, 2014, 14:57, Anders Mjos, , LP-FEBIAD, , , Tube only, 38307-9, In progress, Test
|
Friday, October 31, 2014, 14:47: Starting turbos
Friday, October 31, 2014, 14:57: Turbos at speed. Vacuum at 2.9E-5 T
Monday, November 03, 2014, 10:08 : Opened HS water circuit. Vacuum stable at 1.7E-7 T |
Friday, December 12, 2014, 14:09, Anders Mjos, , LP-FEBIAD, , , Tube only, , In progress, HV BIAS Test
|
BIAS current limit pot changed from 2.40 to 0.25
EZL current limit pot changed from 0.50 to 0.20
Testing max HV bias with Ray |
Thursday, April 02, 2015, 15:42, Anders Mjos, TM2 Test Target, LP-FEBIAD, , TM2, , 39230-1, Done, TM2 Test Target Conditioning
|
Thursday, April 02, 2015, 15:42: Roughing
Thursday, April 02, 2015, 16:12: Turbos started
Thursday, April 02, 2015, 16:22: Turbos at speed. Vacuum at 8.7E-6 T |
Friday, April 24, 2015, 12:26, Anders Mjos, , LP-FEBIAD, , TM2, , 39230-1, In progress, Testing new TM2 Source Tray
|
Photos on DocuShare
Friday, April 24, 2015 |
Wednesday, May 13, 2015, 13:27, Anders Mjos, , LP-FEBIAD, , TM2, , 39230-1, In progress, Re-testing new TM2 Source Tray
|
NOTE: COIL PS is a 100 A supply, thus actual COIL current is 0.5x COIL set point.
Changed the FEBIAD connector blocks to have copper tubes exit below the block. Extended ANODE wire to allow it to be wrapped around Cu-tubes and
keep it further away from the GE lines. |
Thursday, May 21, 2015, 17:26, Anders Mjos, , LP-FEBIAD, , TM2, , , In progress, Re-testing new TM2 Source Tray
|
Thursday, May 21, 2015, 17:26: Roughing
Thursday, May 21, 2015, 18:02: Turbos started
Thursday, May 21, 2015, 18:12: Turbos at speed. Vacuum at 4.7E-5 T |
Wednesday, May 27, 2015, 14:19, Anders Mjos, , LP-FEBIAD, , TM2, , , In progress, Re-testing new TM2 Source Tray
|
Wednesday, May 27, 2015, 14:19: Roughing
Wednesday, May 27, 2015, 14:50: Turbos started
Wednesday, May 27, 2015, 15:00: Turbos at speed. Vacuum at 1.6e-5 T |
Thursday, June 25, 2015, 09:00, Anders Mjos, , LP-FEBIAD, , TM2, , , , TM2 FEBIAD Test
|
Thursday, June 25, 2015, 09:00: Water on HS. No vacuum response.
Thursday, June 25, 2015, 11:48: Started auto ramping heaters.
Thursday, June 25, 2015, 17:14: Target at 580/275 A. BIAS/EZL/EE at 30 / 13.5 / 1.5 kV |
Thursday, July 21, 2016, 09:51, Aaron Schmidt, , LP-FEBIAD, , , , , , Febiad Test - NEW COIL - No PE
|
Thursday, July 21, 2016, 08:55: Roughing.
Thursday, July 21, 2016, 09:50: Turbo pumps started.
Thursday, July 21, 2016, 09:54: Ion Gauge on. |
Wednesday, January 18, 2017, 09:23, Aaron Schmidt, Ta Test, LP-FEBIAD, , , 39530-3, , In progress, Tri-Coil FEBIAD for testing 12x
|
Wednesday, January 18, 2017, 09:22: Roughing
Wednesday, January 18, 2017, 09:41: Turbo pumps started.
Wednesday, January 18, 2017, 11:01: Ion gauge on. |
Wednesday, March 21, 2018, 14:11, Fernando Maldonado, , LP-FEBIAD, , , 395530-3, 42752-2, In progress, Test FEBIAD 10x
|
Tests on coil, temperature and the use of silver bolts.
(3) Vented silver bolts on the TBHT and (2) Full silver bolts on the coil
Wednesday, March 21, 2018, 14:10: Roughing. |
Tuesday, April 17, 2018, 09:59, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, , , Test FEBIAD
|
New assembly & target. Same silver bolts.
Tuesday, April 17, 2018, 09:56: Roughing.
Tuesday, April 17, 2018, 10:57: Vacuum not coming down. @ 1.514T . Backing valves have been closed. |
Monday, April 30, 2018, 12:07, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Test ready
|
Ready for C-seals or FEBIAD work
Monday, April 30, 2018, 12:05: Roughing.
Monday, April 30, 2018, 13:11: Turbo pumps on. |
Tuesday, May 08, 2018, 10:36, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, C-seal Test
|
2 C-Seals installed with SS springs on water blocks. The SS springs are also used in the module.
Long pkg seal (A):
T: 0.098" x 0.429" Diameter. |
Monday, May 28, 2018, 08:46, Aaron Schmidt, , LP-FEBIAD, , TM2, 41790-9, 42752-5, In progress, New TM source tray swap out.
|
Monday, May 28, 2018, 08:45: Venting. Prep For removal.
Close FS#8. Clean up water
Adjust |
Thursday, June 21, 2018, 16:32, Anders Mjos, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Heating target
|
Thursday, June 21, 2018, 16:30: Short between ANODE and EE. Do not use until repaired.
Thursday, June 21, 2018, 16:32: Ramping TBHT/TGHT to 290 / 580 Aat 2 A/min
Friday, June 22, 2018, 07:49: Target at temperature. Vacuum at 1.0E-7 T |
Monday, July 09, 2018, 10:44, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Coil Test July
|
Monday, July 09, 2018, 10:43: Rouging.
Monday, July 09, 2018, 13:14: Turbo pumps on.
Tuesday, July 10, 2018, 07:45: Waterlines opened. Vacuum ok @ 6.93e-07T. No response on RGA. |
|