Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 355     Entry time: Wednesday, May 22, 2013, 10:41
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: SiC#28 (RFQ Target) 
Subject: module move 

TM#4 with SiC#28 has been moved from the south west silo to the south hot cell.

ELOG V2.9.2-2455