271
|
Tuesday, March 19, 2013, 13:49 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Tubros Started | Turbo Pumps have been started and
are in normal operation. TP1 which has recently
been replaced was started in soft start and |
|
272
|
Wednesday, March 20, 2013, 08:19 |
David Wang | Conditioning Station | Repair | TM4 | | Leak check new installed TM4 TP1 at conditioning station. | I leak checked new installed TM4 TP1 at
conditioning station. The CS vacuum gauges
reading were at 1.0-1.5xE-6 torr . Leak detector |
|
273
|
Friday, March 22, 2013, 18:49 |
Aurelia Laxdal | Conditioning Station | Development | TM4 | FEBIAD HP with Dummy Target | Commissioning TCS - Part 1 | Today, the commissioning of the TCS went
well. The water/vacuum interlocks were checked
OK. Then, the TCS was HV conditioned up to |
|
274
|
Saturday, March 23, 2013, 18:14 |
Aurelia Laxdal | Conditioning Station | Development | TM4 | FEBIAD HP with Dummy Target | Commissioning TCS - Part 2 Completed | After few hickups the TCS was successfuly
commissioned.
In the morning, in the middle of |
|
275
|
Monday, March 25, 2013, 09:35 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Cooling Package and Vacuum Stopped | The cooling package and vacuum was
stopped today at 9:26 so the module can be
move. |
|
276
|
Monday, March 25, 2013, 10:59 |
Bevan Moss | Conditioning Station | Development | TM4 | FEBIAD HP with Dummy Target | Commissioning TCS - Part 2 Completed |
|
|
277
|
Monday, March 25, 2013, 14:19 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | module move | TM#4 with the CS Test target has been moved
from the conditioning station to the south
hot cell. Move went well. |
|
278
|
Tuesday, March 26, 2013, 14:17 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#28 (RFQ Target) | Electrical check | Electrical check of TM#4 SiC#28 (RFQ Target)
has been completed. It passed the standard
electrical checks for the target part, but |
|
279
|
Wednesday, March 27, 2013, 10:44 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#28 (RFQ Target) | module move | TM#4 with SiC#28 has been moved from the
south hot cell to the east target station
move went well. |
|
280
|
Wednesday, March 27, 2013, 11:49 |
David Wang | ITE | Standard Operation | TM4 | Sic LIS-RFQ | Connected TM4 in ITE | TM4 has been reconnected to ITE after the
module moving. The roughing is started .
The water will be supplied to ITE after |
|
281
|
Wednesday, March 27, 2013, 12:08 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Sic LIS-RFQ | TM4 heat shield circuit leak check with SiC LIS-RFQ target | Chad and I did the TM4 heat shield leak
check yesterday at SHC. The leak detector
was pumped to 4.6 xE-9atm.cc/sec, and 0.0xE-4 |
|
284
|
Wednesday, April 03, 2013, 12:26 |
David Wang | ITE | Maintenance | TM4 | Sic LIS/RFQ | Leak check on ITE TM4. | TM 4 had been leak check in ITE due to
relatively high PNG1 and IG1 readings.All
TM4 primary and secondary vessel air |
|
302
|
Wednesday, April 17, 2013, 10:35 |
David Wang | ITE | Standard Operation | TM4 | | I moved 5 shielding blocks back to ITE. | 5 shielding block had been moved
back to ITE. The ITE is configured to take
proton beam. |
|
343
|
Wednesday, May 15, 2013, 10:00 |
David Wang | ITE | Standard Operation | TM4 | | Disconnected TM4 in ITE. | HS had been purged. The ITE is under venting.
The TM4 will be moved to SH on next Tuesday
which is May 21th. |
|
353
|
Tuesday, May 21, 2013, 11:38 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#28 (RFQ Target) | module move | TM#3 with SiC#28 (RFQ Target) has been
moved from the east target station to the
south west silo. |
|
355
|
Wednesday, May 22, 2013, 10:41 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#28 (RFQ Target) | module move | TM#4 with SiC#28 has been moved from the
south west silo to the south hot cell. |
|
356
|
Wednesday, May 22, 2013, 14:11 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#40 | Ta#40 installed | Ta#40 has been installed.
Leak checking and high voltage tomorrow
before the move. |
|
357
|
Thursday, May 23, 2013, 09:51 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#40 | module move | TM#4 with Ta#40 has been moved from the
south hot cell to the conditioning station. |
|
358
|
Thursday, May 23, 2013, 11:14 |
David Wang | South Hot-Cell | Standard Operation | TM4 | TA#40 | TM4 TA# 40 HS leak check at SHC | TM4 Ta#40 HS leak check is done at SHC
. No leak has been found so far. There will
be a helium pressure test on it at |
|
360
|
Thursday, May 23, 2013, 14:08 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta #40 | Turbo Pumps on | The turbo pumps have been turned
on and are running |
|