  872   Wednesday, March 25, 2015, 14:25 David WangSouth Hot-CellStandard OperationTM4Ta#45Leak check on TM4 HS water line with new Ta#45 target. at SHCChad and I leak checked TM4 HS water line
with new Ta#45 target installed at SHC. Leak
detector base leak rate 0.0Xe-9 atm.cc/sec,
  
  873   Wednesday, March 25, 2015, 14:34 David WangConditioning StationStandard OperationTM4Ta#45 TM4 and CS turbo- pumps are started .I connected TM4 and CS vacuum system after
TM4 move. CS roughing pump was started first
this morning. Later, Anders, Bill and I started
  
  874   Thursday, March 26, 2015, 09:20 Travis CaveConditioning StationStandard OperationTM4Ta#45Electrical checkElectrical check of TM#4 with Ta#45 at
the conditioning station, see attached pdf
for details.
 TM4_Ta#45_tgt_elec_chk_CS.PDF 
  875   Friday, March 27, 2015, 10:03 David WangConditioning StationStandard OperationTM4Ta#45Helium pressure test on TM4 HS line at CSThe helium pressure test on TM4 HS line
at conditioning station is done. No leak.
I also leak checked all vacuum seals on TM4
 001.JPG005.JPG006.JPG 
  876   Friday, March 27, 2015, 11:29 David WangConditioning StationStandard OperationTM4Ta#45TM4 is connected at CSTM4 has been connected at CS which includes
high current cables, water lines, EE cable,
and Enizel lens cable. The HV cover has been 
 010.JPG013.JPG012.JPG 
  877   Monday, March 30, 2015, 07:38 David WangITEStandard OperationTM4 TH Shut Down Activities Schedule Feb 23th- Apr 15th updateUpdated schedule this morning after last
Fridays ISAC facility support group meeting.
Updated schedule on 2015-April -02.
 Target_Hall_shut_down_activities.pdfTarget_Hall_shut_down_activities.mppTarget_Hall_shut_down_activities.pdfTarget_Hall_shut_down_activities.mpp 
  878   Monday, March 30, 2015, 09:03 Anders MjosConditioning StationStandard OperationTM4Ta#45Ta#45 ConditionoingMonday, March 30, 2015, 08:59: Reset chiller
by switching on off power (fault 2)
Monday, March 30, 2015, 09:02: Switched
 Ta#45_Conditioning.docx 
  880   Wednesday, April 01, 2015, 06:56 David WangConditioning StationStandard OperationTM4Ta#45TM4 has been disconnected at CS.TM4 has been disconnected at CS. The CS
and TM4 is venting for move. Anders stopped
vacuum and water system yesterday.
  
  881   Wednesday, April 01, 2015, 10:52 Travis CaveITEStandard OperationTM4Ta#45Module moveTM#4 with Ta#45 has been moved from the
conditioning station to the east target station.
  
  882   Wednesday, April 01, 2015, 13:08 David WangITEStandard OperationTM4 Replaced ITE tank to module 42X0.275 o-ringI replaced ITE tank to module 42 ID X 0.275
o-ring. The o-ring is changed once a year
before the first beam time. The flanges was
 001.JPG002.JPG004.JPG005.JPG006.JPG 
  883   Wednesday, April 01, 2015, 13:12 David WangITEStandard OperationTM4Ta#45TM4 has been connected in ITETM4 has been connected in ITE. ITE six
turbo-pumps have been started. So far so
good.
  
  884   Friday, April 10, 2015, 15:40 David WangITEStandard OperationTM4 5 Shielding blocks have been transferred from ITW to ITE.5 shielding  blocks have been transferred
to ITE. The ITE is configured to take proton
beam.
  
  885   Monday, April 13, 2015, 08:59 David WangITEStandard Operation  Target Hall Scheduled Activities April 07 - June 26 2015See attachments 1, 2 for target hall schedule
from 07 April to 26 June 2015. The first
TM1 move which is scheduled on 16 April 2015
 Target_Hall_Scheduled_Activities__Apr_07_to_June_26_2015.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_June_26_2015.mppTarget_Hall_Scheduled_Activities__Apr_07_to_June_26_2015.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_June_26_2015.mpp 
  887   Friday, April 17, 2015, 09:09 Travis CaveSouth Hot-CellStandard OperationTM1No targetModule moveTM#1 with no target has been moved from
the south west silo to the south hot cell
for the installation of the UCx target.
  
  888   Friday, April 17, 2015, 11:56 Travis CaveSouth Hot-CellStandard OperationTM1UC#12Electrical checkElectrical check of TM#1 with UCx#12 attached.
See attached PDF for details.
 TM1_UC#12_tgt_elec_chk_SHC.PDF 
  889   Friday, April 17, 2015, 14:04 Travis CaveSouth Hot-CellStandard OperationTM1UC#12Module moveTM#1 with UCx#12 has been moved from the
south hot cell to the conditioning station.
  
  890   Monday, April 20, 2015, 07:27 David WangITEStandard OperationTM4 Target Hall Scheduled Activities April 07 - June 26 2015Weekly target hall schedule update.2015-04-20
weekly target hall schedule update
2015-04-27 attachments 3,4.
 Target_Hall_Scheduled_Activities__Apr_07_to_June_26_2015.mppTarget_Hall_Scheduled_Activities__Apr_07_to_June_26_2015.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_June_26_2015.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_June_26_2015.mpp 
  891   Monday, April 20, 2015, 10:12 Anders MjosConditioning StationStandard OperationTM1UC#12Conditioning UC#12Monday, April 20, 2015, 09:35: Started
cooling water circulation
HV cover did not fit due to interference
  
  892   Monday, April 20, 2015, 10:22 David WangConditioning StationStandard OperationTM1UCx12TM1 with UCx12 has been connected to CS and ready for conditioing.The TH will be locked during the TM1 conditioning
time due to  an interference issue between
CS HV cover and a gas analysis valve on top
  
  894   Tuesday, April 21, 2015, 17:14 Isaac EarleSouth Hot-CellStandard OperationTM1UC#12UC#12 Installed in TM1On Friday April 17th, UC#12 target was
installed in TM1.  One of the copper
water lines was bent slightly as the target
 IMG_4836.JPGIMG_4833.JPG 