Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 353     Entry time: Tuesday, May 21, 2013, 11:38
Author: Travis Cave 
Category: ITE 
Type: Standard Operation 
Module: TM4 
Target/Number: SiC#28 (RFQ Target) 
Subject: module move 

TM#3 with SiC#28 (RFQ Target) has been moved from the east target station to the south west silo.

ELOG V2.9.2-2455