895
|
Wednesday, April 22, 2015, 11:05 |
David Wang | Conditioning Station | Standard Operation | TM1 | | electrical check on TM1 at CS under vacuum | I did an electrical check on TM1 at CS.
The resistance check:A-B 3.918m ohm, A-C
5.905m ohm,A-D 4.070m ohm,B-C5.462m ohm,B-D3.633m |
|
898
|
Monday, April 27, 2015, 10:28 |
David Wang | Conditioning Station | Standard Operation | TM1 | UCx12 | TM4 has been partially disconnected at CS. | TM1 has been partially disconnected at
CS for tomorrow move. The CS TP1S is still
running and will be stopped and disconnected |
|
901
|
Tuesday, April 28, 2015, 10:21 |
David Wang | Conditioning Station | Standard Operation | TM1 | UCx12 | CS and TM1 was vented with Argon gas | Dan and I vented CS and TM1 with Argon
gas before it is moved this morning. |
|
902
|
Tuesday, April 28, 2015, 10:26 |
David Wang | ITW | Standard Operation | TM1 | UCx12 | ITW target pit o-ring seal replacement. | Dan and I replaced ITW target pit o-ring
seal(.275DIA X42"ID). It is an annual
job before first beam to ITW. The old o-ring |
|
904
|
Tuesday, April 28, 2015, 11:14 |
Travis Cave | ITW | Standard Operation | TM1 | UC#12 | Module move | TM#1 with UC#12 has been moved from the
conditioning station to the west target station. |
|
905
|
Tuesday, April 28, 2015, 17:17 |
David Wang | ITW | Standard Operation | TM1 | UCx12 | TM1 has been connected in ITW. | TM1 has been connected in ITW. Five turbo
pumps have been started. The TM1 containment
box window line is capped on the service |
|
906
|
Thursday, April 30, 2015, 08:50 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | No target | Module move | TM#2 with no source tray has been moved
from the north east silo to the south hot
cell. |
|
908
|
Friday, May 01, 2015, 13:48 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | Target Hall Scheduled Activities April 07 - June 26 2015 update | Target Hall Scheduled Activities
April 07 - June 26 2015 update.
2015-05-01. All TH scheduled |
 |
914
|
Monday, May 11, 2015, 11:20 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | Target Hall Scheduled Activities April 07 - June 26 2015 | The schedule has some changes due to
new TM2 source tray coil cooling line leaking
at test stand. Now,It is re-scheduled in |
6x |
916
|
Friday, May 22, 2015, 15:44 |
David Wang | ITW | Standard Operation | TM1 | UCx12 | 5 Shielding blocks have been transferred from ITE to ITW. | 5 shielding blocks have been transferred
from ITE to ITW. I checked all ITW
water signals, and they are good. ITW |
|
919
|
Wednesday, May 27, 2015, 08:57 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | | Module moved | TM#2 with no source tray has been moved
from the south hot cell to the conditioning
station. |
|
920
|
Friday, May 29, 2015, 09:16 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | Module moved | TM#2 with no source tray has been moved
from the conditioning station to the north
east silo. |
|
921
|
Monday, June 01, 2015, 11:23 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#45 | Module moved | TM#4 with Ta#45 has been moved from the
east target station to the south hot cell. |
|
922
|
Monday, June 01, 2015, 14:24 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#45 | Electrical Check | Post beam electrical check on the Ta#45
target installed on TM#4. See attached PDF. |
|
923
|
Tuesday, June 02, 2015, 06:51 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | Target Hall Scheduled Activities April 07 - June 26 2015 | Target Hall schedule weekly update. All
jobs are finished on time so far. |
 |
924
|
Tuesday, June 02, 2015, 09:43 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | SiC#31 | SiC#31 installed | Ta #45 has been removed from TM4 and SIC#31installed. |
|
925
|
Tuesday, June 02, 2015, 10:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#31 | Electrical Check | Electrical check on TM#4 with SiC#31. See
attached PDF for details. |
|
926
|
Tuesday, June 02, 2015, 11:54 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | SiC#31 | Module moved | TM#4 with SiC#31 has been moved from the
south hot cell to the conditioning station. |
|
927
|
Tuesday, June 02, 2015, 14:32 |
David Wang | South Hot-Cell | Standard Operation | TM4 | SiC #31 | Leak check on TM4 HS water line with new SiC #31 target. at SHC | Chad and I leak checked TM4 HS water line
with SiC #31 target installed. leak rate:0.0xE-9atm.cc/sec.
No leak. The line will be helium pressurized |
  |
929
|
Tuesday, June 02, 2015, 14:39 |
David Wang | Conditioning Station | Standard Operation | TM4 | SiC #31 | TM4 and CS turbo- pumps are started . | TM4 and CS turbo-pumps are started this
afternoon. Everything is good so far. |
|