ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
 |
811
|
Thursday, December 04, 2014, 09:57 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target placed in F-308. | Spent targets in the mini storage were
placed into the F-308s yesterday, all F-308
have been removed from the the target hall |
|
827
|
Tuesday, January 06, 2015, 11:14 |
David Wang | ITE | Standard Operation | TM4 | | 4 Shielding blocks have been moved out of ITE . | 4 shielding blocks have been moved out
of ITE to block storage area. Fiona
did the survey and with me during the move. |
|
830
|
Thursday, January 08, 2015, 08:04 |
David Wang | ITE | Standard Operation | TM4 | | TM4 water lines have been disconnected in ITE and purged. | TM4 waterlines have been disconnected and
purged in ITE. The TM4 vacuum system is still
in operation. |
|
831
|
Thursday, January 08, 2015, 10:34 |
chad fisher | South Hot-Cell | Standard Operation | | | TM2 Tray Build Status and Problems | Final assembly of the source tray for TM2
was started this morning.
Sliding tray was received from keensert |
   |
849
|
Thursday, February 26, 2015, 09:22 |
David Wang | ITW | Standard Operation | | | TH Shut Down Activities Schedule Feb 23th- Mar 25th | TH shut down activities schedule from Feb
23th-March 25th. The schedule will be updated
each week. See attachment 1. |
 |
853
|
Thursday, March 05, 2015, 07:17 |
David Wang | ITW | Standard Operation | | | TH Shut Down Activities Schedule Feb 23th- Apr 15th update | TH shut down jobs are processing as scheduled
this week. Discussed with Don, and we think
the jobs scheduled in next week should be |
6x |
856
|
Monday, March 09, 2015, 14:01 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | ThO#1 | ThO#1 removed | ThO#1 has been removed from TM1 and placed
into the plastic dissection box.
Containment box cover has been reinstalled |
|
857
|
Tuesday, March 10, 2015, 09:01 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ThO#1 | Module move | TM#1 has been moved from the west station
to the south hot cell had the ThO#1 target
removed and then the modules was moved from |
|
858
|
Thursday, March 12, 2015, 09:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | No target | Module move | TM#2 with no target and no source tray
has been moved from the conditioning station
to the north east silo. |
|
859
|
Thursday, March 12, 2015, 13:04 |
David Wang | ITE | Standard Operation | TM4 | | 5 Shielding blocks have been transferred from ITE to ITW. | 5 shielding blocks have been transferred
from ITE to ITW for next week TM4 move. |
|
860
|
Thursday, March 12, 2015, 13:33 |
Anders Mjos | South Hot-Cell | Standard Operation | TM1 | ThO#1 | Target inspection | Chad, Anders and Alex inspected the target
this morning. The target had no significant
visible damage to the container. Some material |
|
861
|
Friday, March 13, 2015, 13:36 |
Travis Cave | Spent Target Vault | Standard Operation | | ThO#1 | Spent Target Move | The ThO#1 has been placed in the storage
vault placed in pail #122 in spot 2B of the
vault. It was 6.2mSv/hr upon removal from |
|
862
|
Monday, March 16, 2015, 09:41 |
Travis Cave | ITE | Standard Operation | TM4 | UC#11 | Module move | TM#4 with UC#11 moved from the east target
station to the south hot cell. |
|
863
|
Monday, March 16, 2015, 14:16 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | No target | Module move | TM#4 from south hot cell to the conditioning
station no target is attached to the module. |
|
864
|
Tuesday, March 17, 2015, 10:33 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#11 | Spent Target Move | The spent UC#11 has benn moved from the
south hot cell to the spent target vault.
See attached PDF for details. |
|
866
|
Monday, March 23, 2015, 07:56 |
David Wang | ITE | Standard Operation | | | TH Shut Down Activities Schedule Feb 23th- Apr 15th update | This schedule is following Dons schedule
on module moves. See attachments for updating.
2015-03-27: Weekly update the schedule. |
   |
867
|
Monday, March 23, 2015, 14:03 |
chad fisher | South Hot-Cell | Standard Operation | | Ta#45 | Ta#45 inserted into hot cell | Ta#45 has been inserted into the hot cell.
Swipe taken of inner tool port area: 100000
counts/min. |
|
868
|
Tuesday, March 24, 2015, 08:46 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | No target | Module move | TM#4 with no target has been moved
from conditioning station to the south hot
cell. |
|
869
|
Tuesday, March 24, 2015, 09:47 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#45 | Ta#45 installed | Ta#45 has been installed onto TM4 and is
ready for leak and electrical check. High
current fasteners torqued to 130 in.lbs. |
|
870
|
Tuesday, March 24, 2015, 13:57 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#45 | Electrical check | TM#4 electrical checks with and without
the target installed, installed target is
Ta#45. |
 |