Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 356     Entry time: Wednesday, May 22, 2013, 14:11
Author: chad fisher 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: Ta#40 
Subject: Ta#40 installed 

Ta#40 has been installed.

Leak checking and high voltage tomorrow before the move.

ELOG V2.9.2-2455