Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 875     Entry time: Friday, March 27, 2015, 10:03
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM4 
Target/Number: Ta#45 
Subject: Helium pressure test on TM4 HS line at CS 

The helium pressure test on TM4 HS line at conditioning station is done. No leak. I also leak checked all vacuum seals on TM4 service cap. They are all good.

Attachment 1: 001.JPG  2.359 MB  | Show | Hide all
Attachment 2: 005.JPG  2.608 MB  | Show | Hide all
Attachment 3: 006.JPG  3.099 MB  | Show | Hide all
ELOG V2.9.2-2455